Difference between revisions of "Glossary"

From EITBOK
Jump to: navigation, search
m
Line 1: Line 1:
 
<table>
 
<table>
 
<tr valign="top"><td width="15%">'''Term'''</td><td>'''Meaning'''</td></tr>
 
<tr valign="top"><td width="15%">'''Term'''</td><td>'''Meaning'''</td></tr>
<tr valign="top"><td>acceptable</td><td>meeting stakeholder expectations that can be shown to be reasonable or merited (Source: ISO/IEC Std. 38500:2008, Corporate governance of information technology, ISO/IEC, 2008)</td></tr>
+
<tr valign="top"><td id="acceptable">acceptable</td><td>meeting stakeholder expectations that can be shown to be reasonable or merited (Source: ISO/IEC Std. 38500:2008, Corporate governance of information technology, ISO/IEC, 2008)</td></tr>
<tr valign="top"><td id="acceptance_criteria">acceptance criteria</td><td>(1) the criteria that a system or component must satisfy in order to be accepted by a user, customer, or other authorized entity (Source: ISO/IEC/IEEE Std. 24765:2010, Systems and software engineering &mdash; Vocabulary, ISO/IEC/IEEE, 2010) <br />(2) those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted (Source: A Guide to the Project Management Body of Knowledge [PMBOK[R] Guide] &mdash; Fourth Edition)</td></tr>
+
<tr valign="top"><td id="acceptance_criteria">acceptance criteria</td><td>(1) The criteria that a system or component must satisfy in order to be accepted by a user, customer, or other authorized entity (Source: ISO/IEC/IEEE Std. 24765:2010, Systems and software engineering &mdash; Vocabulary, ISO/IEC/IEEE, 2010) <br />(2) Those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted (Source: A Guide to the Project Management Body of Knowledge [PMBOK[R] Guide] &mdash; Fourth Edition)</td></tr>
<tr valign="top"><td>acquisition</td><td>(1) The process of obtaining a system, product, or service and ensuring its successful implementation. Acquisition also includes ensuring that proper mechanisms are in place to monitor the supplier’s/vendors’ performance in providing support and fulfilling other contractual obligations. Original to ITBOK.<br />(2) The process of obtaining a system or software product (Source: IEEE Std. 1062-1998, IEEE Recommended Practice for Software Acquisition, IEEE, 1998)<br />(3) the process of obtaining a system, software product or software service (Source: ISO/IEC 12207:2008, Systems and software engineering &mdash; Software life cycle processes, 4.2)<br />(4) the process of obtaining a system product or service (Source: ISO/IEC 15288:2008, Systems and software engineering &mdash; System life cycle processes, 4.2)</td></tr>
+
<tr valign="top"><td id="acquisition">acquisition</td><td>(1) The process of obtaining a system, product, or service and ensuring its successful implementation. Acquisition also includes ensuring that proper mechanisms are in place to monitor the supplier’s/vendors’ performance in providing support and fulfilling other contractual obligations. Original to ITBOK.<br />(2) The process of obtaining a system or software product (Source: IEEE Std. 1062-1998, IEEE Recommended Practice for Software Acquisition, IEEE, 1998)<br />(3) The process of obtaining a system, software product or software service (Source: ISO/IEC 12207:2008, Systems and software engineering &mdash; Software life cycle processes, 4.2)<br />(4) The process of obtaining a system product or service (Source: ISO/IEC 15288:2008, Systems and software engineering &mdash; System life cycle processes, 4.2)</td></tr>
<tr valign="top"><td>acquisition strategy</td><td>specific approach to acquiring products and services that is based on considerations of supply sources, acquisition methods, requirements specification types, contract or agreement types, and related acquisition risks (Source: ISO/IEC 24765:2009, Systems and software engineering vocabulary)</td></tr>
+
<tr valign="top"><td id="acquisition_strategy">acquisition strategy</td><td>A specific approach to acquiring products and services that is based on considerations of supply sources, acquisition methods, requirements specification types, contract or agreement types, and related acquisition risks (Source: ISO/IEC 24765:2009, Systems and software engineering vocabulary)</td></tr>
<tr valign="top"><td>ADKAR model</td><td>A goal-oriented change management model that allows change management teams to focus their activities on specific business results. The model has its origins in aligning traditional change management activities to a given result or goal. (Source: http://www.change-management.com/tutorial-adkar-overview-mod1.htm)</td></tr>
+
<tr valign="top"><td id="adkar">ADKAR model</td><td>A goal-oriented change management model that allows change management teams to focus their activities on specific business results. The model has its origins in aligning traditional change management activities to a given result or goal. (Source: http://www.change-management.com/tutorial-adkar-overview-mod1.htm)</td></tr>
<tr valign="top"><td>AOA</td><td>analysis of alternatives</td></tr>
+
<tr valign="top"><td id="aoa">AoA</td><td>analysis of alternatives</td></tr>
<tr valign="top"><td>BCA</td><td>business case analysis</td></tr>
+
<tr valign="top"><td id="bca">BCA</td><td>business case analysis</td></tr>
<tr valign="top"><td>BCP</td><td>business continuity plan</td></tr>
+
<tr valign="top"><td id="bcp">BCP</td><td>business continuity plan</td></tr>
<tr valign="top"><td>BMM</td><td>business (enterprise) motivation model</td></tr>
+
<tr valign="top"><td id="bmm">BMM</td><td>business (enterprise) motivation model</td></tr>
<tr valign="top"><td>BU</td><td>business unit</td></tr>
+
<tr valign="top"><td id="bu">BU</td><td>business unit</td></tr>
<tr valign="top"><td>CBA</td><td>cost benefit analysis</td></tr>
+
<tr valign="top"><td id="cba">CBA</td><td>cost benefit analysis</td></tr>
<tr valign="top"><td>change agent</td><td>A person from inside or outside an organization who helps the organization transform itself by focusing on such matters as organizational effectiveness, improvement, and development. (Source: study.com/academy/lesson/change-agent-definition-role-quiz.html)</td></tr>
+
<tr valign="top"><td id="change_agent">change agent</td><td>A person from inside or outside an organization who helps the organization transform itself by focusing on such matters as organizational effectiveness, improvement, and development. (Source: study.com/academy/lesson/change-agent-definition-role-quiz.html)</td></tr>
<tr valign="top"><td>CMDB</td><td>configuration management database</td></tr>
+
<tr valign="top"><td id="cmdb">CMDB</td><td>configuration management database</td></tr>
<tr valign="top"><td>CMMI</td><td>capability maturity model integration</td></tr>
+
<tr valign="top"><td id="cmmi">CMMI</td><td>capability maturity model integration</td></tr>
<tr valign="top"><td>CMMI for Acquisition (CMMI-ACQ)</td><td>product and service acquisition</td></tr>
+
<tr valign="top"><td id="cmmi_acq">CMMI for Acquisition (CMMI-ACQ)</td><td>product and service acquisition</td></tr>
<tr valign="top"><td>CMMI for Data (CMMI-DMM)</td><td>data management</td></tr>
+
<tr valign="top"><td id="cmmi_dmm">CMMI for Data (CMMI-DMM)</td><td>data management</td></tr>
<tr valign="top"><td>CMMI for Development (CMMI-DEV)</td><td>product and service development</td></tr>
+
<tr valign="top"><td id="cmmi_dev">CMMI for Development (CMMI-DEV)</td><td>product and service development</td></tr>
<tr valign="top"><td>CMMI for Services (CMMI-SVC)</td><td>service establishment and management</td></tr>
+
<tr valign="top"><td id="cmmi_svc">CMMI for Services (CMMI-SVC)</td><td>service establishment and management</td></tr>
<tr valign="top"><td>COBIT</td><td>Control Objectives for Information and Related Technology</td></tr>
+
<tr valign="top"><td id="cobit">COBIT</td><td>Control Objectives for Information and Related Technology</td></tr>
<tr valign="top"><td>conceptual design</td><td>describes the proposed solution in a functional manner that could be easily understood by a future user, including what the solution will look like and how it will behave</td></tr>
+
<tr valign="top"><td id="conceptual_design">conceptual design</td><td>describes the proposed solution in a functional manner that could be easily understood by a future user, including what the solution will look like and how it will behave</td></tr>
<tr valign="top"><td>ConOps</td><td>A concept of operations document. A ConOps is a user-oriented document that describes system characteristics for a proposed system from the users’ viewpoint. The ConOps document is used to communicate overall quantitative and qualitative system characteristics to the user, buyer, developer, and other organizational elements (for example, training, facilities, staffing, and maintenance). It is used to describe the user organizations, missions, and organizational objectives from an integrated systems point of view.</td></tr>
+
<tr valign="top"><td id="conops">ConOps</td><td>A concept of operations document. A ConOps is a user-oriented document that describes system characteristics for a proposed system from the users’ viewpoint. The ConOps document is used to communicate overall quantitative and qualitative system characteristics to the user, buyer, developer, and other organizational elements (for example, training, facilities, staffing, and maintenance). It is used to describe the user organizations, missions, and organizational objectives from an integrated systems point of view.</td></tr>
<tr valign="top"><td>constraint</td><td>(1) an externally imposed limitation on system requirements, design, or implementation or on the process used to develop or modify a system (IEEE Std. 29148-2011, Systems and software engineering &mdash; Life cycle processes &mdash; Requirements engineering, IEEE, 2011) <br />(2) a statement that expresses measurable bounds for an element or function of the system (IEEE Std. 29148-2011, Systems and software engineering &mdash; Life cycle processes &mdash; Requirements engineering, IEEE, 2011)</td></tr>
+
<tr valign="top"><td id="constraint">constraint</td><td>(1) An externally imposed limitation on system requirements, design, or implementation or on the process used to develop or modify a system (IEEE Std. 29148-2011, Systems and software engineering &mdash; Life cycle processes &mdash; Requirements engineering, IEEE, 2011) <br />(2) A statement that expresses measurable bounds for an element or function of the system (IEEE Std. 29148-2011, Systems and software engineering &mdash; Life cycle processes &mdash; Requirements engineering, IEEE, 2011)</td></tr>
<tr valign="top"><td>contract</td><td>binding agreement between two parties, especially enforceable by law, or a similar internal agreement wholly within an organization (Source: ISO/IEC 12207:2008, Systems and software engineering &mdash; Software life cycle processes, ISO/IEC, 2008)</td></tr>
+
<tr valign="top"><td id="contract">contract</td><td>binding agreement between two parties, especially enforceable by law, or a similar internal agreement wholly within an organization (Source: ISO/IEC 12207:2008, Systems and software engineering &mdash; Software life cycle processes, ISO/IEC, 2008)</td></tr>
<tr valign="top"><td>COTS</td><td> commercial off the shelf</td></tr>
+
<tr valign="top"><td id="cots">COTS</td><td> commercial off the shelf</td></tr>
<tr valign="top"><td>CP</td><td>consolidated platform</td></tr>
+
<tr valign="top"><td id="cp">CP</td><td>consolidated platform</td></tr>
<tr valign="top"><td>CSP</td><td>cost schedule performance</td></tr>
+
<tr valign="top"><td id="csp">CSP</td><td>cost schedule performance</td></tr>
<tr valign="top"><td>DoDAF</td><td>Department of Defense Architecture Framework, an architecture framework for the United States Department of Defense (DoD) that provides visualization infrastructure for specific stakeholders concerns through viewpoints organized by various views</td></tr>
+
<tr valign="top"><td id="cuprmd">CUPRMD</td><td>IBM’s standard (pronounced “cooperMD”) specifying capability, usability, performance, reliability, maintainability, and documentation as key quality vectors for product quality</td></tr>
<tr valign="top"><td>domain</td><td>A specific sphere of activity or knowledge. A domain can correspond to the boundaries of an organization, a job function, or even a particular task.</td></tr>
+
<tr valign="top"><td id="dodaf">DoDAF</td><td>Department of Defense Architecture Framework, an architecture framework for the United States Department of Defense (DoD) that provides visualization infrastructure for specific stakeholders concerns through viewpoints organized by various views</td></tr>
<tr valign="top"><td>domain elicitation</td><td>collecting the right information from SMEs, stakeholders, or consumers about how the solution should function</td></tr>
+
<tr valign="top"><td id="domain">domain</td><td>A specific sphere of activity or knowledge. A domain can correspond to the boundaries of an organization, a job function, or even a particular task.</td></tr>
<tr valign="top"><td>DR</td><td>disaster recovery:<br />1) In computer system operations, the return to normal operation after a hardware or software failure.<br />2) Activities and programs designed to return the organization to an acceptable condition. The ability to respond to an interruption in services by implementing a disaster recovery plan to restore an organization's critical business functions. td></tr>
+
<tr valign="top"><td id="domain_elic">domain elicitation</td><td>collecting the right information from SMEs, stakeholders, or consumers about how the solution should function</td></tr>
<tr valign="top"><td>DRP</td><td>disaster recovery plan, a set of human, physical, technical, and procedural resources to recover, within a defined time and cost, an activity interrupted by an emergency or disaster</td></tr>
+
<tr valign="top"><td id="dr">DR</td><td>disaster recovery:<br />1) In computer system operations, the return to normal operation after a hardware or software failure.<br />2) Activities and programs designed to return the organization to an acceptable condition. The ability to respond to an interruption in services by implementing a disaster recovery plan to restore an organization's critical business functions. td></tr>
<tr valign="top"><td>DT</td><td>disaster tolerance, the time gap a business can accept the non-availability of EIT facilities</td></tr>
+
<tr valign="top"><td id="drp">DRP</td><td>A disaster recovery plan is a set of human, physical, technical, and procedural resources to recover, within a defined time and cost, an activity interrupted by an emergency or disaster</td></tr>
<tr valign="top"><td>EA</td><td>enterprise architecture</td></tr>
+
<tr valign="top"><td id="dt">DT</td><td>disaster tolerance, the time gap a business can accept the non-availability of EIT facilities</td></tr>
<tr valign="top"><td>EIT</td><td>enterprise information technology</td></tr>
+
<tr valign="top"><td id="ea">EA</td><td>enterprise architecture</td></tr>
<tr valign="top"><td>FLURPS</td><td>functionality, localizability, usability, reliability, performance, supportability</td></tr>
+
<tr valign="top"><td id="eit">EIT</td><td>enterprise information technology</td></tr>
<tr valign="top"><td>FSM</td><td>functional size measurement</td></tr>
+
<tr valign="top"><td id="flurps">FLURPS</td><td>functionality, localizability, usability, reliability, performance, supportability</td></tr>
<tr valign="top"><td>GSC</td><td>global standards collaboration</td></tr>
+
<tr valign="top"><td id="fsm">FSM</td><td>functional size measurement</td></tr>
<tr valign="top"><td>HITSR</td><td>Healthcare Information Technology Standards Panel</td></tr>
+
<tr valign="top"><td id="gsc">GSC</td><td>global standards collaboration</td></tr>
<tr valign="top"><td>ICT</td><td>information and communications technology</td></tr>
+
<tr valign="top"><td id="hitsr">HITSR</td><td>Healthcare Information Technology Standards Panel</td></tr>
<tr valign="top"><td>IEEE</td><td>Institute of Electrical and Electronics Engineers</td></tr>
+
<tr valign="top"><td id="ict">ICT</td><td>information and communications technology</td></tr>
<tr valign="top"><td>INCITS</td><td>International Committee for Information Technology Standards</td></tr>
+
<tr valign="top"><td id="ieee">IEEE</td><td>Institute of Electrical and Electronics Engineers</td></tr>
<tr valign="top"><td>ISACA</td><td>Information Systems Audit and Control Association</td></tr>
+
<tr valign="top"><td id="incits">INCITS</td><td>International Committee for Information Technology Standards</td></tr>
<tr valign="top"><td>ISO</td><td>International Organization for Standardization</td></tr>
+
<tr valign="top"><td id="isaca">ISACA</td><td>Information Systems Audit and Control Association</td></tr>
<tr valign="top"><td>IT</td><td>information technology</td></tr>
+
<tr valign="top"><td id="iso">ISO</td><td>International Organization for Standardization</td></tr>
<tr valign="top"><td>ITIL</td><td>information technology infrastructure library </td></tr>
+
<tr valign="top"><td id="itil">ITIL</td><td>information technology infrastructure library </td></tr>
<tr valign="top"><td>ITSC</td><td>information technology support center</td></tr>
+
<tr valign="top"><td id="itsc">ITSC</td><td>information technology support center</td></tr>
<tr valign="top"><td>IVR</td><td>interactive voice response</td></tr>
+
<tr valign="top"><td id="ivr">IVR</td><td>interactive voice response</td></tr>
<tr valign="top"><td>KA</td><td>knowledge area</td></tr>
+
<tr valign="top"><td id="ka">KA</td><td>knowledge area</td></tr>
<tr valign="top"><td>KPI</td><td>key performance indicator</td></tr>
+
<tr valign="top"><td id="kpi">KPI</td><td>key performance indicator</td></tr>
<tr valign="top"><td>KTBR</td><td>keep the business running</td></tr>
+
<tr valign="top"><td id="ktbr">KTBR</td><td>keep the business running</td></tr>
<tr valign="top"><td>KTLO</td><td>keep the lights on</td></tr>
+
<tr valign="top"><td id="ktlo">KTLO</td><td>keep the lights on</td></tr>
<tr valign="top"><td>LCCE</td><td>life cycle cost estimate</td></tr>
+
<tr valign="top"><td id="lcce">LCCE</td><td>life cycle cost estimate</td></tr>
<tr valign="top"><td>logical design</td><td>defines objects, entities, their attributes, and their relationships. It also describes the business rules associated with these entities</td></tr>
+
<tr valign="top"><td id="logical_design">logical design</td><td>defines objects, entities, their attributes, and their relationships. It also describes the business rules associated with these entities</td></tr>
<tr valign="top"><td>MOE</td><td>measures of effectiveness </td></tr>
+
<tr valign="top"><td id="moe">MOE</td><td>measures of effectiveness </td></tr>
<tr valign="top"><td>NIST</td><td>National Institute of Standards and Technology</td></tr>
+
<tr valign="top"><td id="nist">NIST</td><td>National Institute of Standards and Technology</td></tr>
<tr valign="top"><td>OCM</td><td>organizational change management</td></tr>
+
<tr valign="top"><td id="ocm">OCM</td><td>organizational change management</td></tr>
<tr valign="top"><td>OLA</td><td>operational level agreement</td></tr>
+
<tr valign="top"><td id="ola">OLA</td><td>operational level agreement</td></tr>
<tr valign="top"><td>physical design</td><td>Also called the technical design. Where the conceptual and logic designs are converted to a definition of how the solution will be implemented in hardware, software, and potentially other media. The physical design is developed by the construction team not by the requirements team.</td></tr>
+
<tr valign="top"><td id="physical_design">physical design</td><td>Also called the technical design. Where the conceptual and logic designs are converted to a definition of how the solution will be implemented in hardware, software, and potentially other media. The physical design is developed by the construction team not by the requirements team.</td></tr>
<tr valign="top"><td>PMO</td><td></td></tr>
+
<tr valign="top"><td id="pmo">PMO</td><td>The project management office is a group or department within an enterprise that defines and maintains standards for project management within the organization. The PMO strives to standardize and introduce economies of repetition in the execution of projects.</td></tr>
<tr valign="top"><td>QA</td><td>quality assurance</td></tr>
+
<tr valign="top"><td id="qa">QA</td><td>Quality assurance is a way of preventing mistakes or defects in manufactured products and avoiding problems when delivering solutions or services to customers; which ISO 9000 defines as "part of quality management focused on providing confidence that quality requirements will be fulfilled."</td></tr>
<tr valign="top"><td>QC</td><td>quality control</td></tr>
+
<tr valign="top"><td id="qc">QC</td><td>Quality control is a process by which entities review the quality of all factors involved in production. ISO 9000 defines quality control as "A part of quality management focused on fulfilling quality requirements."</td></tr>
<tr valign="top"><td>QMS</td><td>quality management system</td></tr>
+
<tr valign="top"><td id="qms">QMS</td><td>A quality management system is a collection of business processes focused on achieving quality policy and quality objectives to meet customer requirements. It is expressed as the organizational structure, policies, procedures, processes, and resources needed to implement quality management.</td></tr>
<tr valign="top"><td>resource management</td><td>identification, estimation, allocation, and monitoring of the means used to develop a product or perform a service (Source: ISO/IEC/IEEE Std. 24765:2010, Systems and software engineering &mdash; Vocabulary, ISO/IEC/IEEE, 2010)</td></tr>
+
<tr valign="top"><td id="resource_mgmt">resource management</td><td>identification, estimation, allocation, and monitoring of the means used to develop a product or perform a service (Source: ISO/IEC/IEEE Std. 24765:2010, Systems and software engineering &mdash; Vocabulary, ISO/IEC/IEEE, 2010)</td></tr>
<tr valign="top"><td>RFI </td><td>request for information </td></tr>
+
<tr valign="top"><td id="rfi">RFI </td><td>request for information </td></tr>
<tr valign="top"><td>RFP </td><td>request for proposal</td></tr>
+
<tr valign="top"><td id="rfp">RFP </td><td>request for proposal</td></tr>
<tr valign="top"><td>RFQ</td><td>request for quotation</td></tr>
+
<tr valign="top"><td id="rfq">RFQ</td><td>request for quotation</td></tr>
<tr valign="top"><td>RFT</td><td>request for tender</td></tr>
+
<tr valign="top"><td id="rft">RFT</td><td>request for tender</td></tr>
<tr valign="top"><td>risk</td><td>a function of the probability of occurrence of a given threat and the potential adverse consequences of that threat’s occurrence (Source: ISO/IEC Std. 15026-3:2011, Systems and software engineering &mdash; Systems and software assurance &mdash; Part 3: System integrity levels, ISO/IEC, 2011)</td></tr>
+
<tr valign="top"><td id="risk">risk</td><td>Risk is a function of the probability of occurrence of a given threat and the potential adverse consequences of that threat’s occurrence (Source: ISO/IEC Std. 15026-3:2011, Systems and software engineering &mdash; Systems and software assurance &mdash; Part 3: System integrity levels, ISO/IEC, 2011)</td></tr>
<tr valign="top"><td>ROI</td><td>return on investment</td></tr>
+
<tr valign="top"><td id="roi">ROI</td><td>The return on investment is the benefit to the investor resulting from an investment of some resource. A high ROI means the investment gains compare favorably to investment cost. As a performance measure, ROI is used to evaluate the efficiency of an investment or to compare the efficiency of a number of different investments.</td></tr>
<tr valign="top"><td>RPO</td><td>recovery point objective, the point in time all integrated systems are to be recovered to, taking into account sync points and data transfer points to ensure data quality and integrity</td></tr>
+
<tr valign="top"><td id="rpo">RPO</td><td>The recovery point objective is the point in time all integrated systems are to be recovered to, taking into account sync points and data transfer points to ensure data quality and integrity</td></tr>
<tr valign="top"><td>RTO</td><td>recovery time objective, long it will take to return an EIT service to active duty</td></tr>
+
<tr valign="top"><td id="rto">RTO</td><td>The recovery time objective is how long it will take to return an EIT service to active duty</td></tr>
<tr valign="top"><td>SaaS</td><td>software as a service</td></tr>
+
<tr valign="top"><td id="saas">SaaS</td><td>Software as a service is a software licensing and delivery model in which software is licensed on a subscription basis and is centrally hosted. It is sometimes referred to as "on-demand software." SaaS is typically accessed by users using a thin client via a web browser. </td></tr>
<tr valign="top"><td>SAT</td><td></td></tr>
+
<tr valign="top"><td id="scm">SCM</td><td>software configuration management plan</td></tr>
<tr valign="top"><td>SCM</td><td>software configuration management plan</td></tr>
+
<tr valign="top"><td id="sdd">SDD</td><td>Software design description. An SDD is a representation of a software system that is used as a medium for communicating software design information.</td></tr>
<tr valign="top"><td>SDD</td><td>Software design description. An SDD is a representation of a software system that is used as a medium for communicating software design information.</td></tr>
+
<tr valign="top"><td id="service_cat">service catalogue</td><td>(ITIL service design) A database or structured document with information about all live EIT services, including those available for deployment. The service catalogue is the only part of the ITIL service portfolio published to customers, and is used to support the sale and delivery of IT services. the service catalogue includes information about deliverables, prices, contact points, ordering, and request processes.</td></tr>
<tr valign="top"><td>service catalogue</td><td>(ITIL service design) A database or structured document with information about all live EIT services, including those available for deployment. The service catalogue is the only part of the ITIL service portfolio published to customers, and is used to support the sale and delivery of IT services. the service catalogue includes information about deliverables, prices, contact points, ordering, and request processes.</td></tr>
+
<tr valign="top"><td id="sfia">SFIA</td><td>Skills Framework for the Information Age (pronounced like the name Sophia) is a model for describing and managing competencies for ICT professionals for the 21st century, and is intended to help match the skills of the workforce to the needs of the business. It maps out the range of skills as a two-dimensional table, by tagging each skill with a category and responsibility level.</td></tr>
<tr valign="top"><td>SFIA</td><td>Skills Framework for the Information Age</td></tr>
+
<tr valign="top"><td id="shadow_eit">shadow EIT</td><td>shadow enterprise information technology</td></tr>
<tr valign="top"><td>shadow EIT</td><td>shadow enterprise information technology</td></tr>
+
<tr valign="top"><td id="sla">SLA</td><td>A service level agreement is a part of a service contract where a service is formally defined. Particular aspects of the service &mdash; scope, quality, responsibilities &mdash; are agreed between the service provider and the service user. A common feature of an SLA is a contracted delivery time (of the service or performance).</td></tr>
<tr valign="top"><td>SLA</td><td>service level agreement</td></tr>
+
<tr valign="top"><td id="splcp">SPLCP</td><td>software project life-cycle process</td></tr>
<tr valign="top"><td>SPLCP</td><td>software project life-cycle process</td></tr>
+
<tr valign="top"><td id="sme">SME</td><td>A subject-matter expert (or domain expert) is a person who is an authority in a particular area or topic.</td></tr>
<tr valign="top"><td>SME</td><td>subject matter expert</td></tr>
+
<tr valign="top"><td id="so">SO</td><td>service operations</td></tr>
<tr valign="top"><td>SO</td><td>service operations</td></tr>
+
<tr valign="top"><td id="solution">solution</td><td>a set of changes to the current state of an enterprise that will enable the enterprise to meet a need, solve a problem, or take advantage of an opportunity</td></tr>
<tr valign="top"><td>solution</td><td>a set of changes to the current state of an enterprise that will enable the enterprise to meet a need, solve a problem, or take advantage of an opportunity</td></tr>
+
<tr valign="top"><td id="sox">SOX</td><td>Sarbanes-Oxley, a United States federal law to protect investors by improving the accuracy and reliability of corporate disclosures made pursuant to the securities laws, and for other purposes.</td></tr>
<tr valign="top"><td>SOX</td><td>Sarbanes Oxley</td></tr>
+
<tr valign="top"><td id="spoc">SPOC</td><td>A single point of contact is a person or a department serving as the coordinator or focal point of information concerning an activity or program. </td></tr>
<tr valign="top"><td>SPOC</td><td>single point of contact</td></tr>
+
<tr valign="top"><td id="srs">SRS</td><td>software requirements specification</td></tr>
<tr valign="top"><td>SRS</td><td>software requirements specification</td></tr>
+
<tr valign="top"><td id="stakeholder">stakeholder</td><td>a person or group that has an investment, share, or interest in something, as a business or industry. (Source: http://dictionary.reference.com/browse/stakeholder)</td></tr>
<tr valign="top"><td>stakeholder</td><td>a person or group that has an investment, share, or interest in something, as a business or industry. (Source: http://dictionary.reference.com/browse/stakeholder)</td></tr>
+
<tr valign="top"><td id="swecom">SWECOM</td><td>software engineering competency model (formerly known as SECOM)</td></tr>
<tr valign="top"><td>SWECOM</td><td>software engineering competency model, formerly known as SECOM</td></tr>
+
<tr valign="top"><td id="swot">SWOT</td><td>strengths, weaknesses, opportunities. and threats involved in a project or in a business venture (Source: A Guide to the Project Management Body of Knowledge [PMBOK[R] Guide], Fourth Edition)</td></tr>
<tr valign="top"><td>SWOT</td><td>strengths, weaknesses, opportunities. and threats involved in a project or in a business venture (Source: A Guide to the Project Management Body of Knowledge [PMBOK[R] Guide], Fourth Edition)</td></tr>
+
<tr valign="top"><td id="syrs">SyRS</td><td>system requirements specification</td></tr>
<tr valign="top"><td>SyRS</td><td>system requirements specification</td></tr>
+
<tr valign="top"><td id="tco">TCO</td><td>Total cost of ownership is a financial estimate intended to help buyers and owners determine the direct and indirect costs of a product or system. It is a management accounting concept that can be used in full cost accounting or even ecological economics where it includes social costs.</td></tr>
<tr valign="top"><td>TCO</td><td>total cost of ownership</td></tr>
+
<tr valign="top"><td id="togaf">TOGAF</td><td>The Open Group Architecture Framework is a framework for enterprise architecture that provides an approach for designing, planning, implementing, and governing an enterprise information technology architecture.</td></tr>
<tr valign="top"><td>TOGAF</td><td>The Open Group Architecture Framework </td></tr>
+
<tr valign="top"><td id="uat">UAT</td><td>User acceptance testing, which consists of a process of verifying that a solution works for the user. UAT is not system testing (ensuring software does not crash and meets documented requirements), but rather ensures that the solution will work for the user i.e., test the user accepts the solution (software vendors often refer to this as "beta testing").</td></tr>
<tr valign="top"><td>UAT</td><td></td></tr>
+
<tr valign="top"><td id="vandv">V&V</td><td>software verification and validation</td></tr>
<tr valign="top"><td>V&V</td><td>software verification and validation</td></tr>
+
<tr valign="top"><td id="XXX">&nbsp;</td><td>&nbsp;</td></tr>
<tr valign="top"><td>&nbsp;</td><td>&nbsp;</td></tr>
+
 
</table>
 
</table>

Revision as of 01:30, 17 October 2015

TermMeaning
acceptablemeeting stakeholder expectations that can be shown to be reasonable or merited (Source: ISO/IEC Std. 38500:2008, Corporate governance of information technology, ISO/IEC, 2008)
acceptance criteria(1) The criteria that a system or component must satisfy in order to be accepted by a user, customer, or other authorized entity (Source: ISO/IEC/IEEE Std. 24765:2010, Systems and software engineering — Vocabulary, ISO/IEC/IEEE, 2010)
(2) Those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted (Source: A Guide to the Project Management Body of Knowledge [PMBOK[R] Guide] — Fourth Edition)
acquisition(1) The process of obtaining a system, product, or service and ensuring its successful implementation. Acquisition also includes ensuring that proper mechanisms are in place to monitor the supplier’s/vendors’ performance in providing support and fulfilling other contractual obligations. Original to ITBOK.
(2) The process of obtaining a system or software product (Source: IEEE Std. 1062-1998, IEEE Recommended Practice for Software Acquisition, IEEE, 1998)
(3) The process of obtaining a system, software product or software service (Source: ISO/IEC 12207:2008, Systems and software engineering — Software life cycle processes, 4.2)
(4) The process of obtaining a system product or service (Source: ISO/IEC 15288:2008, Systems and software engineering — System life cycle processes, 4.2)
acquisition strategyA specific approach to acquiring products and services that is based on considerations of supply sources, acquisition methods, requirements specification types, contract or agreement types, and related acquisition risks (Source: ISO/IEC 24765:2009, Systems and software engineering vocabulary)
ADKAR modelA goal-oriented change management model that allows change management teams to focus their activities on specific business results. The model has its origins in aligning traditional change management activities to a given result or goal. (Source: http://www.change-management.com/tutorial-adkar-overview-mod1.htm)
AoAanalysis of alternatives
BCAbusiness case analysis
BCPbusiness continuity plan
BMMbusiness (enterprise) motivation model
BUbusiness unit
CBAcost benefit analysis
change agentA person from inside or outside an organization who helps the organization transform itself by focusing on such matters as organizational effectiveness, improvement, and development. (Source: study.com/academy/lesson/change-agent-definition-role-quiz.html)
CMDBconfiguration management database
CMMIcapability maturity model integration
CMMI for Acquisition (CMMI-ACQ)product and service acquisition
CMMI for Data (CMMI-DMM)data management
CMMI for Development (CMMI-DEV)product and service development
CMMI for Services (CMMI-SVC)service establishment and management
COBITControl Objectives for Information and Related Technology
conceptual designdescribes the proposed solution in a functional manner that could be easily understood by a future user, including what the solution will look like and how it will behave
ConOpsA concept of operations document. A ConOps is a user-oriented document that describes system characteristics for a proposed system from the users’ viewpoint. The ConOps document is used to communicate overall quantitative and qualitative system characteristics to the user, buyer, developer, and other organizational elements (for example, training, facilities, staffing, and maintenance). It is used to describe the user organizations, missions, and organizational objectives from an integrated systems point of view.
constraint(1) An externally imposed limitation on system requirements, design, or implementation or on the process used to develop or modify a system (IEEE Std. 29148-2011, Systems and software engineering — Life cycle processes — Requirements engineering, IEEE, 2011)
(2) A statement that expresses measurable bounds for an element or function of the system (IEEE Std. 29148-2011, Systems and software engineering — Life cycle processes — Requirements engineering, IEEE, 2011)
contractbinding agreement between two parties, especially enforceable by law, or a similar internal agreement wholly within an organization (Source: ISO/IEC 12207:2008, Systems and software engineering — Software life cycle processes, ISO/IEC, 2008)
COTS commercial off the shelf
CPconsolidated platform
CSPcost schedule performance
CUPRMDIBM’s standard (pronounced “cooperMD”) specifying capability, usability, performance, reliability, maintainability, and documentation as key quality vectors for product quality
DoDAFDepartment of Defense Architecture Framework, an architecture framework for the United States Department of Defense (DoD) that provides visualization infrastructure for specific stakeholders concerns through viewpoints organized by various views
domainA specific sphere of activity or knowledge. A domain can correspond to the boundaries of an organization, a job function, or even a particular task.
domain elicitationcollecting the right information from SMEs, stakeholders, or consumers about how the solution should function
DRdisaster recovery:
1) In computer system operations, the return to normal operation after a hardware or software failure.
2) Activities and programs designed to return the organization to an acceptable condition. The ability to respond to an interruption in services by implementing a disaster recovery plan to restore an organization's critical business functions. td>
DRPA disaster recovery plan is a set of human, physical, technical, and procedural resources to recover, within a defined time and cost, an activity interrupted by an emergency or disaster
DTdisaster tolerance, the time gap a business can accept the non-availability of EIT facilities
EAenterprise architecture
EITenterprise information technology
FLURPSfunctionality, localizability, usability, reliability, performance, supportability
FSMfunctional size measurement
GSCglobal standards collaboration
HITSRHealthcare Information Technology Standards Panel
ICTinformation and communications technology
IEEEInstitute of Electrical and Electronics Engineers
INCITSInternational Committee for Information Technology Standards
ISACAInformation Systems Audit and Control Association
ISOInternational Organization for Standardization
ITILinformation technology infrastructure library
ITSCinformation technology support center
IVRinteractive voice response
KAknowledge area
KPIkey performance indicator
KTBRkeep the business running
KTLOkeep the lights on
LCCElife cycle cost estimate
logical designdefines objects, entities, their attributes, and their relationships. It also describes the business rules associated with these entities
MOEmeasures of effectiveness
NISTNational Institute of Standards and Technology
OCMorganizational change management
OLAoperational level agreement
physical designAlso called the technical design. Where the conceptual and logic designs are converted to a definition of how the solution will be implemented in hardware, software, and potentially other media. The physical design is developed by the construction team not by the requirements team.
PMOThe project management office is a group or department within an enterprise that defines and maintains standards for project management within the organization. The PMO strives to standardize and introduce economies of repetition in the execution of projects.
QAQuality assurance is a way of preventing mistakes or defects in manufactured products and avoiding problems when delivering solutions or services to customers; which ISO 9000 defines as "part of quality management focused on providing confidence that quality requirements will be fulfilled."
QCQuality control is a process by which entities review the quality of all factors involved in production. ISO 9000 defines quality control as "A part of quality management focused on fulfilling quality requirements."
QMSA quality management system is a collection of business processes focused on achieving quality policy and quality objectives to meet customer requirements. It is expressed as the organizational structure, policies, procedures, processes, and resources needed to implement quality management.
resource managementidentification, estimation, allocation, and monitoring of the means used to develop a product or perform a service (Source: ISO/IEC/IEEE Std. 24765:2010, Systems and software engineering — Vocabulary, ISO/IEC/IEEE, 2010)
RFI request for information
RFP request for proposal
RFQrequest for quotation
RFTrequest for tender
riskRisk is a function of the probability of occurrence of a given threat and the potential adverse consequences of that threat’s occurrence (Source: ISO/IEC Std. 15026-3:2011, Systems and software engineering — Systems and software assurance — Part 3: System integrity levels, ISO/IEC, 2011)
ROIThe return on investment is the benefit to the investor resulting from an investment of some resource. A high ROI means the investment gains compare favorably to investment cost. As a performance measure, ROI is used to evaluate the efficiency of an investment or to compare the efficiency of a number of different investments.
RPOThe recovery point objective is the point in time all integrated systems are to be recovered to, taking into account sync points and data transfer points to ensure data quality and integrity
RTOThe recovery time objective is how long it will take to return an EIT service to active duty
SaaSSoftware as a service is a software licensing and delivery model in which software is licensed on a subscription basis and is centrally hosted. It is sometimes referred to as "on-demand software." SaaS is typically accessed by users using a thin client via a web browser.
SCMsoftware configuration management plan
SDDSoftware design description. An SDD is a representation of a software system that is used as a medium for communicating software design information.
service catalogue(ITIL service design) A database or structured document with information about all live EIT services, including those available for deployment. The service catalogue is the only part of the ITIL service portfolio published to customers, and is used to support the sale and delivery of IT services. the service catalogue includes information about deliverables, prices, contact points, ordering, and request processes.
SFIASkills Framework for the Information Age (pronounced like the name Sophia) is a model for describing and managing competencies for ICT professionals for the 21st century, and is intended to help match the skills of the workforce to the needs of the business. It maps out the range of skills as a two-dimensional table, by tagging each skill with a category and responsibility level.
shadow EITshadow enterprise information technology
SLAA service level agreement is a part of a service contract where a service is formally defined. Particular aspects of the service — scope, quality, responsibilities — are agreed between the service provider and the service user. A common feature of an SLA is a contracted delivery time (of the service or performance).
SPLCPsoftware project life-cycle process
SMEA subject-matter expert (or domain expert) is a person who is an authority in a particular area or topic.
SOservice operations
solutiona set of changes to the current state of an enterprise that will enable the enterprise to meet a need, solve a problem, or take advantage of an opportunity
SOXSarbanes-Oxley, a United States federal law to protect investors by improving the accuracy and reliability of corporate disclosures made pursuant to the securities laws, and for other purposes.
SPOCA single point of contact is a person or a department serving as the coordinator or focal point of information concerning an activity or program.
SRSsoftware requirements specification
stakeholdera person or group that has an investment, share, or interest in something, as a business or industry. (Source: http://dictionary.reference.com/browse/stakeholder)
SWECOMsoftware engineering competency model (formerly known as SECOM)
SWOTstrengths, weaknesses, opportunities. and threats involved in a project or in a business venture (Source: A Guide to the Project Management Body of Knowledge [PMBOK[R] Guide], Fourth Edition)
SyRSsystem requirements specification
TCOTotal cost of ownership is a financial estimate intended to help buyers and owners determine the direct and indirect costs of a product or system. It is a management accounting concept that can be used in full cost accounting or even ecological economics where it includes social costs.
TOGAFThe Open Group Architecture Framework is a framework for enterprise architecture that provides an approach for designing, planning, implementing, and governing an enterprise information technology architecture.
UATUser acceptance testing, which consists of a process of verifying that a solution works for the user. UAT is not system testing (ensuring software does not crash and meets documented requirements), but rather ensures that the solution will work for the user i.e., test the user accepts the solution (software vendors often refer to this as "beta testing").
V&Vsoftware verification and validation