Difference between revisions of "Construction"
(59 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | < | + | <table border="3"> |
− | + | <tr><td> | |
− | + | <table> | |
+ | <tr> | ||
+ | <td width="60%"><font color="#246196">'''Welcome to the initial version of the EITBOK wiki. Like all wikis, it is a work in progress and may contain errors. We welcome feedback, edits, and real-world examples. [[Main_Page#How to Make Comments and Suggestions|Click here]] for instructions about how to send us feedback.''' </font></td> | ||
+ | <td width="20%">[[File:Ieee logo 1.png|100px|center]]</td> | ||
+ | <td width="20%"> [[File:Acm_logo_3.png|175px|center]]</td> | ||
+ | </tr></table> | ||
+ | </td></tr></table> | ||
+ | <p> </p> | ||
<h2>Introduction</h2> | <h2>Introduction</h2> | ||
− | + | <p>Once the requirements for a solution have been agreed upon and analyzed, the development team can start constructing the solution based upon the conceptual and logical designs. This construction phase can be short and relatively simple, or it can be long and complex. Recommended practices include constructing, testing, and integrating the pieces as they emerge. In any case, it requires strong technical, software, and service project management skills. </p> | |
− | Once the requirements for a solution have been agreed upon and analyzed, the development team can start constructing the solution based upon the conceptual and logical designs. This phase can be short and relatively simple, or it can be | + | <p>All solution construction needs go through a plan > do > study (test) > act/(adjust) cycle to ensure continuous improvement and maturity of the solution and the processes associated with it. When this cycle happens continuously, it leads to faster development cycles and better outcomes. [[#Const_One|[1]]] Most agile development methodologies embody this concept in their cores.</p> |
− | + | <p>Throughout the construction phase, the team needs to remember that the goal of the project is to be able to integrate the solution into the users' production environment as seamlessly as possible. And, when we say integration, we mean integration with pre-existing software, hardware, databases, and personnel workflow. Integration into the destination production environment always needs to be in the forefront of the developers' minds. </p> | |
− | All solution construction needs go through a | + | <p>It is also critical for the development team to build to the enterprise's architectural standards (see [http://eitbokwiki.org/Enterprise_Architecture Enterprise Architecture]) and accepted practices. If all goes according to plan, the solution will be handed off to the transition team who will execute the integration of the solution into the existing operations environment. Today, DevOps approaches provide a good model for transitioning.</p> |
− | Throughout the construction phase, the team needs to remember that the goal of the project is to be able to integrate the solution into the | + | |
− | + | ||
− | It is also critical for the development team to build to the | + | |
− | + | ||
<h2>Goals and Guiding Principles</h2> | <h2>Goals and Guiding Principles</h2> | ||
− | + | <p>The construction phase is typically the hardest phase of the solution lifecycle. This is due to several things. First, the construction team must find and resolve all previously unsurfaced issues with the requirements and logical design of the solution. Often these issues arise while coding or hardware configuration is in progress. Second, the construction team must keep their eye firmly on all the critical EIT quality attributes while they are constructing, such as interoperability, security, quality, disaster preparedness, and supportability. Quality attributes are requirements and should be prioritized accordingly, with parameters provided as release requirements for testing.</p> | |
− | The construction phase is typically the hardest phase of the solution lifecycle. This is due to several things. First, the construction team must find and resolve all previously unsurfaced issues with the requirements and logical design of the solution. Often these issues arise while coding or hardware configuration is in progress. Second, the construction team must keep their eye firmly on all the critical EIT quality attributes while they are constructing, such as interoperability, security, quality, disaster preparedness, and supportability. Quality attributes are requirements and should be prioritized accordingly, with parameters provided as release requirements for testing. | + | <p>The goals of the solution construction phase are actually quite daunting:</p> |
− | + | ||
− | The goals of the solution construction phase are actually quite daunting: | + | |
<ul> | <ul> | ||
− | <li>Construct a solution that satisfies all functional and non-functional requirements.</li> | + | <li>Construct a solution that satisfies all functional and non-functional requirements (see [http://eitbokwiki.org/Requirements Requirements]).</li> |
<li>Construct a solution that is accepted by target users and management.</li> | <li>Construct a solution that is accepted by target users and management.</li> | ||
<li>Construct a solution that is sufficiently well tested and bug free.</li> | <li>Construct a solution that is sufficiently well tested and bug free.</li> | ||
− | <li>Construct a solution that EIT | + | <li>Construct a solution that EIT operations can easily support.</li> |
<li>Construct a solution that interoperates with and integrates well into existing computational, operational, and physical environments. </li> | <li>Construct a solution that interoperates with and integrates well into existing computational, operational, and physical environments. </li> | ||
<li>Ensure that new EIT services can be integrated into business operations.</li> | <li>Ensure that new EIT services can be integrated into business operations.</li> | ||
− | <li>Ensure that the solution is well documented for users (including end users and | + | <li>Ensure that the solution is well documented for users (including end users and the operations team).</li> |
− | <li>Leave enough documentation about the | + | <li>Leave enough documentation about the solution's construction to enable successors to fix, modify, and enhance the solution and stay within the intent of the logical and technical design.</li> |
</ul> | </ul> | ||
− | + | <p>There are a several important principles that serve every development team during the construction phase:</p> | |
− | There are a several important principles that serve every development team during the construction phase: | + | |
<ul> | <ul> | ||
− | <li><strong>Design is not coding; coding is not design | + | <li><strong>Design is not coding; coding is not design</strong>—Both are important, but you need to do the design, not just sit down and code. The design process should be thorough enough to avoid the need for re-engineering and recoding. A thorough design pays for itself. This principle is true whether you are using a waterfall, prototyping iterative spiral, rapid, extreme, or agile development methodology. That is why many agile methodologies require upfront architecture design.</li> |
− | + | <li><strong>Minimize complexity</strong>—The KISS principle (keep it simple stupid) was popular in the 1970s, but its idea is still important. Although it applies to many engineering domains, it is extremely applicable to software. Simple designs are easier to build, debug, maintain, and change.</li> | |
− | <li><strong>Minimize complexity | + | <li><strong>Accommodate change</strong>—The only thing that one can count on in life is change. This is also true in developing EIT solutions. It is critical to design the solution to accommodate change, because it will be required.</li> |
− | + | <li><strong>Test early and often</strong>—There have been many studies that have shown that the cost of having and fixing a bug in code increases significantly the longer the bug exists. The cost of fixing bugs increases as the code progresses through each stage: in the hands of the developer, in the hands of the testing and debugging team, in transition, and in operations. Only one thing helps, catching bugs as soon as possible.</li> | |
− | <li><strong>Accommodate change | + | <li><strong>Integrate code early and often</strong>—Software integration needs to be continuous, not something that happens at the very end. Software integration should be managed via configuration control tools to maintain the integrity of the code base as it evolves. </li> |
− | + | <li><strong>Build in quality and security</strong>—Assess the design/solution for meeting requirements for quality attributes, including interoperability, maintainability, and security as it is being created, not after the fact.</li> | |
− | <li><strong>Test early and often | + | |
− | + | ||
− | <li><strong>Integrate code early and often | + | |
− | + | ||
− | <li><strong>Build | + | |
</ul> | </ul> | ||
− | |||
<h2>Context Diagram</h2> | <h2>Context Diagram</h2> | ||
− | + | <p>[[File:12 Construction CD.png|700px]]<br /><strong>Figure 1. Context Diagram for Construction</strong></p> | |
− | [[File:12 Construction CD.png|700px]] | + | |
− | + | ||
− | + | ||
− | + | ||
<h2>Preparation for Construction</h2> | <h2>Preparation for Construction</h2> | ||
− | + | <p>One would think that the requirements analysis and logical design phase (see [http://eitbokwiki.org/Requirements Requirements]) is the preparation required for construction to proceed. It does (or maybe should) provide all the necessary background information; however, the construction team may not be the team that prepared the requirements and logical design artifacts, so it is critical for the construction team to become familiar with the requirements as developed.</p> | |
− | One would think that the | + | <p>The team needs to prepare for construction to:</p> |
− | + | ||
− | The team needs to prepare for construction to: | + | |
<ul> | <ul> | ||
<li>Get the solution right</li> | <li>Get the solution right</li> | ||
− | <li>Understand completely what each team member needs to accomplish </li> | + | <li>Understand completely what each team member needs to accomplish</li> |
<li>Establish important relationships with users and stakeholders up front</li> | <li>Establish important relationships with users and stakeholders up front</li> | ||
<li>Understand each construction team member responsibilities</li></ul> | <li>Understand each construction team member responsibilities</li></ul> | ||
− | + | <p>There are several critical activities that should occur during the preparation phase:</p> | |
− | There are several critical activities that should occur during the preparation phase: | + | |
<ul> | <ul> | ||
− | <li>Collect and review all | + | <li>Collect and review all requirements outputs/artifacts, including use cases</li> |
<li>Understand the relationships among requirements</li> | <li>Understand the relationships among requirements</li> | ||
<li>Meet with stakeholders and users to confirm understanding.</li> | <li>Meet with stakeholders and users to confirm understanding.</li> | ||
<li>Select an appropriate development methodology</li> | <li>Select an appropriate development methodology</li> | ||
</ul> | </ul> | ||
− | |||
<h3>Collect and Review Requirements</h3> | <h3>Collect and Review Requirements</h3> | ||
− | + | <p>The goal of the requirements analysis and logical design activities is to understand and document all the requirements sufficiently for the consumers of the artifacts (developers, testers, user documentation writers, transition team, and operations team) to be able to do their jobs. The requirements must be sufficient to develop a logical design that the construction team can turn into a physical design. The construction team needs to become intimately familiar with all the artifacts that the requirements team has generated. </p> | |
− | The goal of the | + | <p>Because of their fresh eyes and different (implementation) perspective, the construction team will often find ambiguous requirements that need to restated. They might find conflicting requirements that need to be resolved. And, they might also find incomplete or missing requirements (often called "derived requirements") that need to be added to the list. In the best of all worlds, these issues are found during the preparation phase rather than while programmers are coding or users are testing.</p> |
− | + | ||
− | Because of their fresh eyes and different (implementation) perspective, the construction team will often find ambiguous requirements that need to restated. They might find conflicting requirements that need to be resolved. And, they might also find incomplete or missing requirements (often called | + | |
− | + | ||
<h3>Review Use Cases</h3> | <h3>Review Use Cases</h3> | ||
− | If the requirements team did their job well, there should be | + | <p>If the requirements team did their job well, there should be many use cases. These use cases indicate in words or pictures how the system should behave. It is critical for the construction team to review all use cases in detail. The goal is to have the solution behave like the use cases and to identify where it might not be able to.</p> |
− | Use cases are often the best measure of whether the construction team is doing their job right. In addition, use cases might implicate the need for particular hardware or software resources to enable construction of the solution. For example, a use case of a mobile app might indicate the need for a particular feature, such as GPS or fingerprint security that limits the devices to those that have the built-in features. | + | <p>Use cases are often the best measure of whether the construction team is doing their job right. In addition, use cases might implicate the need for particular hardware or software resources to enable construction of the solution. For example, a use case of a mobile app might indicate the need for a particular feature, such as GPS or fingerprint security, that limits the devices to those that have the built-in features.</p> |
− | + | <p>In addition, use cases are often excellent guides for developing test cases for the constructed solution. Note that during the use case review process, the construction team often identifies "holes" in the use cases, that is, situations that were not covered or options that were not explored. The construction team needs to take careful note of the use case issues. They might be required to add use cases and get them verified by the SME or stakeholders; or, the construction or test team might make notes that will result in more test cases.</p> | |
− | In addition, use cases are often excellent guides for developing test cases for the constructed solution. Note that during the use case review process, the construction team often identifies | + | |
− | + | ||
<h3>Meet with Stakeholders and Users</h3> | <h3>Meet with Stakeholders and Users</h3> | ||
− | + | <p>Too often, developers want to hide in the back room while constructing the solution. Then, when they think they are done, they reveal the "finished" solution to the awe and applause of the users. Unfortunately, this is not a good tactic, because it rarely results in the awe and applause that the developers are seeking. Surprise! What do you mean this doesn't work the way the users want it to?</p> | |
− | Too often, developers want to hide in the back room while constructing the solution. Then, when they think they are done, they reveal the | + | <p>Involving the stakeholders and users throughout the construction process is essential. Even though the requirements team did their job and showed them all the designs, there is just something different about seeing the thing work for real, even if it is just a prototype. Users don't get it until the solution is there in front of them.</p> |
− | Involving the stakeholders and users throughout the construction process is essential. Even though the requirements team did their job and showed them all the designs, there is just something different about seeing the thing work for real, even if it is just a prototype. | + | <p>Developing a good relationship with representatives of the user community is critical. Starting the process at the beginning of the construction phase often has the best results. If possible, identify a couple of friendly individuals who are not intimidated by technology and who are excited to try out the solution. Get to know their perspective about what the system needs to do and how it needs to work to help them do their job. Understand how they want to be involved in the process. Determine if they are willing to try out prototypes or be beta testers.</p> |
− | + | <p>Also, find the right people in your user community and stakeholders to figure out how to stage the rollout of the solution. It is true that some solutions can be constructed and rolled out in one wave of the magic wand; however, most solutions are best constructed and tested in stages—each stage resulting in an increment that adds new features. Stakeholders and users often have the best ideas of what should be included in each increment and how many stages make sense. They know what makes a system whole and worth running through an alpha or beta test.</p> | |
− | Developing a good relationship with representatives of the user community is critical. Starting the process at the beginning of the construction phase often has the best results. If possible, identify a couple of friendly individuals who are not intimidated by technology and who are excited to try out the solution. Get to know their perspective about what the system needs to do and how it needs to work to help them do their job. Understand how they want to be involved in the process. Determine if they are willing to try out prototypes or be beta testers. | + | <h3>Select a Development Methodology</h3> |
− | + | <p>A system or system '''[http://eitbokwiki.org/Glossary#developmentmethodology development methodology]''' is the process that is used to structure, plan, and control the process of developing a solution. Most enterprises adopt one development methodology for EIT projects (and in fact, maybe for all corporate projects) and each project is required to use that methodology. However, if a methodology is not prescribed by the EIT department, the project needs to select one. The most common are mentioned in the section on [[What_Makes_Up_a_Life_Cycle?#development_methodologies|Development Methodologies]]. </p> | |
− | Also, find the right people in your user community and stakeholders to figure out how to stage the rollout of the solution. It is true that some solutions can be constructed and rolled out in one wave of the magic wand; however, most solutions are best constructed and tested in | + | |
− | + | ||
− | <h3>Select a Development Methodology</h3> | + | |
− | + | ||
− | A system or system development methodology is the process that is used to structure, plan, and control the process of developing a solution. Most enterprises adopt one development methodology for EIT projects (and in fact, maybe for all corporate projects) and each project is required to use that methodology. However, if a methodology is not prescribed by the EIT department, the project needs to select one. The most common are mentioned in the section on Development Methodologies. < | + | |
− | + | ||
<h2>Developing the Physical Design</h2> | <h2>Developing the Physical Design</h2> | ||
− | + | <p>During the physical design activities, all the conceptual and logical specifications of the system are converted to descriptions of the solution in terms of software, databases, hardware, and networks, as well as the connections between all the parts that will result in the desired behavior. The physical or technical design doesn't only specify the what is being implemented, but also how it will be implemented, including what programming languages and programming standards to use, the infrastructure to build, critical algorithms to implement, the systems support, and so on. </p> | |
− | During the physical design activities all the conceptual and logical specifications of the system are converted to descriptions of the solution in terms | + | <p>There are many rules of thumb that help keep the physical designers on track:</p> |
− | + | ||
− | There are | + | |
<ul> | <ul> | ||
<li>The technical designers should minimize the intellectual distance between the software/hardware and the task as it exists in the real world, keeping the connection between the two as simple as possible. That is, the structure of the software design should (whenever possible) mimic the structure of the problem domain. Selecting the appropriate architecture pattern is crucial.</li> | <li>The technical designers should minimize the intellectual distance between the software/hardware and the task as it exists in the real world, keeping the connection between the two as simple as possible. That is, the structure of the software design should (whenever possible) mimic the structure of the problem domain. Selecting the appropriate architecture pattern is crucial.</li> | ||
− | |||
<li>Good designers consider alternative development approaches, judging each based on the requirements of the problem, the resources available to do the job, and the required performance.</li> | <li>Good designers consider alternative development approaches, judging each based on the requirements of the problem, the resources available to do the job, and the required performance.</li> | ||
− | + | <li>Good designers avoid reinventing the wheel. Systems are constructed using a set of design patterns, many of which have been encountered before. Selecting existing patterns that work well is always a better alternative to reinvention. Reuse typically minimizes development time and the amount of resources used to complete the project. Also, organizations that manifest a ''not invented here (NIH)'' syndrome often miss out on exceptional solutions that save time and money.</li> | |
− | <li>Good designers avoid reinventing the wheel. Systems are constructed using a set of design patterns, many of which have been encountered before. Selecting existing patterns that work well is always a better alternative to reinvention. Reuse typically minimizes development time and the amount of resources used to complete the project. Also, organizations that manifest a | + | |
</ul> | </ul> | ||
− | + | <p>The technical design needs to be carefully reviewed to minimize conceptual (semantic) errors that can occur translating the logical design into a technical one. Sometimes there is a tendency to focus on minutiae when the technical design is reviewed, missing the forest for the trees. A design team should ensure that major conceptual elements of the design (such as omissions, ambiguity, and inconsistency) have been addressed before worrying about the syntax of the design model.</p> | |
− | The technical design needs to be carefully reviewed to minimize conceptual (semantic) errors that can occur translating the logical design into a technical one. Sometimes there is a tendency to focus on minutiae when the technical design is reviewed, missing the forest for the trees. A design team should ensure that major conceptual elements of the design (such as omissions, ambiguity, and inconsistency) have been addressed before worrying about the syntax of the design model. | + | <p>Note that the technical design for the solution needs to be worked on by a solution or enterprise architect associated with the construction team, even if the solution construction is going to be completely or partly outsourced. </p> |
− | + | <!-- | |
− | Note that the technical design for the solution needs to be worked on by solution or enterprise architect associated with the construction team, even if the solution construction is going to be completely or partly outsourced. | + | <p><font color="blue"> <strong>Note: I need to add a solution component picture here. I have been looking on the net for something that would work, but haven't found it yet. I will be working on it next. It will also be used later in the chapter. </strong></font></p> |
− | + | --> | |
− | <font color="blue"> <strong>Note: I need to add a solution component picture here. I have been looking on the net for something that would work, but | + | |
− | + | ||
<h3>Application Design</h3> | <h3>Application Design</h3> | ||
− | + | <p>Developing an application these days can mean number of things, including developing:</p> | |
− | Developing an application these days can mean number of things, including developing: | + | |
<ul> | <ul> | ||
<li>A client-based application, or fat-client</li> | <li>A client-based application, or fat-client</li> | ||
Line 120: | Line 88: | ||
<li>A mobile device application</li> | <li>A mobile device application</li> | ||
</ul> | </ul> | ||
− | + | <p>An application can be interactive and thereby require a user interface, or it can be non-interactive (such as a utility program) and just perform its function in the background. In any case, the application design should include the user interface, important behaviors, algorithmic design, data structure design, access design, and the interactions between the application and other components of the solution.</p> | |
− | An application can be interactive and thereby require a user interface, or it can be non-interactive (such as a utility program) and just perform its function in the background. In any case, the application design should include the user interface, important behaviors, algorithmic design, data structure design, access design, | + | <p>User experience (UX) design has become increasingly important as tablets and other mobile platforms have become ubiquitous. As a result, users' expectations of interface behavior and intuitiveness have risen considerably. The interface is only a part of the UX, though. A host of other features, such as overall usability and suitability, play important parts. </p> |
− | User experience (UX) design has become increasingly important as | + | <p>One of the foremost experts in this area, Don Norman, explains: "The first requirement for an exemplary user experience is to meet the exact needs of the customer, without fuss or bother. Next comes simplicity and elegance that produce products that are a joy to own, a joy to use. True user experience goes far beyond giving customers what they say they want, or providing checklist features. In order to achieve high-quality user experience in a company's offerings, there must be a seamless merging of the services of multiple disciplines, including engineering, marketing, graphical and industrial design, and interface design." (https://www.nngroup.com/articles/definition-user-experience/)</p> |
− | + | ||
− | One of the foremost experts in this area, Don Norman, explains: | + | |
− | + | ||
<h4>Software Framework Selection</h4> | <h4>Software Framework Selection</h4> | ||
− | + | <p>A software framework is a universal, reusable software development environment that provides functionality that facilitates the development of software solutions. Frameworks often include code compilers, code libraries, programming tools, application programming interfaces (APIs), and code configuration tools, among other tools. Why use a framework? Because it leverages the work of many other programmers. Frameworks are often a tremendous source of tested, highly functional algorithms, data structures, and code infrastructure. Solution construction can be faster, more efficient, and more reliable (and obviate a lot of drudge work).</p> | |
− | A software framework is a universal, reusable software development environment that provides functionality that facilitates the development of software solutions. Frameworks often include code compilers, code libraries, programming tools, application programming interfaces (APIs), and code configuration tools among other tools. Why use a framework? Because it leverages the work of many other programmers. Frameworks are often a tremendous source of tested, highly | + | <p>There are many frameworks available. Some are proprietary, some are free/libre and open source software (FLOSS). Usually they are based on a particular programming language (such as Java, C++, C#, PHP, XML, Ruby, and Python) and application environment (client, web, server, or mixed environments). Some of the more popular frameworks include:</p> |
− | + | ||
− | There are many frameworks available. Some are proprietary, some are | + | |
<ul> | <ul> | ||
− | <li> | + | <li>[http://www.gwtproject.org/overview.html Google Web Toolkit] (GWT)—Functionality includes extensive interaction with Ajax, and you can simply write your front end in Java and the GWT compiler converts your Java classes to browser-compliant JavaScript and HTML. Also includes interaction with Google Gears for creating applications available offline.</li> |
− | <li>Spring | + | <li>[http://spring.io Spring Framework]—This framework can run on any J2EE server. It has a multilayered architecture with an extensive API.</li> |
− | <li>Apache Cocoon | + | <li>[http://cocoon.apache.org Apache Cocoon]—Specifically supports component-based development with a strong emphasis on working with XML and then translating to other portable formats.</li> |
− | <li> | + | <li>[http://javaserverfaces.java.net JavaServer Faces] (JSF)—Provides help to build user interfaces for JavaServer applications. It helps developers construct UIs, connect UI components to an application data source, and write client-generated events to server-side event handlers.</li> |
− | <li>Symfony | + | <li>[http://symfony.com Symfony]—This is a set of reusable PHP components that can be used to build robust applications for an enterprise environment. Everything can be customized. Lots of help for testing, debugging, and documenting the solution.</li> |
− | <li>Django | + | <li>[http://www.djangoproject.com Django]—A Python framework that has a template system and dynamic database access API that is used often for content retrieval.</li> |
</ul> | </ul> | ||
− | |||
<h3>Database Design</h3> | <h3>Database Design</h3> | ||
− | + | <p>The database design determines how stored data is organized, stored, and retrieved. Potentially, the database design determines the type of database (e.g., hierarchical, relational, object-oriented, networked) that needs to be constructed and the database technology that will be used (e.g., Oracle, Sybase, SQL Server). The design also specifies the details of who has access to the data and when they have access and whether or not the database needs to be distributed. [[#Const_Three|[3]]]</p> | |
− | The database design determines how stored data | + | <p>There are two situations to consider: </p> |
− | + | ||
− | There are two situations to consider: | + | |
<ul> | <ul> | ||
− | <li>The new solution database stands alone</li> | + | <li>The new solution database stands alone.</li> |
− | <li>The new solution database integrates with already operational databases</li> | + | <li>The new solution database integrates with already operational databases.</li> |
</ul> | </ul> | ||
− | + | <p>The first situation is the least complicated of the two. When the new solution database stands alone, the design team can determine the type, technology, access rules, and behaviors without much consideration of what else happens in operations. But, of course, there will likely be EIT department standards, technologies, and methodologies that need to be followed. </p> | |
− | The first situation is the least complicated of the two. When the new solution database stands alone, the design team can determine the type, technology, access rules, and behaviors without much consideration of what else happens in operations. But, of course, there will likely be EIT | + | <p>When the new solution data needs to be integrated with an already operational database—and, given the ever-growing demand for interoperability, this is almost always the case—the database design and the transition plan usually become much more complicated. The construction team needs to consider:</p> |
− | When the new solution data needs to be integrated with an already operational | + | |
<ul> | <ul> | ||
<li>How much of the data that the new solution needs already exists in the database?</li> | <li>How much of the data that the new solution needs already exists in the database?</li> | ||
− | <li>Is the operational database in the right form and | + | <li>Is the operational database in the right form and does it use the correct data types for the new solution?</li> |
<li>Does the database need to be restructured due to different types of database queries or reports that need to be written?</li> | <li>Does the database need to be restructured due to different types of database queries or reports that need to be written?</li> | ||
<li>Is it necessary to change any technologies to accommodate the functionality or the hosting of the new solution?</li> | <li>Is it necessary to change any technologies to accommodate the functionality or the hosting of the new solution?</li> | ||
</ul> | </ul> | ||
− | + | <p>Planning a database integration can be extremely difficult, and it usually requires planning and writing an '''[http://eitbokwiki.org/Glossary#etl extract, transform, and load (ETL)]''' [[#Const_Four|[4]]] conversion program that will move the data from one structure/technology to another. It might also then require modifications to existing applications that use the existing databases.</p> | |
− | Planning a database integration can be extremely difficult, and it usually requires planning and writing an '''[http://eitbokwiki.org/Glossary#etl | + | <p>Note: It is often the case that the database design fluctuates while the solution code is being written. It is difficult to completely understand how the data needs to be accessed and stored until much of the code is written. Sometimes changes in an algorithm can require a structural change in the database schema or even a technology change. Another consideration is determining where certain operations will be executed, such as via stored procedures in the database or in application code. Depending on one's choice, there can be significant differences in performance, for example.</p> |
− | + | ||
− | Note: It is often the case that the database design fluctuates while the solution code is being written. It is difficult to completely understand how the data needs be accessed and stored until much of the code is written. Sometimes changes in an algorithm can require a structural change in the database schema or even a technology change. Another consideration is determining where certain operations will be executed, such as via stored procedures in the database or in application code. | + | |
− | + | ||
<h3>Server and Storage Design</h3> | <h3>Server and Storage Design</h3> | ||
− | + | <p><strong>Server design</strong> determines what functionality is performed on general servers rather than on clients or mobile devices. There is often a good deal of discussion by the team to determine where particular functions take place. There are many trade offs. Performing functions on the client enhance performance and security. Performing functions on a server allows for access to larger datasets and files, but may lead to latency issues. </p> | |
− | <strong>Server design</strong> determines what functionality | + | <p>In this day, rarely is there a single server anywhere. In most instances, enterprises create or lease server farms to handle the computational load. As the demand for servers increases, so does the complexity of the server farm design. In the end, the server design team needs to determine:</p> |
− | In this day, rarely is there a single server anywhere. In most instances, enterprises create or lease server farms to handle the computational load. As the demand for servers increases, so does the complexity of the server farm design. In the end, the server design team needs to determine: | + | |
<ul> | <ul> | ||
<li>Location: Where should the servers be located? Do they need to be distributed among multiple locations? </li> | <li>Location: Where should the servers be located? Do they need to be distributed among multiple locations? </li> | ||
− | <li>Redundancy: Are the servers so critical that there needs to be significant redundancy, such as multiple server farms? | + | <li>Redundancy: Are the servers so critical that there needs to be significant redundancy, such as multiple server farms? Or would failover and hot-swap capabilities be sufficient?</li> |
− | <li>Computational | + | <li>Computational needs: How much computation needs to be performed on the servers? As a result, what kind of peak computational loads are expected? How does that affect the need for resources? What kind of load-balancing is needed?</li> |
<li>Performance: What kind of response times are required and how does that affect the number of servers needed?</li> | <li>Performance: What kind of response times are required and how does that affect the number of servers needed?</li> | ||
<li>Security: What kind of security do we need for our servers?</li> | <li>Security: What kind of security do we need for our servers?</li> | ||
− | <li>Reuse: Can we use any of our current servers or server farms for this purpose? If how, how | + | <li>Reuse: Can we use any of our current servers or server farms for this purpose? If how, how does this new solution affect their performance?</li> |
</ul> | </ul> | ||
− | <strong>Storage design</strong> consists of determining the technical requirements for how information | + | <p><strong>Storage design</strong> consists of determining the technical requirements for how information is stored and accessed. The things to consider are:</p> |
<ul> | <ul> | ||
<li>Location: Where does the information need to be stored? On the client? On a server? In a public or proprietary cloud?</li> | <li>Location: Where does the information need to be stored? On the client? On a server? In a public or proprietary cloud?</li> | ||
Line 182: | Line 137: | ||
<li>Security: How secure must the data be?</li> | <li>Security: How secure must the data be?</li> | ||
<li>Redundancy: Do we need to provide data storage redundancy? If so, how transparent must the access be?</li> | <li>Redundancy: Do we need to provide data storage redundancy? If so, how transparent must the access be?</li> | ||
− | <li>Backup: What is the data backup plan? How much do we rely on our data redundancy versus other kinds of backup storage? How often do we back up? How long do we keep the data? What about off-site storage? | + | <li>Backup: What is the data backup plan? How much do we rely on our data redundancy versus other kinds of backup storage? How often do we back up? How long do we keep the data? What about off-site storage? Are there any escrow requirements?</li> |
− | <li>Reuse: Can we use any of our current storage systems for this new solution? If | + | <li>Reuse: Can we use any of our current storage systems for this new solution? If so, how will this new solution affect their performance or sizing of the existing systems?</li> |
</ul> | </ul> | ||
− | As with the database design, | + | <p>As with the database design, the true server and storage needs might not be totally clear until the code is nearing completion; however, coming up with a conservative guess to start is required to make progress on the storage and server acquisition and implementation.</p> |
− | + | <h3>Network and Telecommunication Design</h3> | |
− | + | <p>Network design needs to ensure that the network can meet the capacity and speed needs of the users and that it can grow to meet future needs. Many consider the designing process to encompass three major steps: </p> | |
− | <h3>Network | + | |
− | + | ||
− | Network design needs to ensure that the network can meet the capacity and speed needs of the users and that it can grow to meet future needs. Many consider the designing process to encompass three major steps: | + | |
<ul> | <ul> | ||
− | <li>The network topological design describes the components needed for the network along with their placement and how to connect them | + | <li>The network topological design describes the components needed for the network along with their placement and how to connect them. </li> |
<li>Network synthesis determines the size of the components needed to meet the performance requirements, in this case often known as grade of service (GoS). This stage uses the topology, GoS, and cost of transmission to calculate a routing plan and the size of the components.</li> | <li>Network synthesis determines the size of the components needed to meet the performance requirements, in this case often known as grade of service (GoS). This stage uses the topology, GoS, and cost of transmission to calculate a routing plan and the size of the components.</li> | ||
− | <li>The | + | <li>The network realization stage determines how to meet the capacity needs for the solution and how to ensure the reliability of the network. Using all the information related to costs, reliability, and user needs, this planning process calculates the physical circuit plan.</li> |
</ul> | </ul> | ||
− | + | <p>The network and telecommunication plans and design not only contain topological diagrams of equipment and wiring, they also must cover:</p> | |
− | The | + | |
<ul> | <ul> | ||
<li>Information about equipment delivery and customization and/or fabrication</li> | <li>Information about equipment delivery and customization and/or fabrication</li> | ||
− | <li>Plans to test reliability and quality of network gear and services | + | <li>Plans to test reliability and quality of network gear and services</li> |
<li>Plans for IP address management for network VLANs and subnets</li> | <li>Plans for IP address management for network VLANs and subnets</li> | ||
<li>Firewall locations and settings</li> | <li>Firewall locations and settings</li> | ||
Line 207: | Line 158: | ||
<li>Policies and procedures to keep the entire network and subnets working as designed</li> | <li>Policies and procedures to keep the entire network and subnets working as designed</li> | ||
</ul> | </ul> | ||
− | |||
<h3>EIT Infrastructure Support Design and Planning</h3> | <h3>EIT Infrastructure Support Design and Planning</h3> | ||
− | + | <p>EIT infrastructure comprises those systems, software, and services that are used to support the organization. They are not specifically for one project or solution. They are used by most (if not all) projects and solutions. Infrastructure services is a foundation for both the construction of solutions as well as the operation of solutions. It is rare that the EIT organization creates the infrastructure components. Nearly all come from third-party vendors. Still the EIT organization needs to select, integrate, operate, and maintain the components in the context of their operations. For detailed information about how to work with vendors to acquire components, see [http://eitbokwiki.org/Acquisition Acquisition].</p> | |
− | EIT | + | <p>Although there is some disagreement as to the exact list of EIT infrastructure components, the following types of components are typical:</p> |
− | + | ||
− | Although there is some disagreement as to the exact list of EIT infrastructure components, the following types of components are typical: | + | |
<ul> | <ul> | ||
− | <li>Application development tools and services | + | <li>'''Application development tools and services'''—There are many items that belong in this list from software development platforms, platform middleware, integration-enabling software, testing harnesses, and configuration management tools. All these tools help independently designed and constructed applications to work together. They also increase the productivity of the engineering staff.</li> |
− | <li>Information management software tools and services | + | <li>'''Information management software tools and services'''—The components in this area include data integration tools, data quality tools, and database management systems. </li> |
− | <li>Storage management software and services | + | <li>'''Storage management software and services'''—This group includes all software products that help manage and protect devices and data. These tools manage the capacity, performance, and availability of data stored on all devices including disks, tapes, optical devices, and the networking devices that handle data.</li> |
− | <li> | + | <li>'''EIT operations management tools and services'''—This includes all the tools required to manage the provisioning, capacity, performance, and availability of the computing, networking, and application environment.</li> |
− | <li>Security management tools and services | + | <li>'''Security management tools and services'''—These tools and services test, control, and monitor access to internal and external EIT resources.</li> |
− | <li>Operating systems and other software services | + | <li>'''Operating systems and other software services'''—The base-level operating systems that run on all devices need to be selected and maintained. OSs manage a computer's resources, control the flow of information to and from a main processor, manage memory, control display and peripheral devices, perform networking and file management, and manage resource allocation between software and system components. Beyond operating systems, other infrastructure software such as clustering and remote control software, directory servers, OS tools, Java servers, mainframe infrastructure, and mobile and wireless infrastructures are usually required.</li> |
</ul> | </ul> | ||
− | |||
<h3>Desired Technical Design Qualities</h3> | <h3>Desired Technical Design Qualities</h3> | ||
− | + | <p>When creating a technical design, the team should do their best to build in a number of qualities in all the components. Several of these qualities are unique to the construction phase, such as modularity; however, other qualities are important in all phases of the application lifecycle, from requirements development to operations, such as reliability, security, and traceability.</p> | |
− | When creating a technical design, the team should do their best to build in the | + | |
<ul> | <ul> | ||
− | <li>Compatibility | + | <li>'''Compatibility'''—The software and hardware is able to operate with other solutions that are designed to interoperate. For example, a piece of software should be backward-compatible with an older version of itself.</li> |
− | <li>Extensibility | + | <li>'''Extensibility'''—New capabilities can be added to the software without major changes to the underlying architecture.</li> |
− | <li>Fault-tolerance | + | <li>'''Fault-tolerance'''—The software is resistant to and able to recover from component failure. The design should be structured to degrade gently, even when aberrant data, events, or operating conditions are encountered. Well-designed software should never "bomb." It should accommodate unusual circumstances, and if it must terminate processing, do so in a graceful manner.</li> |
− | <li> | + | <li>'''Consistency'''—The design should be consistent. A consistent design appears as if one person developed the entire thing; the components need to be totally compatible. </li> |
− | <li>Maintainability | + | <li>'''Integrability'''—An integrable design uses a uniform set of coding styles and conventions. In addition, great care is taken to define the interfaces between design components so that integration does not introduce hundreds of bugs that are hard to track down.</li> |
− | <li>Modularity | + | <li>'''Maintainability'''—A measure of how easily bug fixes or functional modifications can be accomplished. High maintainability can be the product of modularity and extensibility.</li> |
− | <li>Reliability | + | <li>'''Modularity'''—The resulting software comprises well-defined, independent components that leads to better maintainability. The components could be then implemented and tested in isolation before being integrated to form a desired software system. This allows division of work in a software development project.</li> |
− | <li>Reusability | + | <li>'''Performant'''—The software performs its tasks within a user-acceptable time. The solution only consumes a reasonable amount of resources, whether they be power, memory, disk space, network bandwidth, or other.</li> |
− | <li>Robustness | + | <li>'''Portability'''—The solution can be moved to different environments, if necessary.</li> |
− | <li>Security | + | <li>'''Reliability'''—The software is able to perform a required function under stated conditions for a specified period of time.</li> |
− | <li>Scalability —The solution can be easily expanded, as needed. Documentation about how to add resources to the must be available. Hardware and virtualization designs can make this quality available; however, there needs to be a well-trained individual assigned to know when and how to scale the solution.</li> | + | <li>'''Reusability'''—The software components (units of code) are clean enough in design and function to be included in the software reuse library.</li> |
− | <li> | + | <li>'''Robustness'''—The software is able to operate under stress or tolerate unpredictable or invalid input. For example, it can be designed with a resilience to low memory conditions.</li> |
− | + | <li>'''Security'''—The software is able to withstand hostile acts and influences. All corporate and personal data is secure.</li> | |
− | + | <li>'''Scalability'''—The solution can be easily expanded, as needed. Documentation about how to add resources to the solution must be available. Hardware and virtualization designs can make this quality available; however, there needs to be a well-trained individual assigned to know when and how to scale the solution.</li> | |
− | + | <li>'''Traceability'''—Because a single element of the design model often traces to multiple requirements, it is necessary to have a means for tracking how requirements have been satisfied by the design model.</li> | |
− | + | <li>'''Uniformity'''—A system design that resembles a Frankenstein monster is often hard to code, debug, integrate, and maintain. A uniform design helps with these factors.</li> | |
− | <li>Uniformity | + | <li>'''Usability'''—The software user interface must be usable for its target users. Default values for the parameters must be chosen so that they are a good choice for the majority of the users. [[#Const_Five|[5]]]</li> |
− | <li>Well- | + | <li>'''Well-documented'''—The ''Developer Insights Report'', published by Application Developers Alliance, points out that the one of the top reasons that development projects fail is because of changing and poorly documented requirements. This also includes the technical design phase.</li> |
</ul> | </ul> | ||
− | |||
<h2>Planning and Managing the Development</h2> | <h2>Planning and Managing the Development</h2> | ||
− | + | <p>In EIT organizations, planning is a process that continues throughout the lifecycle of a solution. The most critical planning often occurs during the construction phase. It is also often the most difficult plan to create. The team creates the plan to include the physical/technical design activities, but the planning process continues as the team puts together detailed plans and estimates for the actual construction elements in the schedule, whether they be chunks of calendar time, sprints, feature deliveries, or the like. These plans must include time for developing and executing tests (including allowing the developers sufficient time to test their code), continuous integration, and bug fixing.</p> | |
− | In EIT organizations, | + | <p>Why is it so difficult? Because there are usually sections of the construction that have never been tackled before, and the task durations and personnel needs are just good guesses. For example, algorithms that were designed in the technical design tasks might not pan out when they are constructed and tested, and thereby require additional time to refine and recode. Since not all developers have equal capabilities, log jams may develop along the critical path. People may not be sufficiently skillful at using the selected toolset. People might even get sick and have to take time off!</p> |
− | + | ||
− | Why is it so difficult? Because there are usually sections of the construction that have never been tackled before, and the task durations and personnel needs are just good guesses. For example, algorithms that were designed in the technical design tasks might not pan out when they are constructed and tested, and thereby require additional time to refine and recode. Since not all developers have equal capabilities, log jams may develop along the critical path. People may not be sufficiently skillful at using the selected toolset. People might even get sick and have to take time off! | + | |
− | + | ||
<h3>Construction Plan Contents</h3> | <h3>Construction Plan Contents</h3> | ||
− | + | <p>What the construction plan will look like and how it is constructed depends a great deal on the development methodology used by the construction team. If the team uses a waterfall methodology, they perform a huge amount of the planning up front and fill out and refine the plans for the detailed implementation tasks when the technical design is complete. If the team is using a rapid prototyping approach, the team constructs a high-level plan up front for the entire project that will be divided into phases. Right before each phase, the team creates a detailed plan for the upcoming phase. (Refer to the [https://www.pmi.org/pmbok-guide-standards Project Management Body of Knowledge (PMBOK)] [[#Const_Two|[2]]] for detailed information about project planning.)</p> | |
− | What the construction plan will | + | <p>Recommended practices for creating useful and durable construction plans include:</p> |
− | + | ||
− | + | ||
<ul> | <ul> | ||
− | <li>Create a detailed plan with reasonable estimates for all resources (human, facilities, HW, | + | <li>Create a detailed plan with reasonable estimates for all resources (human, facilities, HW, and SW), costs, and schedule.</li> |
<li>Create tasks/subtasks that are relatively short in duration and well understood.</li> | <li>Create tasks/subtasks that are relatively short in duration and well understood.</li> | ||
<li>Understand and document the interdependencies between tasks and subtasks.</li> | <li>Understand and document the interdependencies between tasks and subtasks.</li> | ||
Line 265: | Line 205: | ||
<li>Make time for building in the attributes that you need to have in your solution, such as levels of quality, security, and integrability.</li> | <li>Make time for building in the attributes that you need to have in your solution, such as levels of quality, security, and integrability.</li> | ||
</ul> | </ul> | ||
− | |||
<h3>Regulatory and Policy Considerations</h3> | <h3>Regulatory and Policy Considerations</h3> | ||
− | + | <p>Twenty years ago, EIT departments could set their own standards and policies for their code; however, in today's world there are numerous governmental and industry regulations that need to be met, such as datacenter standards, safety standards, audit and financial control regulations, as well as security and data privacy regulations. And remember, this is in addition to whatever policies the enterprise has. Now even though these constraints should be highlighted in the requirements used by the construction team, the team must understand all of these policies and regulations, and make sure that the plan accounts for meeting all regulatory and policy requirements.</p> | |
− | Twenty years ago, EIT departments could set their own standards and policies for their code; however, in | + | <p>Some of the most pervasive regulations and policies are common to the areas below:</p> |
− | + | ||
− | Some of the most pervasive regulations and policies are common to the areas below: | + | |
<ul> | <ul> | ||
− | <li> | + | <li>Datacenter standards—There are a number of regulations and standards associated with the area of building and datacenter codes. From floor to ceiling tiles, air flow to electrical requirements, this area is vast and requires engineering staff who know the area well. This includes ISO/IEC 24764:2010(E) [[#Const_Six|[6]]] and Statement on Auditing Standards No. 70 (SAS 70) [[#Const_Seven|[7]]].</li> |
− | <li>Safety | + | <li>Safety standards—Safety is critically important. Many of the construction phases recommended practices and safety codes (e.g., ANSI/ISA 71.04-2013) are rooted in past incidents, and they usually require knowledgeable staff or contractors to sure that they are begin followed.</li> |
− | <li>Audit and | + | <li>Audit and financial controls—Financial and personnel reporting regulations (e.g., Sarbanes-Oxley Act, SOX compliance) belong to an area that has come under significant scrutiny since 2000. If the solution deals in these areas, individuals with this expertise need to be part of the team.</li> |
− | <li>Security and | + | <li>Security and data privacy—Regulations associated with security and data privacy are growing at a significant rate. The team needs to understand local, state, national, and international laws these days. See the [[http://eitbokwiki.org/Security Security chapter]] for more details. </li> |
</ul> | </ul> | ||
− | |||
<h3>Most Common Construction Planning Mistakes</h3> | <h3>Most Common Construction Planning Mistakes</h3> | ||
− | + | <p>Unfortunately, construction plans often don't resemble what actually occurs during the project. Some of the differences between "planned" and "actual" are expected; however, often teams don't do a very good job of planning. The most common development planning mistakes are:</p> | |
− | Unfortunately, | + | |
− | + | ||
<ul> | <ul> | ||
<li>Not anticipating or managing changes to scope.</li> | <li>Not anticipating or managing changes to scope.</li> | ||
− | |||
<li>Not planning time for quality, security, or other non-functional requirements.</li> | <li>Not planning time for quality, security, or other non-functional requirements.</li> | ||
− | |||
<li>Not leaving time for testing and fixing bugs.</li> | <li>Not leaving time for testing and fixing bugs.</li> | ||
− | |||
<li>Not planning in holidays, vacations, and illness. </li> | <li>Not planning in holidays, vacations, and illness. </li> | ||
− | + | <li>Not planning in non-delivery or slow delivery by vendors.</li> | |
− | <li>Not planning in non-delivery or slow | + | |
</ul> | </ul> | ||
− | |||
<h3>Critical Project Management Activities</h3> | <h3>Critical Project Management Activities</h3> | ||
− | + | <p>Many EIT groups do not carefully track the progress of their projects. It is a huge mistake that can end up causing a project to balloon into 200 percent or more times its original length or cost. For the most part, construction phase project management is just like project management for any other project. However, there are a few aspects that are unique, and critical to execute well to keep the project under control. </p> | |
− | Many EIT groups do not carefully track the progress of their projects. It is a huge mistake that can end up causing a project to balloon into 200 | + | |
− | + | ||
<h4>Taking Measurements During Construction</h4> | <h4>Taking Measurements During Construction</h4> | ||
− | + | <p>When you are building a kitchen, it is fairly easy to understand how much of the project you have completed and how much you have left to do. Understanding the project is visual and relatively easy. This is not the case with most EIT projects, especially when the software components are being created. And, as mentioned above, a project can get out of control very quickly. As a result, it is critical to constantly take measurements that can provide information about how much progress is being made, or how much trouble the project is in. There are two types of measurements that can be taken, direct and indirect.</p> | |
− | When you are building a kitchen, it is fairly easy to understand how much of the project you have completed and how much you have left to do. Understanding the project is visual and relatively easy. This is not the case with most EIT projects, especially when the software components are being created. And, as mentioned above, a project can get out of control very quickly. As a result, it is critical to constantly take measurements that can provide information about how much progress is being made, or how much trouble the project is in. There are two types of measurements that can be taken, direct | + | <p>''Direct measurements'' are those that can be measured or counted exactly and directly. They include things such as costs of components, amount of effort/resources consumed, lines of code written, the number of tasks or features completed, the speed of the solution's response, the number of tests being performed on the solution, and the number of outstanding bugs.</p> |
− | + | <p>''Indirect measurements'' are much harder to quantify, such as the quality, complexity, stability, or maintainability of the product; however, one can often use direct measurements to get some idea of the indirect measurements.</p> | |
− | Direct measurements are those that can be measured or counted exactly and directly. They include things such as costs of components, amount of effort/resources consumed, lines of code written, the number of tasks or features completed, the speed of the | + | <p>In general, project managers need to focus on direct measurements. They need to take them frequently and they can hopefully use them to understand how well the project is progressing or when it is in trouble. Identifying the need for course corrections early always saves time and money.</p> |
− | Indirect measurements | + | |
− | + | ||
− | In general, project managers need to focus on direct measurements. They need to take them frequently and they can hopefully use them to understand how well the project is progressing or when it is in trouble. Identifying the need for course corrections early always saves time and money. | + | |
− | + | ||
<h4>Managing Other Parties</h4> | <h4>Managing Other Parties</h4> | ||
− | + | <p>Usually, in EIT projects, it is as important to manage non-team parties such as stakeholders, procurement groups, and vendors, as it is to manage the construction team. These "outside" individuals or groups can totally derail a project. Managing them usually requires excellent communication skills, patience, diplomacy, and a strong managing hand. Managing third parties is an activity that needs to be continuous from the beginning to the end of the project.</p> | |
− | Usually, in EIT projects, it is as important to manage non-team parties such as stakeholders, procurement groups, and vendors, as it is to manage the construction team. These | + | |
− | + | ||
<h4>Change Request Management</h4> | <h4>Change Request Management</h4> | ||
− | + | <p>Whether your project is building a kitchen or building a CRM solution, requests for changes are going to be made to the requirements and design of the solution during the construction phase. Some issues and interdependencies can't be identified until the team is down in the bits coding basic functionality. You also can't see some problems with the interface design or flow of the application until the beta testers are let loose on the system.</p> | |
− | Whether your project is building a kitchen or building a CRM solution, requests for changes are going to be made to the requirements and design of the solution during the construction phase. Some issues and interdependencies | + | <p>So, change is going to happen. The management skill that is required for all projects is to first be able to understand whether a change is critical or non-critical, and then to be able to convince proposers that non-critical changes must wait for a future development phase. There are many techniques for keeping the user community under control, but the most useful is to show them how much the change is going to cost and how long it will slow down the delivery of the system.</p> |
− | + | <p>In any case, having a robust change request management system is critical and it should do the following:</p> | |
− | So, change is going to happen. | + | |
− | + | ||
− | In any case, having a robust change request management system is critical and it should | + | |
<ul> | <ul> | ||
<li>Define a change request carefully and completely</li> | <li>Define a change request carefully and completely</li> | ||
Line 325: | Line 243: | ||
<li>Get approval for making the change to the plan from management (usually a CAB)</li> | <li>Get approval for making the change to the plan from management (usually a CAB)</li> | ||
</ul> | </ul> | ||
− | |||
<h2>Developing the Application</h2> | <h2>Developing the Application</h2> | ||
− | + | <p>Although application development is a relative mature area of EIT, the languages, and tools are constantly in flux. Typically, each EIT department standardizes on their particular set of programming languages, development tools, programming standards, and development methodologies. Rarely is a development team allowed to bring in new construction technology without justification.</p> | |
− | Although application development is a relative mature area of EIT, the languages, and tools are constantly in flux. Typically, each EIT department | + | <p>Lots of information on software development can be found in the IEEE-CS SWEBOK Chapter 3 Software Construction [[#Const_Eight|[8]]]. It is important to know that there are many options for constructing a solution from purchasing packaged solution components that can be used right out of the box (often termed a commercial off-the-shelf [COTS] solution), to purchasing solution components that need to be customized, to a component that is built completely in house.</p> |
− | + | ||
− | Lots of information on software development can be found in the IEEE-CS SWEBOK Chapter 3 Software Construction [ | + | |
− | + | ||
<h3>Solution Development Options</h3> | <h3>Solution Development Options</h3> | ||
− | + | <p>There are many options for developing an application with respect to how many components the EIT department implements or customizes versus how much of the solution is purchased from a vendor.</p> | |
− | There are | + | |
<ul> | <ul> | ||
− | <li> | + | <li>'''"Roll your own" solution'''—No matter what solution component you are talking about, when the enterprise takes on the development of the solution, it is taking on a good deal of responsibility for creating and maintaining the solution. It also takes on the responsibility for mastering and keeping up with all the technology and skills involved with developing the solution. In some instances, this commitment makes sense. In others, it does not. Each component of each solution needs to be reviewed with respect to the best method for constructing the component.</li> |
− | + | <li>'''Hiring third-party developers'''—Sometimes the expertise or amount of resources necessary are not available in house. In this case, people hire outside developers to create all or part of the solution. In many situations, this option is the hardest. The enterprise ends up shouldering the cost of creating and maintaining the solution throughout its lifecycle, often through the vendor that originally developed the solution component. In addition, managing outside resources to create the correct things is almost always harder than managing your in-house staff. But sometimes, you don't have another option.</li> | |
− | <li>Hiring third-party developers | + | <li>'''Customized packaged software'''—Many vendors provide software or hardware components that have most of the functionality that an enterprise needs, but they allow for customizations that accommodate critical business processes or policies. Customizations can be performed by the vendor, and vendors often provide tools (such as APIs) to enable settings to be changed, or customized modules to be developed and added to work with the rest of the software package. Again, this lowers the development and maintenance costs greatly over creating your own solution components.</li> |
− | + | <li>'''Off-the-shelf solution components'''—The cheapest way to provide a solution is to purchase off-the-shelf software and hardware components, whenever they are available. Not only is the purchase price generally much cheaper than any other option, typically, so is the maintenance. The vendor can amortize its efforts to maintain the code over many customers; the EIT department can't.</li> | |
− | <li>Customized packaged software | + | <li>'''Cloud-based solution components'''—When we think of service provided in the "cloud," we most often think of software or storage services. The fact it, there are a whole stack of services now being provided in the cloud: |
− | + | ||
− | <li>Off-the-shelf solution components | + | |
− | + | ||
− | <li>Cloud-based solution components | + | |
<ul> | <ul> | ||
− | <li>Infrastructure as a Service (IaaS) | + | <li>[[Glossary#iaas|Infrastructure as a Service (IaaS)]]—This is the most basic cloud-service model that provides machines, servers, storage, network services, and even load balancing. IaaS can be provided as either standard Internet access or as virtual private networks.</li> |
− | <li>Platform as a Service (PaaS) | + | <li>[[Glossary#paas|Platform as a Service (PaaS)]]—This cloud layer provides platforms whether they be execution runtimes, databases, web servers, or development tools. The customer typically does not manage any of the infrastructure for this layer, but it does have some control over which platforms are available and other settings. </li> |
− | <li>Software as a Service (SaaS) is a method of purchasing applications that are running on a cloud infrastructure. These solutions are generally stand-alone services that meet a specific business need. </li><li>Integration between in-house and cloud services is often complex, | + | <li>[[Glossary#saas|Software as a Service (SaaS)]] is a method of purchasing applications that are running on a cloud infrastructure. These solutions are generally stand-alone services that meet a specific business need. </li> |
+ | <li>Integration between in-house and cloud services is often complex, unstable, and requires special security measures. As with the other services, SaaS can be provided through either standard Internet service or as a virtual private network.</li> | ||
</ul></li></ul> | </ul></li></ul> | ||
− | + | <p>[[File:Cont_development_options.png]]<br /><strong>Figure 2. Solution Development Options</strong></p> | |
− | < | + | <p>It is important to note that despite the fact that a vendor is providing a service, due diligence is still required to ensure that contracts between the two parties specify exactly what the enterprise requires from the cloud provider in terms of service, performance, security, and other measures. The enterprise must understand that using cloud applications does not transfer responsibility for data and security to the cloud vendor; EIT management is still responsible for ensuring that things such as privacy and regulation controls are being met by the cloud service.</p> |
− | + | ||
− | < | + | |
− | + | ||
<h3>Hardware and Software Infrastructure</h3> | <h3>Hardware and Software Infrastructure</h3> | ||
− | + | <p>Writing the software for an application is only a small part of what needs to get constructed with an EIT solution. Remember that the solution will likely require hardware infrastructure and software infrastructure (middleware) components:</p> | |
− | Writing the software for an application is only a small part of what needs to get constructed with an EIT solution. Remember that the solution will likely require hardware infrastructure and software infrastructure (middleware) components: | + | |
<table> | <table> | ||
− | <tr> | + | <tr valign="top"> |
− | < | + | <td>'''Hardware Infrastructure'''</td> <td>'''Software Infrastructure'''</td></tr> |
<tr valign="top"><td> | <tr valign="top"><td> | ||
<ul> | <ul> | ||
Line 377: | Line 283: | ||
<li>Software development platform</li> | <li>Software development platform</li> | ||
<li>Database platform</li> | <li>Database platform</li> | ||
− | <li>Supporting application ( | + | <li>Supporting application (email, etc.)</li> |
<li>Configuration management platform</li> | <li>Configuration management platform</li> | ||
<li>Build/manufacturing platform</li> | <li>Build/manufacturing platform</li> | ||
<li>Documentation control </li> | <li>Documentation control </li> | ||
− | <li>Testing | + | <li>Testing harness</li> |
</ul> | </ul> | ||
</td></tr> | </td></tr> | ||
</table> | </table> | ||
− | |||
− | |||
− | |||
<h3>Software Construction </h3> | <h3>Software Construction </h3> | ||
− | + | <p>Numerous approaches have been created to manage the development of software, some of which emphasize the construction phase more than others. These are often referred to as ''software development lifecycle models'', or, more properly perhaps, ''software development methodologies''.</p> | |
− | Numerous approaches have been created to manage the development of software, some of which emphasize the construction phase more than others. These are often referred to as software development lifecycle models, or, more properly perhaps, software development methodologies. | + | <p>Schedule (or predictive) models are more linear from the construction point of view, such as the waterfall and staged-delivery lifecycle models. These models treat construction as an activity that occurs only after significant prerequisite effort has been completed—including detailed requirements work, extensive design work, and detailed planning. Each defined milestone is a checkpoint for signing off on the work completed so far, and authorizing it to go ahead. It often results in "big bang" effects, as all features must go in lock step. That's different from staged delivery of capabilities, which is often a result of incremental approaches. This approach has generally been preferred by companies providing outsourced systems integration work.</p> |
− | + | <p>Other models, usually termed ''iterative'', are less demanding of big upfront scheduling precision, working to refine schedules as each iteration completes. They are comprised of sequences of relatively short periods of development, each such cycle using (iterating) the same sequence of steps to refine a selected set of requirements, code, build, and test the results. Some iterations may deliver working increments of the total solution; others may focus on solving specific problems, like getting the architecture right up front. Some examples are evolutionary prototyping, dynamic systems development method (DSDM), feature driven development (FDD), test driven development (TDD), and scrum. These models tend to develop by feature, so individual features may be at different stages, some already being coded or tested, while others are still being designed. </p> | |
− | Schedule (or predictive) models are more linear from the construction point of view, such as the waterfall and staged-delivery | + | <p>For more information, see Section <click here>>.</p> |
− | + | ||
− | Other models, usually termed iterative, are less demanding of big upfront scheduling precision, working to refine schedules as each iteration completes. They are comprised of sequences of relatively short periods of development, each such cycle using (iterating) the same sequence of steps to refine a selected set of requirements, code, build, and test the results. | + | |
− | + | ||
− | For more information, see Section <click here>>. | + | |
− | + | ||
<h4>Developing and Using Best Coding Practices</h4> | <h4>Developing and Using Best Coding Practices</h4> | ||
− | + | <p>Coding practices are informal rules that EIT organizations adopt that help increase the quality of the software components. These accepted practices are designed to increase the "abilities" of the code, especially reliability, efficiency, usability, and maintainability.</p> | |
− | Coding practices are informal rules that EIT organizations adopt that help increase the quality of the software components. These | + | <p>Recommended coding practices usually include:</p> |
− | + | ||
− | + | ||
<ul> | <ul> | ||
<li>Coding conventions</li> | <li>Coding conventions</li> | ||
Line 411: | Line 307: | ||
<li>Modularity practices</li> | <li>Modularity practices</li> | ||
</ul> | </ul> | ||
− | + | <h4>Performance Tuning and Code Optimization</h4> | |
− | <h4>Performance Tuning | + | <p>In some situations, going back and "tuning" the code to increase its performance or decrease its storage usage is critical. Although, it isn't always necessary, the team should include some time for code tuning in their schedule and then take the time to do it. If there is some anticipation that performance is a critical characteristic for the solution, then the team should anticipate that they will need to spend lot of time tuning.</p> |
− | + | <p>It is important that one does not confuse high-performance code with short or pretty code. The saying that ''fewer lines are faster'' isn't always right. In addition, how to go about optimizing code is different in nearly every programming language, because knowing how the compiler translates the code into machine code is an important piece of knowing how to tune. Optimization is an art form. The best optimizers have many years of experience and they know their compilers inside and out.</p> | |
− | In some situations, going back and | + | |
− | + | ||
− | It is important that one does not confuse high-performance code with short or pretty code. The saying that fewer lines are faster | + | |
− | + | ||
<h3>System and Code Integration</h3> | <h3>System and Code Integration</h3> | ||
− | + | <p>Often the rubber hits the road when the integration process starts. Most of us think of integration as putting software modules together, or setting up a datacenter. The problem is that integration includes both of those activities and several more. The more complex the EIT solution, the more important it is to use a configuration management system. In addition, if the new solution needs to be integrated with a pre-existing system, the complexity increases even more unless interfaces are clearly defined and maintained as "contracts" between systems. </p> | |
− | Often the rubber hits the road when the integration process starts. Most of us think of integration as putting software modules together, or setting up a | + | <p>The configuration management process consists of four basic steps: building, packaging, testing, and deployment. There are numerous tools available to help with each step in the process. For example, common tools used to build solutions are make and Ant. Packing tools provide help with installing, upgrading, configuring, and uninstalling software. Testing tools help run automated tests on the builds (see [[#testing|Testing, Verifying, and Validating the Solution]] for more information). Deployment tools automate and regulate the deployment of software. This includes the release, install, activation, version tracking, and uninstalling processes. </p> |
− | + | <p>[[File:SCM process tools.png]]<br /><strong>Figure 3. Software Configuration Management Process and Tools</strong></p> | |
− | < | + | <p>Many configuration management experts believe that the configuration management process needs to be continuous, not something that happens a couple times during the construction process and then at the end. A developer should know nearly instantaneously whether recent changes will cause issues with the rest of the solution. These fast builds are often referred to as "pre-flight" builds, because they are performed before the code is checked in. An excellent paper by Martin Fowler titled ''[http://martinfowler.com/articles/continuousIntegration.html Continuous Integration]'' suggests that:</p> |
− | + | <div style="margin-left: 5em;"><em>"Continuous Integration is a software development practice where members of a team integrate their work frequently; usually each person integrates at least daily—leading to multiple integrations per day. Each integration is verified by an automated build (including test) to detect integration errors as quickly as possible."''</em></div> | |
− | Integration needs to be carefully planned and even more carefully executed. Communications at every interface need to be anticipated and designed, and the design must be followed during construction. All the following integration points need to be considered: | + | <p>Integration needs to be carefully planned and even more carefully executed. Communications at every interface need to be anticipated and designed, and the design must be followed during construction. All the following integration points need to be considered:</p> |
− | + | ||
<ul> | <ul> | ||
<li>Between modules within a code base</li> | <li>Between modules within a code base</li> | ||
− | <li>Third-party software modules or applications with enterprise-developed or existing software | + | <li>Third-party software modules or applications with enterprise-developed or existing software</li> |
− | <li>Software interactions with existing clients, servers, databases</li> | + | <li>Software interactions with existing clients, servers, and databases</li> |
<li>Software and hardware interactions with existing networks</li> | <li>Software and hardware interactions with existing networks</li> | ||
<li>New solution components with existing security measures</li> | <li>New solution components with existing security measures</li> | ||
</ul> | </ul> | ||
− | + | <p>EIT systems are often very complex and have many integration and data transfer points. Integrating new services into existing environments requires a good deal of knowledge of different technologies, processes, and policies and their interactions.</p> | |
− | + | ||
− | + | ||
<h3>Documenting The Solution</h3> | <h3>Documenting The Solution</h3> | ||
− | + | <p>Most developers hate to document their work, preferring getting the job done to writing about it; however, solution documentation is critical. Each layer of the solution needs to be documented, and the documentation required depends on what layer you need to document.</p> | |
− | Most developers hate to document their work, preferring getting the job done to writing about it; however, solution documentation is critical. Each layer of the solution needs to be documented, and the documentation required depends on what layer you need to document. | + | |
− | + | ||
<ul> | <ul> | ||
− | <li>For the hardware layer, | + | <li>For the hardware layer, documents should discuss the specs of the hardware, how they are organized, special settings, special customizations, and required maintenance.</li> |
<li>Documentation for the software infrastructure layer needs to describe each component and how it is being used. Any policies and procedures around using the infrastructure need to be described. Any customizations or usage assumptions need to be described.</li> | <li>Documentation for the software infrastructure layer needs to describe each component and how it is being used. Any policies and procedures around using the infrastructure need to be described. Any customizations or usage assumptions need to be described.</li> | ||
− | <li>Database documentation needs to describe the database as a whole, but even more important is that it must be like a dictionary. It needs to describe every field, what it is used for, what its format | + | <li>Database documentation needs to describe the database as a whole, but even more important is that it must be like a dictionary. It needs to describe every field, what it is used for, what its format is, and which applications of components use or set the data.</li> |
− | <li>Software documentation is critical for maintenance of the code, both finding/fixing bugs and extending the code in the future. According to The Developer Insights Report (http://www.appdevelopersalliance.org/dev-insights-report-2015-media) published by Application Developers Alliance, one of the top ten | + | <li>Software documentation is critical for maintenance of the code, both finding/fixing bugs and extending the code in the future. According to ''The Developer Insights Report'' (http://www.appdevelopersalliance.org/dev-insights-report-2015-media) published by Application Developers Alliance, one of the top ten developer frustrations is maintaining poorly documented code as it takes significantly more time than maintaining well-documented code. |
− | <p>But what is well-documented code? It should describe what the code does, but more importantly, it needs to describe why it does what it does. Good documentation enhances the readability and transparency. It should be written for people who | + | <p>But what is well-documented code? It should describe what the code does, but more importantly, it needs to describe why it does what it does. Good documentation enhances the readability and transparency. It should be written for people who don't know the code already and who don't have time to read all the code to figure out what this piece does and why it's done here.</p> |
− | <p>Beyond the inline code comments, other documents about the code base as a whole should be written. | + | <p>Beyond the inline code comments, other documents about the code base as a whole should be written. Often, explanatory blocks are written at the head of each section of code. Documentation should explain:</p> |
<ul> | <ul> | ||
<li>Data structures</li> | <li>Data structures</li> | ||
Line 452: | Line 339: | ||
<li>Communication conventions between modules</li> | <li>Communication conventions between modules</li> | ||
<li>Critical assumptions made in the coding process</li></li></ul></ul> | <li>Critical assumptions made in the coding process</li></li></ul></ul> | ||
− | + | <p>Most experienced developers believe that the time they spend writing documentation saves them or someone else even more time in the future, and if the code is being altered, understanding the code prevents people from butchering the original code. It really is worth it.</p> | |
− | Most experienced developers believe that the time | + | <div id="testing"></div><h2>Testing, Verifying, and Validating the Solution</h2> |
− | + | <p>The construction team includes those who test the solution. Together, developers and testers construct the mechanisms and processes for testing the solution, as well as the test cases, verifying that the solution meets all requirements, and validating that the solution does indeed match the needs of the users. Depending on the solution, these mechanisms and processes can be quite simple, or they can be extensive and complicated.</p> | |
− | <h2>Testing, Verifying, and Validating the Solution</h2> | + | |
− | + | ||
− | The | + | |
− | + | ||
<h3>Build Testing Suites</h3> | <h3>Build Testing Suites</h3> | ||
− | + | <p>Testing must be done on all software and hardware constructed or used for the solution. Creating automatic and manual test suites can involve many techniques. Here are a few of the most common.</p> | |
− | Testing must be done on all software and hardware constructed or used for the solution. Creating automatic and manual test suites can involve | + | |
− | + | ||
<h4>Solution Regression Testing</h4> | <h4>Solution Regression Testing</h4> | ||
− | + | <p>Regression testing consists of using an established set of tests to ensure that the solution behaves as designed throughout any changes. Obtaining the same results, without introducing errors, verifies that the solution continues to perform correctly and consistently despite ongoing changes to the code base, database, and hardware throughout the construction process. Regression testing is usually performed on a regular basis, typically after each new application build is generated or new hardware/firmware is installed.</p> | |
− | Regression | + | <p>Regression testing is used with many of the other techniques listed below.</p> |
− | + | ||
− | Regression testing is used with many of the other techniques listed below. | + | |
− | + | ||
<h4>Software Test Harnesses</h4> | <h4>Software Test Harnesses</h4> | ||
− | + | <p>Test harnesses automate the testing process. They consist of an execution engine and a set of test scripts that can be run to test the entire solution or a specific part of the solution. They can also consist of custom code that the testing team runs to exercise the solution in particular ways.</p> | |
− | Test harnesses automate the testing process. They consist of an execution engine and a set of test scripts that can be run to test the entire solution or | + | <p>The results from the tests are collected and compared to expected results. Test harnesses provide the following benefits over manual testing:</p> |
− | + | ||
− | The results from the tests are collected and compared to expected results. Test harnesses provide the following benefits over manual testing: | + | |
<ul> | <ul> | ||
<li>Increased productivity of staff</li> | <li>Increased productivity of staff</li> | ||
Line 480: | Line 356: | ||
<li>Ability to set up and test uncommon conditions</li> | <li>Ability to set up and test uncommon conditions</li> | ||
</ul> | </ul> | ||
− | |||
<h4>Software Unit Testing</h4> | <h4>Software Unit Testing</h4> | ||
− | + | <p>Unit tests run through small units of code to make sure that they work as designed. A unit can be as small as a single function, or it can consist of a set of functions or modules, maybe even an entire library. In most cases, unit tests are run automatically; however, in some cases, the tests must be run manually using a script that tells a person how to perform the test.</p> | |
− | Unit tests run through small units of code to make sure that they work as designed. A unit can be as small as a single function, or it can consist of a set of functions or modules, maybe even an entire library. In most cases, unit tests are run automatically; however, in some cases, the tests must be run manually using a script that tells a person how to perform the test. | + | <p>Unit testing has a couple of advantages:</p> |
− | + | ||
− | Unit testing has a couple of advantages: | + | |
<ul> | <ul> | ||
<li>Issues/bugs are easier to find and fix when the tests are confined to small amounts of code.</li> | <li>Issues/bugs are easier to find and fix when the tests are confined to small amounts of code.</li> | ||
− | <li>A developer can test | + | <li>A developer can test their code thoroughly before integrating it with the rest of the solution. The result is usually a faster and smoother integration. </li> |
</ul> | </ul> | ||
− | Unit testing is often a part of the regression testing suite. | + | <p>Unit testing is often a part of the regression testing suite. </p> |
− | + | <h4>Software and Product Integration Testing</h4> | |
− | <h4>Software and Product Integration | + | <p>Software integration testing occurs continually, as new code or changes to old code are added to the builds. Product integration testing adds a couple of the solution components together, tests, and then adds a few more pieces. Eventually, all hardware, software, and communications should be tested together. This process is typically known as ''integration testing'' (or ''integration and testing'') even though software integration testing has been occurring all along. Product integration testing allows the testing team to:</p> |
− | + | ||
− | Software integration testing occurs continually, as new code or changes to old code are added to the builds. | + | |
<ul> | <ul> | ||
<li>Test the interactions between components</li> | <li>Test the interactions between components</li> | ||
<li>Test for unanticipated performance issues</li> | <li>Test for unanticipated performance issues</li> | ||
</ul> | </ul> | ||
− | + | <p>There are several methods used with both types of integration testing:</p> | |
− | There are several methods used with both types of integration testing: | + | |
<ul> | <ul> | ||
− | <li>Bottom-up testing integrates the lowest level components first and when considered stable, tests high-level components. This technique is good when the lowest level components are done first and at about the same time. It is excellent as bugs are quite easily found.</li> | + | <li>'''Bottom-up testing''' integrates the lowest-level components first and when considered stable, tests high-level components. This technique is good when the lowest-level components are done first and at about the same time. It is excellent as bugs are quite easily found.</li> |
− | <li>Top-down testing starts with the top integrated modules and tests branches of the modules step | + | <li>'''Top-down testing''' starts with the top integrated modules and tests branches of the modules step by step until the end of the related module is found. This technique allows the team to find missing branches.</li> |
− | <li>Sandwich testing is an approach that combines bottom-up and top-down testing.</li> | + | <li>'''Sandwich testing''' is an approach that combines bottom-up and top-down testing.</li> |
− | <li>Risky module testing is an integration test that starts with the riskiest or hardest software module first.</li> | + | <li>'''Risky module testing''' is an integration test that starts with the riskiest or hardest software module first.</li> |
− | <li>End-to-end testing tests the flow of an application from start to finish, even if | + | <li>'''End-to-end testing''' tests the flow of an application from start to finish, even if the functionality in the flow isn't all complete. The benefit of this kind of testing is that it identifies system dependencies and tests to see if the right information is passed between the different components of the solution. It can be performed at a very early stage of the development and can save huge amounts of time when issues are found early in the construction process.</li> |
− | <li>Big | + | <li>'''Big bang''', '''usage model''', or '''production testing''' (used in both hardware and software testing) runs user-like workloads in integrated environments that mimic the eventual environment (often called staging environments). This type of testing not only tests the software, but also tests the environment. The downside of this type of testing is that it optimistically assumes that each of the integrated units are going to behave as planned. So although it is more efficient, if there are issues, they might be tougher to find and fix.</li> |
− | <li>Parallel | + | <li>'''Parallel testing''' is often included in production testing when replacing critical systems, such as payroll or ERP systems. In this type of testing, the new system is run in parallel with the existing system to make sure that the new system performs as expected, with no less functionality and no greater errors. It is not expected that all results will be the same, since the new system is expected to have more/better functionality than the old one.</li> |
− | <li>Production testing can uncover the need for | + | <li>'''Production testing''' can uncover the need for datacenter upgrades or enhancements before the solution goes live, which for obvious reasons is preferred. It can also uncover the need for workstation configuration changes or workstations application incompatibilities.</li> |
</ul> | </ul> | ||
− | + | <h4>Alpha and Beta Tests</h4> | |
− | <h4>Alpha | + | <p>Alpha and beta tests take integration one step further—they get the users involved. In some situations, alpha testing begins when the solution is turned over to an independent group for testing (as is typical in software product companies). In EIT, alpha tests are used to find issues with the solution at an early stage when the solution is nearly fully usable—at least there should be significant functionality to test, and the user should be able to complete significant activities. For alpha tests, the user might be an engineer or someone from the testing group. In the best case, there should be one or two users from the eventual user community involved with this testing. Future users will often find errors or problems with workflow that a developer or engineer won't. Alpha tests can last for months, as functionality is completed and refined.</p> |
− | + | <p>Beta tests are used to ensure readiness for the solution release. They should occur when the team is pretty sure that the solution is close to ready for transition to the production environment (see the http://eitbokwiki.org/Transition_into_Operation Transition Into Operation chapter]]). The beta test often only lasts for a few weeks. Beta tests not only test the integration of the system in a user environment doing user-like activities, they also test that the system works well for the users. Beta tests help identify:</p> | |
− | Alpha and beta tests take integration one step | + | |
− | + | ||
− | Beta tests are used to ensure readiness for the solution release. They should occur when the team is pretty sure that the solution is close to ready for transition to the | + | |
<ul> | <ul> | ||
− | <li>Hard to find bugs</li> | + | <li>Hard-to-find bugs</li> |
− | <li>Mismatches with the | + | <li>Mismatches with the user's workflow</li> |
<li>User interface issues</li> | <li>User interface issues</li> | ||
<li>Performance issues </li> | <li>Performance issues </li> | ||
<li>Ambiguity or lack of clarity with instructions or the interface in general</li> | <li>Ambiguity or lack of clarity with instructions or the interface in general</li> | ||
</ul> | </ul> | ||
− | + | <h4>Security Testing—Vulnerability Scans and Remediation</h4> | |
− | <h4>Security | + | <p>Twenty years ago, security testing consisted of making sure that the user authentication scheme was working as intended. Now, security testing, especially for web-based applications, requires careful designing and planning. Companies often have outside organizations attempt to "break in" to the applications to ensure their security design. In any case, this part of the testing process is now critically important and a significant part of the testing. It also can't be left to the very end. For more information, see [http://eitbokwiki.org/Security Security]. </p> |
− | + | <h3>Verification</h3> | |
− | Twenty years ago, security testing consisted of making sure that the user authentication scheme was working as intended. Now, security testing, especially for web-based applications, requires careful designing and planning. Companies often have outside organizations attempt to | + | <p>The solution verification process runs parallel to the testing process. It doesn't test for minor bugs in the engineering; instead it checks to make sure that the solution correctly reflects the technical specification and that it follows coding or other implementation standards. In essence, is the construction team building the solution correctly? </p> |
− | + | <p>Verification includes activities such as requirements/code reviews, code inspections, and code walkthroughs. All these activities are systematic reviews of computer source code that is intended to find mistakes made early in the coding phase to improve the overall quality of software. </p> | |
− | <h3> | + | |
− | + | ||
− | The solution verification process runs parallel to the testing process. It | + | |
− | + | ||
− | Verification includes activities such as requirements/code reviews, code inspections, and code walkthroughs. All these activities are systematic reviews of computer source code that is intended to find mistakes made early in the coding phase to improve the overall quality of software. | + | |
− | + | ||
<h3>Validation</h3> | <h3>Validation</h3> | ||
− | + | <p>Equally important to testing and verification, the solution needs to be validated. These reviews make sure that the construction team is building the right thing. The validation team needs to make sure that the solution correctly reflects the logical design and meets all business requirements. Most important, the validation needs to make sure that it meets customers' needs.</p> | |
− | Equally important to | + | <p>Alpha and beta tests are usually good ways to make sure that the solution is meeting the customers' needs. Just verifying that that the solution "does what it is supposed to do" is usually not good enough. As too many developers know, the logical design doesn't always get it right. When the users see the solution in their environment, they realize that it needs to behave differently than they thought. You can't find these things out without testing with users.</p> |
− | + | <p>In most organizations, the validation process ends with a signoff from the user community that indicates that they accept the solution, as constructed. </p> | |
− | Alpha and beta tests are usually good ways to make sure that the solution is meeting the | + | |
− | + | ||
− | In most organizations, the validation process ends with a signoff from the user community that indicates that they | + | |
− | + | ||
<h2>Handing off the Solution</h2> | <h2>Handing off the Solution</h2> | ||
− | + | <p>After the construction team has completed their testing, verification, and validation procedures they can hand the project off to the transition team; if there is no separate transition team, they can start the transition activities (see [http://eitbokwiki.org/Transition_into_Operation Transition Into Operation]). In EIT software development, best practice today is evolving toward a DevOps approach, in which developers work with the operations and support staff to ensure a smooth transition into production.</p> | |
− | + | <p>Connecting with those responsible for the transition to standard operations is critical. The transition team needs to understand what has been constructed, and must be extremely familiar with the technical design. They need to check that the documentation is complete enough that they can execute the transition without constantly coming back to ask questions. Technical training should also be in place for the transition team.</p> | |
− | Connecting with those responsible for the transition to standard operations is critical. The | + | <p>The quality of the solution must also meet the standards of the transition team. If they believe that the solution will not work in day-to-day operations because of quality issues, likely the construction team will need to continue to make fixes to the solution until they are satisfied.</p> |
− | + | <p>In addition, in most environments, a robust configuration management process must be in place before the handoff. The transition team will need those processes as they prepare the solution for the transition.</p> | |
− | The quality of the solution must also meet the standards of the | + | |
− | In addition, in most environments, a robust configuration management process must be in place before the handoff. The | + | |
− | + | ||
<h2>Summary</h2> | <h2>Summary</h2> | ||
− | + | <p>Today's EIT systems are complex with many components that must come together in a harmonious way. It takes a knowledgeable EIT team with diverse knowledge of hardware, infrastructure or middleware, databases, storage devices, network computing, and application development to ensure proper construction techniques are used to deliver right-sized infrastructure and a performant application. </p> | |
− | + | <p>Integrating a new solution with existing enterprise solutions is often challenging. It definitely adds to the complexity of the construction effort and requires not only expertise with technology, but also with the existing EIT applications.</p> | |
− | + | <h2>Key Maturity Frameworks</h2> | |
− | Integrating a new solution with existing enterprise solutions is often challenging. It definitely adds to the complexity of the construction effort and requires not only expertise with technology, but also with the existing EIT applications. | + | <p>Capability maturity for EIT refers to its ability to reliably perform. Maturity is measured by an organization's readiness and capability expressed through its people, processes, data, technologies, and the consistent measurement practices that are in place. See [http://eitbokwiki.org/Enterprise_IT_Maturity_Assessments Appendix F] for additional information about maturity frameworks.</p> |
− | + | <p>Many specialized frameworks have been developed since the original Capability Maturity Model (CMM) that was developed by the Software Engineering Institute in the late 1980s. This section describes how some of those apply to the activities described in this chapter. </p> | |
+ | <h3>IT-Capability Maturity Framework (IT-CMF) </h3> | ||
+ | <p>The IT-CMF was developed by the Innovation Value Institute in Ireland. This framework helps organizations to measure, develop, and monitor their EIT capability maturity progression. It consists of 35 EIT management capabilities that are organized into four macro capabilities: </p> | ||
+ | <ul> | ||
+ | <li>Managing EIT like a business</li> | ||
+ | <li>Managing the EIT budget</li> | ||
+ | <li>Managing the EIT capability</li> | ||
+ | <li>Managing EIT for business value</li> | ||
+ | </ul> | ||
+ | <p>The two most relevant critical capabilities are solutions delivery (SD) and research, development and engineering (RDE). </p> | ||
+ | <h4>Solutions Delivery Maturity</h4> | ||
+ | <p>The following statements provide a high-level overview of the solutions delivery (SD) capability at successive levels of maturity.</p> | ||
+ | <table> | ||
+ | <tr valign="top"><td width="10%">Level 1</td><td>There is ad hoc use of solutions delivery methodologies. EIT solutions are typically delivered with wide variations in quality, schedule, and cost expectations.</td></tr> | ||
+ | <tr valign="top"><td>Level 2</td><td>Basic solutions delivery methodologies are defined and applied to a limited number of EIT solution projects, which are beginning to meet expectations, but variations in quality, schedule, and cost still occur. </td></tr> | ||
+ | <tr valign="top"><td>Level 3</td><td>Standardized solutions delivery methodologies are applied to most EIT solution projects, enabling many of them to regularly meet expectations for quality, schedule, and cost. </td></tr> | ||
+ | <tr valign="top"><td>Level 4</td> | ||
+ | <td>Comprehensive and flexible project delivery methodologies are applied to all projects, enabling most projects to meet expectations for quality, schedule, and cost.</td></tr> | ||
+ | <tr valign="top"><td>Level 5</td><td>Solutions delivery methodologies are continually analyzed and refreshed. Solutions delivery expectations for quality, schedule, and cost are nearly always met. </td></tr> | ||
+ | </table> | ||
+ | <h4>Research, Development, and Engineering Maturity</h4> | ||
+ | <p>The following statements provide a high-level overview of the research, development, and engineering (RDE) capability at successive levels of maturity.</p> | ||
+ | <table> | ||
+ | <tr valign="top"><td width="10%">Level 1</td><td>The value of research into new technologies is not recognized by the organization. </td> | ||
+ | </tr> | ||
+ | <tr valign="top"><td>Level 2</td><td>EIT management begins to recognize the value of research into new technologies. However, research outcomes are primarily focused on internal goals of the EIT function (as opposed to other business units' goals). </td></tr> | ||
+ | <tr valign="top"><td>Level 3</td><td>The EIT function and some other business units jointly adjudicate on specific research projects, which are increasingly focused on identifying new technologies with the potential to address defined business objectives.</td></tr> | ||
+ | <tr valign="top"><td>Level 4</td><td>Across the organization, regular business-driven reviews assess new technology research projects and how well they could potentially meet business objectives. </td></tr> | ||
+ | <tr valign="top"><td>Level 5</td><td>Business strategy is actively informed by new technology research. </td></tr> | ||
+ | </table> | ||
<h2>Key Competence Frameworks</h2> | <h2>Key Competence Frameworks</h2> | ||
− | <p>While many large companies have defined their own sets of skills for purposes of talent management | + | <p>While many large companies have defined their own sets of skills for purposes of talent management (to recruit, retain, and further develop the highest quality staff members that they can find, afford and hire), the advancement of EIT professionalism will require common definitions of EIT skills that can be used not just across enterprises, but also across countries. We have selected three major sources of skill definitions. While none of them is used universally, they provide a good cross-section of options. </p> |
− | + | <p>Creating mappings between these frameworks and our chapters is challenging, because they come from different perspectives and have different goals. There is rarely a 100 percent correspondence between the frameworks and our chapters, and, despite careful consideration some subjectivity was used to create the mappings. Please take that in consideration as you review them.</p> | |
− | <p>Creating mappings between these frameworks and our chapters is challenging, because they come from different perspectives and have different goals. There is rarely a 100 | + | |
− | + | ||
<h3>Skills Framework for the Information Age</h3> | <h3>Skills Framework for the Information Age</h3> | ||
− | <p> The Skills Framework for the Information Age (SFIA) has defined nearly 100 skills. SFIA describes | + | <p>The Skills Framework for the Information Age (SFIA) has defined nearly 100 skills. SFIA describes seven levels of competency that can be applied to each skill. However, not all skills cover all seven levels. Some reach only partially up the seven-step ladder. Others are based on mastering foundational skills, and start at the fourth or fifth level of competency. SFIA is used in nearly 200 countries, from Britain to South Africa, South America, to the Pacific Rim, to the United States. (http://www.sfia-online.org)</p> |
− | + | <table cellpadding="5" border="1"> | |
− | <table cellpadding="5" | + | <tr valign="top"><th style="background-color: #58ACFA;"><font color="white">Skill</font></th><th style="background-color: #58ACFA;"><font color="white">Skill Description</font></th><th width="10%" style="background-color: #58ACFA;"><font color="white">Competency Levels</font></th></tr> |
− | <tr> | + | <tr valign="top"><td>Animation development</td><td>The architecture, design, and development of animated and interactive systems such as games and simulations.</td><td valign="top">3-6</td></tr> |
− | <th>Skill</th> | + | <tr valign="top"><td>Database design</td><td>The specification, design, and maintenance of mechanisms for storage and access to both structured and unstructured information, in support of business information needs.</td><td valign="top">2-6</td></tr> |
− | <th>Skill Description</th> | + | <tr valign="top"><td>Hardware design</td><td>The specification and design of computing and communications equipment (such as semiconductor processors, HPC architectures, and DSP and graphics processor chips), typically for integration into, or connection to, an EIT infrastructure or network. The identification of concepts and their translation into implementable design. The selection and integration, or design and prototyping of components. The adherence to industry standards including compatibility, security, and sustainability.</td><td valign="top">4-6</td></tr> |
− | <th width="10%">Competency Levels</ | + | <tr valign="top"><td>Information content authoring</td><td>The management and application of the principles and practices of the design, creation, and presentation of textual information, supported where necessary by graphical content for interactive and digital uses. <br /> |
− | </ | + | The adoption of workflow principles and definition of user roles and engagement and training of content providers. <br /> |
− | <tr> | + | This material may be delivered electronically (for example, as collections of web pages) or otherwise. This skill includes managing the quality assurance and authoring processes for the material being produced.</td><td valign="top">1-6</td></tr> |
− | < | + | <tr valign="top"><td>Network design</td><td>The production of network designs and design policies, strategies, architectures, and documentation, covering voice, data, text, email, facsimile, and image, to support strategy and business requirements for connectivity, capacity, interfacing, security, resilience, recovery, access, and remote access. This may incorporate all aspects of the communications infrastructure, internal and external, mobile, public and private, Internet, intranet, and call centers.</td><td valign="top">5-6</td></tr> |
− | <td>The architecture, design and development of animated and interactive systems such as games and simulations.</td> | + | <tr valign="top"><td>Porting/software configuration</td><td>The configuration of software products into new or existing software environments/platforms.</td><td valign="top">3-6</td></tr> |
− | <td valign="top" >3 - 6</td> | + | <tr valign="top"><td>Programming/software development</td><td>The design, creation, testing, and documenting of new and amended software components from supplied specifications in accordance with agreed development and security standards and processes.</td><td valign="top">2-5</td></tr> |
− | </tr> | + | <tr valign="top"><td>Systems design</td><td>The specification and design of information systems to meet defined business needs in any public or private context, including commercial, industrial, scientific, gaming, and entertainment. The identification of concepts and their translation into implementable design. The design or selection of components. The retention of compatibility with enterprise and solution architectures, and the adherence to corporate standards within constraints of cost, security, and sustainability.</td><td valign="top">2-6</td></tr> |
− | <tr | + | <tr valign="top"><td>Systems development management</td><td>The management of resources in order to plan, estimate, and carry out programs of solution development work to time, budget, and quality targets and in accordance with appropriate standards, methods, and procedures (including secure software development).The facilitation of improvements by changing approaches and working practices, typically using recognized models, best practices, standards, and methodologies. The provision of advice, assistance, and leadership in improving the quality of software development, by focusing on process definition, management, repeatability, and measurement.</td><td valign="top">5-7</td></tr> |
− | + | <tr valign="top"><td>Systems installation/decommissioning</td><td>The installation, testing, implementation, or decommissioning and removal of cabling, wiring, equipment, hardware, and associated software, following plans and instructions and in accordance with agreed standards. The testing of hardware and software components, resolution of malfunctions, and recording of results. The reporting of details of hardware and software installed so that configuration management records can be updated.</td><td valign="top">1-5</td></tr> | |
− | <td>The specification, design and maintenance of mechanisms for storage and access to both structured and unstructured information, in support of business information needs.</td> | + | <tr valign="top"><td>Systems integration</td><td>The incremental and logical integration and testing of components/subsystems and their interfaces in order to create operational services.</td><td valign="top">2-6</td></tr> |
− | <td valign="top" >2 - 6</td> | + | <tr valign="top"><td>Testing</td><td>The planning, design, management, execution, and reporting of tests, using appropriate testing tools and techniques and conforming to agreed process standards and industry-specific regulations. The purpose of testing is to ensure that new and amended systems, configurations, packages, or services, together with any interfaces, perform as specified (including security requirements), and that the risks associated with deployment are adequately understood and documented. Testing includes the process of engineering, using and maintaining testware (test cases, test scripts, test reports, test plans, etc.) to measure and improve the quality of the software being tested.</td><td valign="top">1-6</td></tr> |
− | </tr> | + | <tr valign="top"><td>User experience design</td><td>The iterative development of user tasks, interaction, and interfaces to meet user requirements, considering the whole user experience. Refinement of design solutions in response to user-centered evaluation and feedback and communication of the design to those responsible for implementation.</td><td valign="top">2-6</td></tr> |
− | <tr | + | |
− | + | ||
− | <td>The specification and design of computing and communications equipment (such as semiconductor processors, HPC architectures and DSP and graphics processor chips), typically for integration into, or connection to an | + | |
− | <td valign="top" >4 - 6</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The management and application of the principles and practices of | + | |
− | The adoption of workflow principles and definition of user roles and engagement and training of content providers. | + | |
− | This material may be delivered electronically (for example, as collections of web pages) or otherwise. This skill includes managing the quality assurance and authoring processes for the material being produced.</td> | + | |
− | <td valign="top" >1 - 6</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The production of network designs and design policies, strategies, architectures and documentation, covering voice, data, text, | + | |
− | <td valign="top" >5 - 6</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The configuration of software products into new or existing software environments/platforms</td> | + | |
− | <td valign="top" >3 - 6</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The design, creation, testing and documenting of new and amended software components from supplied specifications in accordance with agreed development and security standards and processes.</td> | + | |
− | <td valign="top" >2 - 5</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The specification and design of information systems to meet defined business needs in any public or private context, including commercial, industrial, scientific, gaming and entertainment. The identification of concepts and their translation into implementable design. The design or selection of components. The retention of compatibility with enterprise and solution architectures, and the adherence to corporate standards within constraints of cost, security and sustainability.</td> | + | |
− | <td valign="top" >2 - 6</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The management of resources in order to plan, estimate and carry out | + | |
− | <td valign="top" >5 - 7</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The installation, testing, implementation or decommissioning and removal of cabling, wiring, equipment, hardware and associated software, following plans and instructions and in accordance with agreed standards. The testing of hardware and software components, resolution of malfunctions, and recording of results. The reporting of details of hardware and software installed so that configuration management records can be updated.</td> | + | |
− | <td valign="top" >1 - 5</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The incremental and logical integration and testing of components | + | |
− | <td valign="top" >2 - 6</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The planning, design, management, execution and reporting of tests, using appropriate testing tools and techniques and conforming to agreed process standards and industry specific regulations. The purpose of testing is to ensure that new and amended systems, configurations, packages, or services, together with any interfaces, perform as specified (including security requirements) , and that the risks associated with deployment are adequately understood and documented. Testing includes the process of engineering, using and maintaining testware (test cases, test scripts, test reports, test plans, etc) to measure and improve the quality of the software being tested.</td> | + | |
− | <td valign="top" >1 - 6</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td>The iterative development of user tasks, interaction and interfaces to meet user requirements, considering the whole user experience. Refinement of design solutions in response to user- | + | |
− | <td valign="top" >2 - 6</td> | + | |
− | </tr> | + | |
− | + | ||
</table> | </table> | ||
− | |||
<h3>European Competency Framework</h3> | <h3>European Competency Framework</h3> | ||
− | <p> The European | + | <p>The European Union's European e-Competence Framework (e-CF) has 40 competences and is used by a large number of companies, qualification providers, and others in public and private sectors across the EU. It uses five levels of competence proficiency (e-1 to e-5). No competence is subject to all five levels.</p> |
− | <p>The e-CF is published and legally owned by CEN, the European Committee for Standardization, and its National Member Bodies (www.cen.eu). Its creation and maintenance has been co-financed and politically supported by the European Commission, in particular, DG (Directorate General) Enterprise and Industry, with contributions from the EU ICT multi-stakeholder community, to support competitiveness, innovation, and job creation in European industry. The Commission works on a number of initiatives to boost ICT skills in the workforce. | + | <p>The e-CF is published and legally owned by CEN, the European Committee for Standardization, and its National Member Bodies (www.cen.eu). Its creation and maintenance has been co-financed and politically supported by the European Commission, in particular, DG (Directorate General) Enterprise and Industry, with contributions from the EU ICT multi-stakeholder community, to support competitiveness, innovation, and job creation in European industry. The Commission works on a number of initiatives to boost ICT skills in the workforce. Version 1.0 to 3.0 were published as CEN Workshop Agreements (CWA). The e-CF 3.0 CWA 16234-1 was published as an official European Norm (EN), EN 16234-1. For complete information, see http://www.ecompetences.eu. </p> |
− | + | <table cellpadding="5" border="1"> | |
− | Version 1.0 to 3.0 were published as CEN Workshop Agreements (CWA). | + | <tr valign="top"><th width="85%" style="background-color: #58ACFA;"><font color="white">e-CF Dimension 2</font></th><th style="background-color: #58ACFA;"><font color="white">e-CF Dimension 3</font></th></tr> |
− | The e-CF 3.0 CWA 16234-1 was published as an official European Norm (EN), EN 16234-1. | + | <tr valign="top"><td><strong>A.5. Architectural Design (PLAN)</strong><br />Specifies, refines, updates, and makes available a formal approach to implement solutions necessary to develop and operate the IS architecture. Identifies change requirements and the components involved: hardware, software, applications, processes, information, and technology platform. Takes into account interoperability, scalability, usability, and security. Maintains alignment between business evolution and technology developments.</td><td valign="top">Level 3-5</td></tr> |
− | For complete information, | + | <tr valign="top"><td><strong>A.6. Application Design (PLAN)</strong><br />Analyzes, specifies, updates, and makes available a model to implement applications in accordance with IS policy and user/customer needs. Selects appropriate technical options for application design, optimizing the balance between cost and quality. Designs data structures and builds system structure models according to analysis results through modeling languages. Ensures that all aspects take account of interoperability, usability and security. Identifies a common reference framework to validate the models with representative users, based upon development models (e.g., iterative approach).</td><td valign="top">Level 1-3</td></tr> |
− | + | <tr valign="top"><td><strong>B.1. Application Development (BUILD)</strong><br />Interprets the application design to develop a suitable application in accordance with customer needs. Adapts existing solutions, for example, by porting an application to another operating system. Codes, debugs, tests, documents, and communicates product development stages. Selects appropriate technical options for development such as reusing, improving, or reconfiguring existing components. Optimizes efficiency, cost, and quality. Validates results with user representatives, integrates and commissions the overall solution. </td><td valign="top">Level 1-3</td></tr> | |
− | <table cellpadding="5" | + | <tr valign="top"><td><strong>B.2. Component Integration (BUILD)</strong><br />Integrates hardware, software, or subsystem components into an existing or new system. Complies with established processes and procedures, such as configuration management and package maintenance. Takes into account the compatibility of existing and new modules to ensure system integrity, system interoperability, and information security. Verifies and tests system capacity and performance and documentation of successful integration. </td><td valign="top">Level 2-4</td></tr> |
− | <tr> | + | <tr valign="top"><td><strong>B.3. Testing (BUILD)</strong><br />Constructs and executes systematic test procedures for ICT systems or customer usability requirements to establish compliance with design specifications. Ensures that new or revised components or systems perform to expectation. Ensures meeting of internal, external, national, and international standards; including health and safety, usability, performance, reliability, or compatibility. Produces documents and reports to evidence certification requirements. </td><td valign="top">Level 1-4</td></tr> |
− | <th width="85%">e-CF Dimension 2</th><th | + | <tr valign="top"><td><strong>B.5. Documentation Production (BUILD)</strong><br />Produces documents describing products, services, components, or applications to establish compliance with relevant documentation requirements. Selects appropriate style and media for presentation materials. Creates templates for document-management systems. Ensures that functions and features are documented in an appropriate way. Ensures that existing documents are valid and up to date. </td><td valign="top">Level 1-3</td></tr> |
− | </tr> | + | <tr valign="top"><td><strong>B.6. Systems Engineering (BUILD)</strong><br />Engineers software and hardware components to meet solution requirements such as specifications, costs, quality, time, energy efficiency, information security, and data protection. Follows a systematic methodology to analyze and build the required components and interfaces. Builds system structure models and conducts system behavior simulation. Performs unit and system tests to ensure requirements are met.</td><td valign="top">Level 3-4</td></tr> |
− | <tr | + | |
− | + | ||
− | <td valign="top">Level 3-5</td> | + | |
− | </tr> | + | |
− | <tr | + | |
− | + | ||
− | <td valign="top">Level 1-3</td> | + | |
− | </tr> | + | |
− | + | ||
− | <tr | + | |
− | + | ||
− | <td valign="top">Level 1-3</td> | + | |
− | </tr> | + | |
− | + | ||
− | <tr | + | |
− | + | ||
− | <td valign="top">Level 2-4</td> | + | |
− | </tr> | + | |
− | + | ||
− | <tr | + | |
− | + | ||
− | <td valign="top">Level 1-4</td> | + | |
− | </tr> | + | |
− | + | ||
− | <tr | + | |
− | + | ||
− | <td valign="top">Level 1-3</td> | + | |
− | </tr> | + | |
− | + | ||
− | <tr | + | |
− | + | ||
− | <td valign="top">Level 3-4</td> | + | |
− | </tr> | + | |
− | + | ||
</table> | </table> | ||
− | + | <h3>i Competency Dictionary </h3> | |
− | <h3>i Competency Dictionary | + | <p>The Information Technology Promotion Agency (IPA) of Japan has developed the i Competency Dictionary (iCD) and translated it into English, and describes it at https://www.ipa.go.jp/english/humandev/icd.html. The iCD is an extensive skills and tasks database, used in Japan and southeast Asian countries. It establishes a taxonomy of tasks and the skills required to perform the tasks. The IPA is also responsible for the Information Technology Engineers Examination (ITEE), which has grown into one of the largest scale national examinations in Japan, with approximately 600,000 applicants each year.</p> |
− | <p>The Information Technology Promotion Agency (IPA) of Japan has developed the i Competency Dictionary (iCD) | + | <p>The iCD consists of a Task Dictionary and a Skill Dictionary. Skills for a specific task are identified via a "Task x Skill" table. (See [http://eitbokwiki.org/Glossary Appendix A] for the task layer and skill layer structures.) EITBOK activities in each chapter require several tasks in the Task Dictionary. </p> |
− | + | <p>The table below shows a sample task from iCD Task Dictionary Layer 2 (with Layer 1 in parentheses) that corresponds to activities in this chapter. It also shows the Layer 2 (Skill Classification), Layer 3 (Skill Item), and Layer 4 (knowledge item from the IPA Body of Knowledge) prerequisite skills associated with the sample task, as identified by the Task x Skill Table of the iCD Skill Dictionary. The complete iCD Task Dictionary (Layer 1-4) and Skill Dictionary (Layer 1-4) can be obtained by returning the request form provided at http://www.ipa.go.jp/english/humandev/icd.html. </p> | |
− | <p>The iCD consists of a Task Dictionary and a Skill Dictionary. Skills for a specific task are identified via a | + | |
− | + | ||
− | <p>The table below shows a sample task from iCD Task Dictionary Layer 2 (with Layer 1 in parentheses) that | + | |
− | + | ||
<table cellpadding="5" border="1"> | <table cellpadding="5" border="1"> | ||
− | <tr> | + | <tr valign="top"> |
− | <th font-size="14pt">Task Dictionary</th><th colspan="3">Skill Dictionary</th> | + | <th width="15%" style="background-color: #58ACFA;" font-size="14pt"><font color="white">Task Dictionary</font></th><th colspan="3" style="background-color: #58ACFA;" font-size="14pt"><font color="white">Skill Dictionary</font></th> |
</tr> | </tr> | ||
− | <tr> | + | <tr valign="top"> |
− | <th width="30%">Task Layer (Task | + | <th width="30%" style="background-color: #58ACFA;"><font color="white">Task Layer 1 (Task Layer 2)</font></th><th width="15%" style="background-color: #58ACFA;"><font color="white">Skill Classification</font></th><th width="15%" style="background-color: #58ACFA;"><font color="white">Skill Item</font></th><th width="40%" style="background-color: #58ACFA;"><font color="white">Associated Knowledge Items</font></th> |
− | </ | + | <tr valign="top"><td><em><strong>Software engineering methods <br />(application systems development)</strong></em></td> |
− | + | <td valign="top">Software engineering methods </td> | |
− | <tr | + | |
− | + | ||
− | <td valign="top">Software engineering methods | + | |
− | + | ||
− | </td> | + | |
<td valign="top">Software creation methods<td> | <td valign="top">Software creation methods<td> | ||
<ul> | <ul> | ||
Line 721: | Line 500: | ||
<li>Test data preparation</li> | <li>Test data preparation</li> | ||
<li>Test environmental setting</li> | <li>Test environmental setting</li> | ||
− | <li>Understanding and implementation of test processes, procedures and methods</li> | + | <li>Understanding and implementation of test processes, procedures, and methods</li> |
<li>Debugger, simulator, etc.</li> | <li>Debugger, simulator, etc.</li> | ||
<li>Utilization and implementation of debugging tools</li> | <li>Utilization and implementation of debugging tools</li> | ||
Line 736: | Line 515: | ||
</tr> | </tr> | ||
</table> | </table> | ||
− | |||
− | |||
<h2>Key Roles</h2> | <h2>Key Roles</h2> | ||
<ul> | <ul> | ||
− | |||
<li>Application Developer</li> | <li>Application Developer</li> | ||
− | |||
− | |||
− | |||
<li>Business Analysts</li> | <li>Business Analysts</li> | ||
+ | <li>Business Application Owner</li> | ||
+ | <li>Business Process Owner</li> | ||
<li>Configuration Management Engineer</li> | <li>Configuration Management Engineer</li> | ||
− | <li>Database | + | <li>Database Administrator</li> |
− | <li> | + | <li>Datacenter Lead</li> |
+ | <li>EIT Development/Maintenance Unit Lead</li> | ||
+ | <li>Project Manager</li> | ||
<li>Technical Lead </li> | <li>Technical Lead </li> | ||
<li>Web Developer</li> | <li>Web Developer</li> | ||
</ul> | </ul> | ||
− | + | <p>Other key roles are:</p> | |
+ | <ul> | ||
+ | <li>Data Architect</li> | ||
+ | <li>Product Manager </li> | ||
+ | <li>Product Owner</li> | ||
+ | <li>Project Manager</li> | ||
+ | <li>Security Manager</li> | ||
+ | <li>Test Team</li> | ||
+ | <li>User Experience Team</li> | ||
+ | </ul> | ||
<h2>Standards</h2> | <h2>Standards</h2> | ||
<ul> | <ul> | ||
− | <li>ISO/IEC/IEEE 24765:2010 Systems and Software | + | <li>ISO/IEC/IEEE 24765:2010 Systems and Software Engineering—Vocabulary</li> |
− | <li>ISO/IEC/IEEE 15288:2015 Systems and software | + | <li>ISO/IEC/IEEE 15288:2015 Systems and software engineering—System lifecycle Processes</li> |
− | <li>IEEE 802.1QCD- | + | <li>IEEE 802.1QCD-2015—IEEE Standard for local and metropolitan area networks—Bridges and bridged networks—Amendment 23: Application virtual local area network (VLAN) type, length, value (TLV)</li> |
− | <li>IEEE Std 828- | + | <li>IEEE Std 828-2012—IEEE Standard for Configuration Management in Systems and Software Engineering</li> |
− | <li>ISO/IEC 24764:2010 Information | + | <li>ISO/IEC 24764:2010 Information technology—Generic cabling systems for data centers</li> |
− | <li>ANSI/ISA 71.04- | + | <li>ANSI/ISA 71.04-2013—Environmental Conditions for Process Measurement and Control Systems: Airborne Contaminants</li> |
<li>IEEE Std 1012™:2016, IEEE Standard for System and Software Verification and Validation </li> | <li>IEEE Std 1012™:2016, IEEE Standard for System and Software Verification and Validation </li> | ||
− | <li>ISO/IEC/IEEE 12207:2016, Systems and software engineering—Software | + | <li>ISO/IEC/IEEE 12207:2016, Systems and software engineering—Software lifecycle processes (in preparation) </li> |
− | <li> ISO/IEC/IEEE 29119, Systems and software engineering—Software testing (in 4 parts)</li> | + | <li>ISO/IEC/IEEE 29119, Systems and software engineering—Software testing (in 4 parts)</li> |
</ul> | </ul> | ||
− | |||
<h2>References</h2> | <h2>References</h2> | ||
+ | <!-- | ||
<font color="blue>This section needs to be updated to reflect the new content. Several of these references will go away.</font> | <font color="blue>This section needs to be updated to reflect the new content. Several of these references will go away.</font> | ||
− | + | --> | |
− | [1] Project Management Institute, | + | <div id="Const_One"></div><p>[1] Deming, W. Edwards (1993). "The New Economics for Industry, Government, and Education" Boston, Ma: MIT Press. p. 132. ISBN 0262541165.</p> |
− | + | <div id="Const_Two"></div><p>[2] Project Management Institute, "A Guide to the Project Management Body of Knowledge (PMBOK Guide)—Fifth Edition", PMI Inc., 2013; https://www.pmi.org/pmbok-guide-standards</p> | |
− | + | <div id="Const_Three"></div><p>[3] The Data Management Association, "The DAMA Guide to The Data Management Body of Knowledge (DAMA DMBOK Guide)", First Edition, Technics Publications, LLC, 2009, Section 5.2.4.1.1, p. 103</p> | |
− | + | <div id="Const_Four"></div><p>[4] Marc L. Songini, "QuickStudy: ETL", Computer World, Feb 2, 2004; http://www.computerworld.com/article/2575153/business-intelligence/quickstudy---etl.html</p> | |
− | [3 | + | <div id="Const_Five"></div><p>[5] Anne Stuart, "TechTarget Business Term Glossary", Feb. 2012; http://whatis.techtarget.com/definition/business-process-modeling</p> |
− | + | <div id="Const_Six"></div><p>[6] International Organization for Standards, "ISO/IEC 24764:2010", http://www.iso.org/iso/catalogue_detail.htm?csnumber=43520 </p> | |
− | + | <div id="Const_Seven"><p>[7] Data Center Knowledge, "SAS 70, SSAE 16, SOC and Data Center Standards" Industry Perspectives, March 2011; http://www.datacenterknowledge.com/archives/2011/03/03/sas-70-ssae-16-soc-and-data-center-standards/</p> | |
− | + | <div id="Const_Eight"><p>[8] IEEE Computer Society Products and Services, Guide to the Software Engineering Body of Knowledge, Version 3.0, IEEE-CS, Chapter 3 Software Construction.</p> | |
− | [5] Anne Stuart, | + | <h3>Outstanding Sources</h3> |
− | > | + | <p>McConnell, Steve. (2004) Code Complete (Second ed.). Microsoft Press. ISBN 0-7356-1967-0.</p> |
− | [6] International Organization for Standards, | + | <p>Meek, Brian; Heath, Patricia (1980), Guide to Good Programming Practice, Ellis Horwood, Wiley.</p> |
− | + | <p>International Institute of Business Analysis, "A Guide to the Business Analysis Body of Knowledge® Version 2.0", IIBA, 2009, p. 4.</p> | |
− | [7] Data Center Knowledge, | + | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | [ | + | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | <h3>Outstanding | + | |
− | < | + | |
− | McConnell, Steve. (2004) Code Complete (Second ed.). Microsoft Press. | + | |
− | Meek, Brian; Heath, Patricia (1980), Guide to Good Programming Practice, Ellis Horwood, Wiley. | + | |
− | + | ||
− | < | + | |
− | + | ||
− | < | + | |
− | + |
Latest revision as of 02:20, 23 December 2017
|
Contents
- 1 Introduction
- 2 Goals and Guiding Principles
- 3 Context Diagram
- 4 Preparation for Construction
- 5 Developing the Physical Design
- 6 Planning and Managing the Development
- 7 Developing the Application
- 8 Testing, Verifying, and Validating the Solution
- 9 Handing off the Solution
- 10 Summary
- 11 Key Maturity Frameworks
- 12 Key Competence Frameworks
- 13 Key Roles
- 14 Standards
- 15 References
1 Introduction
Once the requirements for a solution have been agreed upon and analyzed, the development team can start constructing the solution based upon the conceptual and logical designs. This construction phase can be short and relatively simple, or it can be long and complex. Recommended practices include constructing, testing, and integrating the pieces as they emerge. In any case, it requires strong technical, software, and service project management skills.
All solution construction needs go through a plan > do > study (test) > act/(adjust) cycle to ensure continuous improvement and maturity of the solution and the processes associated with it. When this cycle happens continuously, it leads to faster development cycles and better outcomes. [1] Most agile development methodologies embody this concept in their cores.
Throughout the construction phase, the team needs to remember that the goal of the project is to be able to integrate the solution into the users' production environment as seamlessly as possible. And, when we say integration, we mean integration with pre-existing software, hardware, databases, and personnel workflow. Integration into the destination production environment always needs to be in the forefront of the developers' minds.
It is also critical for the development team to build to the enterprise's architectural standards (see Enterprise Architecture) and accepted practices. If all goes according to plan, the solution will be handed off to the transition team who will execute the integration of the solution into the existing operations environment. Today, DevOps approaches provide a good model for transitioning.
2 Goals and Guiding Principles
The construction phase is typically the hardest phase of the solution lifecycle. This is due to several things. First, the construction team must find and resolve all previously unsurfaced issues with the requirements and logical design of the solution. Often these issues arise while coding or hardware configuration is in progress. Second, the construction team must keep their eye firmly on all the critical EIT quality attributes while they are constructing, such as interoperability, security, quality, disaster preparedness, and supportability. Quality attributes are requirements and should be prioritized accordingly, with parameters provided as release requirements for testing.
The goals of the solution construction phase are actually quite daunting:
- Construct a solution that satisfies all functional and non-functional requirements (see Requirements).
- Construct a solution that is accepted by target users and management.
- Construct a solution that is sufficiently well tested and bug free.
- Construct a solution that EIT operations can easily support.
- Construct a solution that interoperates with and integrates well into existing computational, operational, and physical environments.
- Ensure that new EIT services can be integrated into business operations.
- Ensure that the solution is well documented for users (including end users and the operations team).
- Leave enough documentation about the solution's construction to enable successors to fix, modify, and enhance the solution and stay within the intent of the logical and technical design.
There are a several important principles that serve every development team during the construction phase:
- Design is not coding; coding is not design—Both are important, but you need to do the design, not just sit down and code. The design process should be thorough enough to avoid the need for re-engineering and recoding. A thorough design pays for itself. This principle is true whether you are using a waterfall, prototyping iterative spiral, rapid, extreme, or agile development methodology. That is why many agile methodologies require upfront architecture design.
- Minimize complexity—The KISS principle (keep it simple stupid) was popular in the 1970s, but its idea is still important. Although it applies to many engineering domains, it is extremely applicable to software. Simple designs are easier to build, debug, maintain, and change.
- Accommodate change—The only thing that one can count on in life is change. This is also true in developing EIT solutions. It is critical to design the solution to accommodate change, because it will be required.
- Test early and often—There have been many studies that have shown that the cost of having and fixing a bug in code increases significantly the longer the bug exists. The cost of fixing bugs increases as the code progresses through each stage: in the hands of the developer, in the hands of the testing and debugging team, in transition, and in operations. Only one thing helps, catching bugs as soon as possible.
- Integrate code early and often—Software integration needs to be continuous, not something that happens at the very end. Software integration should be managed via configuration control tools to maintain the integrity of the code base as it evolves.
- Build in quality and security—Assess the design/solution for meeting requirements for quality attributes, including interoperability, maintainability, and security as it is being created, not after the fact.
3 Context Diagram
Figure 1. Context Diagram for Construction
4 Preparation for Construction
One would think that the requirements analysis and logical design phase (see Requirements) is the preparation required for construction to proceed. It does (or maybe should) provide all the necessary background information; however, the construction team may not be the team that prepared the requirements and logical design artifacts, so it is critical for the construction team to become familiar with the requirements as developed.
The team needs to prepare for construction to:
- Get the solution right
- Understand completely what each team member needs to accomplish
- Establish important relationships with users and stakeholders up front
- Understand each construction team member responsibilities
There are several critical activities that should occur during the preparation phase:
- Collect and review all requirements outputs/artifacts, including use cases
- Understand the relationships among requirements
- Meet with stakeholders and users to confirm understanding.
- Select an appropriate development methodology
4.1 Collect and Review Requirements
The goal of the requirements analysis and logical design activities is to understand and document all the requirements sufficiently for the consumers of the artifacts (developers, testers, user documentation writers, transition team, and operations team) to be able to do their jobs. The requirements must be sufficient to develop a logical design that the construction team can turn into a physical design. The construction team needs to become intimately familiar with all the artifacts that the requirements team has generated.
Because of their fresh eyes and different (implementation) perspective, the construction team will often find ambiguous requirements that need to restated. They might find conflicting requirements that need to be resolved. And, they might also find incomplete or missing requirements (often called "derived requirements") that need to be added to the list. In the best of all worlds, these issues are found during the preparation phase rather than while programmers are coding or users are testing.
4.2 Review Use Cases
If the requirements team did their job well, there should be many use cases. These use cases indicate in words or pictures how the system should behave. It is critical for the construction team to review all use cases in detail. The goal is to have the solution behave like the use cases and to identify where it might not be able to.
Use cases are often the best measure of whether the construction team is doing their job right. In addition, use cases might implicate the need for particular hardware or software resources to enable construction of the solution. For example, a use case of a mobile app might indicate the need for a particular feature, such as GPS or fingerprint security, that limits the devices to those that have the built-in features.
In addition, use cases are often excellent guides for developing test cases for the constructed solution. Note that during the use case review process, the construction team often identifies "holes" in the use cases, that is, situations that were not covered or options that were not explored. The construction team needs to take careful note of the use case issues. They might be required to add use cases and get them verified by the SME or stakeholders; or, the construction or test team might make notes that will result in more test cases.
4.3 Meet with Stakeholders and Users
Too often, developers want to hide in the back room while constructing the solution. Then, when they think they are done, they reveal the "finished" solution to the awe and applause of the users. Unfortunately, this is not a good tactic, because it rarely results in the awe and applause that the developers are seeking. Surprise! What do you mean this doesn't work the way the users want it to?
Involving the stakeholders and users throughout the construction process is essential. Even though the requirements team did their job and showed them all the designs, there is just something different about seeing the thing work for real, even if it is just a prototype. Users don't get it until the solution is there in front of them.
Developing a good relationship with representatives of the user community is critical. Starting the process at the beginning of the construction phase often has the best results. If possible, identify a couple of friendly individuals who are not intimidated by technology and who are excited to try out the solution. Get to know their perspective about what the system needs to do and how it needs to work to help them do their job. Understand how they want to be involved in the process. Determine if they are willing to try out prototypes or be beta testers.
Also, find the right people in your user community and stakeholders to figure out how to stage the rollout of the solution. It is true that some solutions can be constructed and rolled out in one wave of the magic wand; however, most solutions are best constructed and tested in stages—each stage resulting in an increment that adds new features. Stakeholders and users often have the best ideas of what should be included in each increment and how many stages make sense. They know what makes a system whole and worth running through an alpha or beta test.
4.4 Select a Development Methodology
A system or system development methodology is the process that is used to structure, plan, and control the process of developing a solution. Most enterprises adopt one development methodology for EIT projects (and in fact, maybe for all corporate projects) and each project is required to use that methodology. However, if a methodology is not prescribed by the EIT department, the project needs to select one. The most common are mentioned in the section on Development Methodologies.
5 Developing the Physical Design
During the physical design activities, all the conceptual and logical specifications of the system are converted to descriptions of the solution in terms of software, databases, hardware, and networks, as well as the connections between all the parts that will result in the desired behavior. The physical or technical design doesn't only specify the what is being implemented, but also how it will be implemented, including what programming languages and programming standards to use, the infrastructure to build, critical algorithms to implement, the systems support, and so on.
There are many rules of thumb that help keep the physical designers on track:
- The technical designers should minimize the intellectual distance between the software/hardware and the task as it exists in the real world, keeping the connection between the two as simple as possible. That is, the structure of the software design should (whenever possible) mimic the structure of the problem domain. Selecting the appropriate architecture pattern is crucial.
- Good designers consider alternative development approaches, judging each based on the requirements of the problem, the resources available to do the job, and the required performance.
- Good designers avoid reinventing the wheel. Systems are constructed using a set of design patterns, many of which have been encountered before. Selecting existing patterns that work well is always a better alternative to reinvention. Reuse typically minimizes development time and the amount of resources used to complete the project. Also, organizations that manifest a not invented here (NIH) syndrome often miss out on exceptional solutions that save time and money.
The technical design needs to be carefully reviewed to minimize conceptual (semantic) errors that can occur translating the logical design into a technical one. Sometimes there is a tendency to focus on minutiae when the technical design is reviewed, missing the forest for the trees. A design team should ensure that major conceptual elements of the design (such as omissions, ambiguity, and inconsistency) have been addressed before worrying about the syntax of the design model.
Note that the technical design for the solution needs to be worked on by a solution or enterprise architect associated with the construction team, even if the solution construction is going to be completely or partly outsourced.
5.1 Application Design
Developing an application these days can mean number of things, including developing:
- A client-based application, or fat-client
- A server-based application (likely with a thin client)
- A web-based application
- A mobile device application
An application can be interactive and thereby require a user interface, or it can be non-interactive (such as a utility program) and just perform its function in the background. In any case, the application design should include the user interface, important behaviors, algorithmic design, data structure design, access design, and the interactions between the application and other components of the solution.
User experience (UX) design has become increasingly important as tablets and other mobile platforms have become ubiquitous. As a result, users' expectations of interface behavior and intuitiveness have risen considerably. The interface is only a part of the UX, though. A host of other features, such as overall usability and suitability, play important parts.
One of the foremost experts in this area, Don Norman, explains: "The first requirement for an exemplary user experience is to meet the exact needs of the customer, without fuss or bother. Next comes simplicity and elegance that produce products that are a joy to own, a joy to use. True user experience goes far beyond giving customers what they say they want, or providing checklist features. In order to achieve high-quality user experience in a company's offerings, there must be a seamless merging of the services of multiple disciplines, including engineering, marketing, graphical and industrial design, and interface design." (https://www.nngroup.com/articles/definition-user-experience/)
5.1.1 Software Framework Selection
A software framework is a universal, reusable software development environment that provides functionality that facilitates the development of software solutions. Frameworks often include code compilers, code libraries, programming tools, application programming interfaces (APIs), and code configuration tools, among other tools. Why use a framework? Because it leverages the work of many other programmers. Frameworks are often a tremendous source of tested, highly functional algorithms, data structures, and code infrastructure. Solution construction can be faster, more efficient, and more reliable (and obviate a lot of drudge work).
There are many frameworks available. Some are proprietary, some are free/libre and open source software (FLOSS). Usually they are based on a particular programming language (such as Java, C++, C#, PHP, XML, Ruby, and Python) and application environment (client, web, server, or mixed environments). Some of the more popular frameworks include:
- Google Web Toolkit (GWT)—Functionality includes extensive interaction with Ajax, and you can simply write your front end in Java and the GWT compiler converts your Java classes to browser-compliant JavaScript and HTML. Also includes interaction with Google Gears for creating applications available offline.
- Spring Framework—This framework can run on any J2EE server. It has a multilayered architecture with an extensive API.
- Apache Cocoon—Specifically supports component-based development with a strong emphasis on working with XML and then translating to other portable formats.
- JavaServer Faces (JSF)—Provides help to build user interfaces for JavaServer applications. It helps developers construct UIs, connect UI components to an application data source, and write client-generated events to server-side event handlers.
- Symfony—This is a set of reusable PHP components that can be used to build robust applications for an enterprise environment. Everything can be customized. Lots of help for testing, debugging, and documenting the solution.
- Django—A Python framework that has a template system and dynamic database access API that is used often for content retrieval.
5.2 Database Design
The database design determines how stored data is organized, stored, and retrieved. Potentially, the database design determines the type of database (e.g., hierarchical, relational, object-oriented, networked) that needs to be constructed and the database technology that will be used (e.g., Oracle, Sybase, SQL Server). The design also specifies the details of who has access to the data and when they have access and whether or not the database needs to be distributed. [3]
There are two situations to consider:
- The new solution database stands alone.
- The new solution database integrates with already operational databases.
The first situation is the least complicated of the two. When the new solution database stands alone, the design team can determine the type, technology, access rules, and behaviors without much consideration of what else happens in operations. But, of course, there will likely be EIT department standards, technologies, and methodologies that need to be followed.
When the new solution data needs to be integrated with an already operational database—and, given the ever-growing demand for interoperability, this is almost always the case—the database design and the transition plan usually become much more complicated. The construction team needs to consider:
- How much of the data that the new solution needs already exists in the database?
- Is the operational database in the right form and does it use the correct data types for the new solution?
- Does the database need to be restructured due to different types of database queries or reports that need to be written?
- Is it necessary to change any technologies to accommodate the functionality or the hosting of the new solution?
Planning a database integration can be extremely difficult, and it usually requires planning and writing an extract, transform, and load (ETL) [4] conversion program that will move the data from one structure/technology to another. It might also then require modifications to existing applications that use the existing databases.
Note: It is often the case that the database design fluctuates while the solution code is being written. It is difficult to completely understand how the data needs to be accessed and stored until much of the code is written. Sometimes changes in an algorithm can require a structural change in the database schema or even a technology change. Another consideration is determining where certain operations will be executed, such as via stored procedures in the database or in application code. Depending on one's choice, there can be significant differences in performance, for example.
5.3 Server and Storage Design
Server design determines what functionality is performed on general servers rather than on clients or mobile devices. There is often a good deal of discussion by the team to determine where particular functions take place. There are many trade offs. Performing functions on the client enhance performance and security. Performing functions on a server allows for access to larger datasets and files, but may lead to latency issues.
In this day, rarely is there a single server anywhere. In most instances, enterprises create or lease server farms to handle the computational load. As the demand for servers increases, so does the complexity of the server farm design. In the end, the server design team needs to determine:
- Location: Where should the servers be located? Do they need to be distributed among multiple locations?
- Redundancy: Are the servers so critical that there needs to be significant redundancy, such as multiple server farms? Or would failover and hot-swap capabilities be sufficient?
- Computational needs: How much computation needs to be performed on the servers? As a result, what kind of peak computational loads are expected? How does that affect the need for resources? What kind of load-balancing is needed?
- Performance: What kind of response times are required and how does that affect the number of servers needed?
- Security: What kind of security do we need for our servers?
- Reuse: Can we use any of our current servers or server farms for this purpose? If how, how does this new solution affect their performance?
Storage design consists of determining the technical requirements for how information is stored and accessed. The things to consider are:
- Location: Where does the information need to be stored? On the client? On a server? In a public or proprietary cloud?
- Amount: How much information needs to be stored? Is it permanent or transient? And, if transient, how long does it need to be stored? Are there contractual obligations for maintaining data? Would archiving suffice?
- Performance: How fast does the storage and retrieval process need to be?
- Security: How secure must the data be?
- Redundancy: Do we need to provide data storage redundancy? If so, how transparent must the access be?
- Backup: What is the data backup plan? How much do we rely on our data redundancy versus other kinds of backup storage? How often do we back up? How long do we keep the data? What about off-site storage? Are there any escrow requirements?
- Reuse: Can we use any of our current storage systems for this new solution? If so, how will this new solution affect their performance or sizing of the existing systems?
As with the database design, the true server and storage needs might not be totally clear until the code is nearing completion; however, coming up with a conservative guess to start is required to make progress on the storage and server acquisition and implementation.
5.4 Network and Telecommunication Design
Network design needs to ensure that the network can meet the capacity and speed needs of the users and that it can grow to meet future needs. Many consider the designing process to encompass three major steps:
- The network topological design describes the components needed for the network along with their placement and how to connect them.
- Network synthesis determines the size of the components needed to meet the performance requirements, in this case often known as grade of service (GoS). This stage uses the topology, GoS, and cost of transmission to calculate a routing plan and the size of the components.
- The network realization stage determines how to meet the capacity needs for the solution and how to ensure the reliability of the network. Using all the information related to costs, reliability, and user needs, this planning process calculates the physical circuit plan.
The network and telecommunication plans and design not only contain topological diagrams of equipment and wiring, they also must cover:
- Information about equipment delivery and customization and/or fabrication
- Plans to test reliability and quality of network gear and services
- Plans for IP address management for network VLANs and subnets
- Firewall locations and settings
- Methods to monitor and manage network traffic
- Network optimization to enable delivery of services over geographically dispersed areas of an enterprise
- Policies and procedures to keep the entire network and subnets working as designed
5.5 EIT Infrastructure Support Design and Planning
EIT infrastructure comprises those systems, software, and services that are used to support the organization. They are not specifically for one project or solution. They are used by most (if not all) projects and solutions. Infrastructure services is a foundation for both the construction of solutions as well as the operation of solutions. It is rare that the EIT organization creates the infrastructure components. Nearly all come from third-party vendors. Still the EIT organization needs to select, integrate, operate, and maintain the components in the context of their operations. For detailed information about how to work with vendors to acquire components, see Acquisition.
Although there is some disagreement as to the exact list of EIT infrastructure components, the following types of components are typical:
- Application development tools and services—There are many items that belong in this list from software development platforms, platform middleware, integration-enabling software, testing harnesses, and configuration management tools. All these tools help independently designed and constructed applications to work together. They also increase the productivity of the engineering staff.
- Information management software tools and services—The components in this area include data integration tools, data quality tools, and database management systems.
- Storage management software and services—This group includes all software products that help manage and protect devices and data. These tools manage the capacity, performance, and availability of data stored on all devices including disks, tapes, optical devices, and the networking devices that handle data.
- EIT operations management tools and services—This includes all the tools required to manage the provisioning, capacity, performance, and availability of the computing, networking, and application environment.
- Security management tools and services—These tools and services test, control, and monitor access to internal and external EIT resources.
- Operating systems and other software services—The base-level operating systems that run on all devices need to be selected and maintained. OSs manage a computer's resources, control the flow of information to and from a main processor, manage memory, control display and peripheral devices, perform networking and file management, and manage resource allocation between software and system components. Beyond operating systems, other infrastructure software such as clustering and remote control software, directory servers, OS tools, Java servers, mainframe infrastructure, and mobile and wireless infrastructures are usually required.
5.6 Desired Technical Design Qualities
When creating a technical design, the team should do their best to build in a number of qualities in all the components. Several of these qualities are unique to the construction phase, such as modularity; however, other qualities are important in all phases of the application lifecycle, from requirements development to operations, such as reliability, security, and traceability.
- Compatibility—The software and hardware is able to operate with other solutions that are designed to interoperate. For example, a piece of software should be backward-compatible with an older version of itself.
- Extensibility—New capabilities can be added to the software without major changes to the underlying architecture.
- Fault-tolerance—The software is resistant to and able to recover from component failure. The design should be structured to degrade gently, even when aberrant data, events, or operating conditions are encountered. Well-designed software should never "bomb." It should accommodate unusual circumstances, and if it must terminate processing, do so in a graceful manner.
- Consistency—The design should be consistent. A consistent design appears as if one person developed the entire thing; the components need to be totally compatible.
- Integrability—An integrable design uses a uniform set of coding styles and conventions. In addition, great care is taken to define the interfaces between design components so that integration does not introduce hundreds of bugs that are hard to track down.
- Maintainability—A measure of how easily bug fixes or functional modifications can be accomplished. High maintainability can be the product of modularity and extensibility.
- Modularity—The resulting software comprises well-defined, independent components that leads to better maintainability. The components could be then implemented and tested in isolation before being integrated to form a desired software system. This allows division of work in a software development project.
- Performant—The software performs its tasks within a user-acceptable time. The solution only consumes a reasonable amount of resources, whether they be power, memory, disk space, network bandwidth, or other.
- Portability—The solution can be moved to different environments, if necessary.
- Reliability—The software is able to perform a required function under stated conditions for a specified period of time.
- Reusability—The software components (units of code) are clean enough in design and function to be included in the software reuse library.
- Robustness—The software is able to operate under stress or tolerate unpredictable or invalid input. For example, it can be designed with a resilience to low memory conditions.
- Security—The software is able to withstand hostile acts and influences. All corporate and personal data is secure.
- Scalability—The solution can be easily expanded, as needed. Documentation about how to add resources to the solution must be available. Hardware and virtualization designs can make this quality available; however, there needs to be a well-trained individual assigned to know when and how to scale the solution.
- Traceability—Because a single element of the design model often traces to multiple requirements, it is necessary to have a means for tracking how requirements have been satisfied by the design model.
- Uniformity—A system design that resembles a Frankenstein monster is often hard to code, debug, integrate, and maintain. A uniform design helps with these factors.
- Usability—The software user interface must be usable for its target users. Default values for the parameters must be chosen so that they are a good choice for the majority of the users. [5]
- Well-documented—The Developer Insights Report, published by Application Developers Alliance, points out that the one of the top reasons that development projects fail is because of changing and poorly documented requirements. This also includes the technical design phase.
6 Planning and Managing the Development
In EIT organizations, planning is a process that continues throughout the lifecycle of a solution. The most critical planning often occurs during the construction phase. It is also often the most difficult plan to create. The team creates the plan to include the physical/technical design activities, but the planning process continues as the team puts together detailed plans and estimates for the actual construction elements in the schedule, whether they be chunks of calendar time, sprints, feature deliveries, or the like. These plans must include time for developing and executing tests (including allowing the developers sufficient time to test their code), continuous integration, and bug fixing.
Why is it so difficult? Because there are usually sections of the construction that have never been tackled before, and the task durations and personnel needs are just good guesses. For example, algorithms that were designed in the technical design tasks might not pan out when they are constructed and tested, and thereby require additional time to refine and recode. Since not all developers have equal capabilities, log jams may develop along the critical path. People may not be sufficiently skillful at using the selected toolset. People might even get sick and have to take time off!
6.1 Construction Plan Contents
What the construction plan will look like and how it is constructed depends a great deal on the development methodology used by the construction team. If the team uses a waterfall methodology, they perform a huge amount of the planning up front and fill out and refine the plans for the detailed implementation tasks when the technical design is complete. If the team is using a rapid prototyping approach, the team constructs a high-level plan up front for the entire project that will be divided into phases. Right before each phase, the team creates a detailed plan for the upcoming phase. (Refer to the Project Management Body of Knowledge (PMBOK) [2] for detailed information about project planning.)
Recommended practices for creating useful and durable construction plans include:
- Create a detailed plan with reasonable estimates for all resources (human, facilities, HW, and SW), costs, and schedule.
- Create tasks/subtasks that are relatively short in duration and well understood.
- Understand and document the interdependencies between tasks and subtasks.
- Specify the models, language, hardware, and software tools that will be used during each task.
- Specify critical measurements with each task, such as time, quality level, tests to pass, and performance measures that need to be met.
- Make time for building in the attributes that you need to have in your solution, such as levels of quality, security, and integrability.
6.2 Regulatory and Policy Considerations
Twenty years ago, EIT departments could set their own standards and policies for their code; however, in today's world there are numerous governmental and industry regulations that need to be met, such as datacenter standards, safety standards, audit and financial control regulations, as well as security and data privacy regulations. And remember, this is in addition to whatever policies the enterprise has. Now even though these constraints should be highlighted in the requirements used by the construction team, the team must understand all of these policies and regulations, and make sure that the plan accounts for meeting all regulatory and policy requirements.
Some of the most pervasive regulations and policies are common to the areas below:
- Datacenter standards—There are a number of regulations and standards associated with the area of building and datacenter codes. From floor to ceiling tiles, air flow to electrical requirements, this area is vast and requires engineering staff who know the area well. This includes ISO/IEC 24764:2010(E) [6] and Statement on Auditing Standards No. 70 (SAS 70) [7].
- Safety standards—Safety is critically important. Many of the construction phases recommended practices and safety codes (e.g., ANSI/ISA 71.04-2013) are rooted in past incidents, and they usually require knowledgeable staff or contractors to sure that they are begin followed.
- Audit and financial controls—Financial and personnel reporting regulations (e.g., Sarbanes-Oxley Act, SOX compliance) belong to an area that has come under significant scrutiny since 2000. If the solution deals in these areas, individuals with this expertise need to be part of the team.
- Security and data privacy—Regulations associated with security and data privacy are growing at a significant rate. The team needs to understand local, state, national, and international laws these days. See the [Security chapter] for more details.
6.3 Most Common Construction Planning Mistakes
Unfortunately, construction plans often don't resemble what actually occurs during the project. Some of the differences between "planned" and "actual" are expected; however, often teams don't do a very good job of planning. The most common development planning mistakes are:
- Not anticipating or managing changes to scope.
- Not planning time for quality, security, or other non-functional requirements.
- Not leaving time for testing and fixing bugs.
- Not planning in holidays, vacations, and illness.
- Not planning in non-delivery or slow delivery by vendors.
6.4 Critical Project Management Activities
Many EIT groups do not carefully track the progress of their projects. It is a huge mistake that can end up causing a project to balloon into 200 percent or more times its original length or cost. For the most part, construction phase project management is just like project management for any other project. However, there are a few aspects that are unique, and critical to execute well to keep the project under control.
6.4.1 Taking Measurements During Construction
When you are building a kitchen, it is fairly easy to understand how much of the project you have completed and how much you have left to do. Understanding the project is visual and relatively easy. This is not the case with most EIT projects, especially when the software components are being created. And, as mentioned above, a project can get out of control very quickly. As a result, it is critical to constantly take measurements that can provide information about how much progress is being made, or how much trouble the project is in. There are two types of measurements that can be taken, direct and indirect.
Direct measurements are those that can be measured or counted exactly and directly. They include things such as costs of components, amount of effort/resources consumed, lines of code written, the number of tasks or features completed, the speed of the solution's response, the number of tests being performed on the solution, and the number of outstanding bugs.
Indirect measurements are much harder to quantify, such as the quality, complexity, stability, or maintainability of the product; however, one can often use direct measurements to get some idea of the indirect measurements.
In general, project managers need to focus on direct measurements. They need to take them frequently and they can hopefully use them to understand how well the project is progressing or when it is in trouble. Identifying the need for course corrections early always saves time and money.
6.4.2 Managing Other Parties
Usually, in EIT projects, it is as important to manage non-team parties such as stakeholders, procurement groups, and vendors, as it is to manage the construction team. These "outside" individuals or groups can totally derail a project. Managing them usually requires excellent communication skills, patience, diplomacy, and a strong managing hand. Managing third parties is an activity that needs to be continuous from the beginning to the end of the project.
6.4.3 Change Request Management
Whether your project is building a kitchen or building a CRM solution, requests for changes are going to be made to the requirements and design of the solution during the construction phase. Some issues and interdependencies can't be identified until the team is down in the bits coding basic functionality. You also can't see some problems with the interface design or flow of the application until the beta testers are let loose on the system.
So, change is going to happen. The management skill that is required for all projects is to first be able to understand whether a change is critical or non-critical, and then to be able to convince proposers that non-critical changes must wait for a future development phase. There are many techniques for keeping the user community under control, but the most useful is to show them how much the change is going to cost and how long it will slow down the delivery of the system.
In any case, having a robust change request management system is critical and it should do the following:
- Define a change request carefully and completely
- Document the business case for the change
- Document who requested the change and whether all concerned parties agree that it is important
- Document costs, potential return on investment, assumptions, and risks
- Get approval for making the change to the plan from management (usually a CAB)
7 Developing the Application
Although application development is a relative mature area of EIT, the languages, and tools are constantly in flux. Typically, each EIT department standardizes on their particular set of programming languages, development tools, programming standards, and development methodologies. Rarely is a development team allowed to bring in new construction technology without justification.
Lots of information on software development can be found in the IEEE-CS SWEBOK Chapter 3 Software Construction [8]. It is important to know that there are many options for constructing a solution from purchasing packaged solution components that can be used right out of the box (often termed a commercial off-the-shelf [COTS] solution), to purchasing solution components that need to be customized, to a component that is built completely in house.
7.1 Solution Development Options
There are many options for developing an application with respect to how many components the EIT department implements or customizes versus how much of the solution is purchased from a vendor.
- "Roll your own" solution—No matter what solution component you are talking about, when the enterprise takes on the development of the solution, it is taking on a good deal of responsibility for creating and maintaining the solution. It also takes on the responsibility for mastering and keeping up with all the technology and skills involved with developing the solution. In some instances, this commitment makes sense. In others, it does not. Each component of each solution needs to be reviewed with respect to the best method for constructing the component.
- Hiring third-party developers—Sometimes the expertise or amount of resources necessary are not available in house. In this case, people hire outside developers to create all or part of the solution. In many situations, this option is the hardest. The enterprise ends up shouldering the cost of creating and maintaining the solution throughout its lifecycle, often through the vendor that originally developed the solution component. In addition, managing outside resources to create the correct things is almost always harder than managing your in-house staff. But sometimes, you don't have another option.
- Customized packaged software—Many vendors provide software or hardware components that have most of the functionality that an enterprise needs, but they allow for customizations that accommodate critical business processes or policies. Customizations can be performed by the vendor, and vendors often provide tools (such as APIs) to enable settings to be changed, or customized modules to be developed and added to work with the rest of the software package. Again, this lowers the development and maintenance costs greatly over creating your own solution components.
- Off-the-shelf solution components—The cheapest way to provide a solution is to purchase off-the-shelf software and hardware components, whenever they are available. Not only is the purchase price generally much cheaper than any other option, typically, so is the maintenance. The vendor can amortize its efforts to maintain the code over many customers; the EIT department can't.
- Cloud-based solution components—When we think of service provided in the "cloud," we most often think of software or storage services. The fact it, there are a whole stack of services now being provided in the cloud:
- Infrastructure as a Service (IaaS)—This is the most basic cloud-service model that provides machines, servers, storage, network services, and even load balancing. IaaS can be provided as either standard Internet access or as virtual private networks.
- Platform as a Service (PaaS)—This cloud layer provides platforms whether they be execution runtimes, databases, web servers, or development tools. The customer typically does not manage any of the infrastructure for this layer, but it does have some control over which platforms are available and other settings.
- Software as a Service (SaaS) is a method of purchasing applications that are running on a cloud infrastructure. These solutions are generally stand-alone services that meet a specific business need.
- Integration between in-house and cloud services is often complex, unstable, and requires special security measures. As with the other services, SaaS can be provided through either standard Internet service or as a virtual private network.
Figure 2. Solution Development Options
It is important to note that despite the fact that a vendor is providing a service, due diligence is still required to ensure that contracts between the two parties specify exactly what the enterprise requires from the cloud provider in terms of service, performance, security, and other measures. The enterprise must understand that using cloud applications does not transfer responsibility for data and security to the cloud vendor; EIT management is still responsible for ensuring that things such as privacy and regulation controls are being met by the cloud service.
7.2 Hardware and Software Infrastructure
Writing the software for an application is only a small part of what needs to get constructed with an EIT solution. Remember that the solution will likely require hardware infrastructure and software infrastructure (middleware) components:
Hardware Infrastructure | Software Infrastructure |
|
|
7.3 Software Construction
Numerous approaches have been created to manage the development of software, some of which emphasize the construction phase more than others. These are often referred to as software development lifecycle models, or, more properly perhaps, software development methodologies.
Schedule (or predictive) models are more linear from the construction point of view, such as the waterfall and staged-delivery lifecycle models. These models treat construction as an activity that occurs only after significant prerequisite effort has been completed—including detailed requirements work, extensive design work, and detailed planning. Each defined milestone is a checkpoint for signing off on the work completed so far, and authorizing it to go ahead. It often results in "big bang" effects, as all features must go in lock step. That's different from staged delivery of capabilities, which is often a result of incremental approaches. This approach has generally been preferred by companies providing outsourced systems integration work.
Other models, usually termed iterative, are less demanding of big upfront scheduling precision, working to refine schedules as each iteration completes. They are comprised of sequences of relatively short periods of development, each such cycle using (iterating) the same sequence of steps to refine a selected set of requirements, code, build, and test the results. Some iterations may deliver working increments of the total solution; others may focus on solving specific problems, like getting the architecture right up front. Some examples are evolutionary prototyping, dynamic systems development method (DSDM), feature driven development (FDD), test driven development (TDD), and scrum. These models tend to develop by feature, so individual features may be at different stages, some already being coded or tested, while others are still being designed.
For more information, see Section <click here>>.
7.3.1 Developing and Using Best Coding Practices
Coding practices are informal rules that EIT organizations adopt that help increase the quality of the software components. These accepted practices are designed to increase the "abilities" of the code, especially reliability, efficiency, usability, and maintainability.
Recommended coding practices usually include:
- Coding conventions
- Code commenting standards
- Naming conventions
- Portability standards
- Security standards
- Modularity practices
7.3.2 Performance Tuning and Code Optimization
In some situations, going back and "tuning" the code to increase its performance or decrease its storage usage is critical. Although, it isn't always necessary, the team should include some time for code tuning in their schedule and then take the time to do it. If there is some anticipation that performance is a critical characteristic for the solution, then the team should anticipate that they will need to spend lot of time tuning.
It is important that one does not confuse high-performance code with short or pretty code. The saying that fewer lines are faster isn't always right. In addition, how to go about optimizing code is different in nearly every programming language, because knowing how the compiler translates the code into machine code is an important piece of knowing how to tune. Optimization is an art form. The best optimizers have many years of experience and they know their compilers inside and out.
7.4 System and Code Integration
Often the rubber hits the road when the integration process starts. Most of us think of integration as putting software modules together, or setting up a datacenter. The problem is that integration includes both of those activities and several more. The more complex the EIT solution, the more important it is to use a configuration management system. In addition, if the new solution needs to be integrated with a pre-existing system, the complexity increases even more unless interfaces are clearly defined and maintained as "contracts" between systems.
The configuration management process consists of four basic steps: building, packaging, testing, and deployment. There are numerous tools available to help with each step in the process. For example, common tools used to build solutions are make and Ant. Packing tools provide help with installing, upgrading, configuring, and uninstalling software. Testing tools help run automated tests on the builds (see Testing, Verifying, and Validating the Solution for more information). Deployment tools automate and regulate the deployment of software. This includes the release, install, activation, version tracking, and uninstalling processes.
Figure 3. Software Configuration Management Process and Tools
Many configuration management experts believe that the configuration management process needs to be continuous, not something that happens a couple times during the construction process and then at the end. A developer should know nearly instantaneously whether recent changes will cause issues with the rest of the solution. These fast builds are often referred to as "pre-flight" builds, because they are performed before the code is checked in. An excellent paper by Martin Fowler titled Continuous Integration suggests that:
Integration needs to be carefully planned and even more carefully executed. Communications at every interface need to be anticipated and designed, and the design must be followed during construction. All the following integration points need to be considered:
- Between modules within a code base
- Third-party software modules or applications with enterprise-developed or existing software
- Software interactions with existing clients, servers, and databases
- Software and hardware interactions with existing networks
- New solution components with existing security measures
EIT systems are often very complex and have many integration and data transfer points. Integrating new services into existing environments requires a good deal of knowledge of different technologies, processes, and policies and their interactions.
7.5 Documenting The Solution
Most developers hate to document their work, preferring getting the job done to writing about it; however, solution documentation is critical. Each layer of the solution needs to be documented, and the documentation required depends on what layer you need to document.
- For the hardware layer, documents should discuss the specs of the hardware, how they are organized, special settings, special customizations, and required maintenance.
- Documentation for the software infrastructure layer needs to describe each component and how it is being used. Any policies and procedures around using the infrastructure need to be described. Any customizations or usage assumptions need to be described.
- Database documentation needs to describe the database as a whole, but even more important is that it must be like a dictionary. It needs to describe every field, what it is used for, what its format is, and which applications of components use or set the data.
- Software documentation is critical for maintenance of the code, both finding/fixing bugs and extending the code in the future. According to The Developer Insights Report (http://www.appdevelopersalliance.org/dev-insights-report-2015-media) published by Application Developers Alliance, one of the top ten developer frustrations is maintaining poorly documented code as it takes significantly more time than maintaining well-documented code.
But what is well-documented code? It should describe what the code does, but more importantly, it needs to describe why it does what it does. Good documentation enhances the readability and transparency. It should be written for people who don't know the code already and who don't have time to read all the code to figure out what this piece does and why it's done here.
Beyond the inline code comments, other documents about the code base as a whole should be written. Often, explanatory blocks are written at the head of each section of code. Documentation should explain:
- Data structures
- Important algorithms
- Communication conventions between modules
- Critical assumptions made in the coding process
Most experienced developers believe that the time they spend writing documentation saves them or someone else even more time in the future, and if the code is being altered, understanding the code prevents people from butchering the original code. It really is worth it.
8 Testing, Verifying, and Validating the Solution
The construction team includes those who test the solution. Together, developers and testers construct the mechanisms and processes for testing the solution, as well as the test cases, verifying that the solution meets all requirements, and validating that the solution does indeed match the needs of the users. Depending on the solution, these mechanisms and processes can be quite simple, or they can be extensive and complicated.
8.1 Build Testing Suites
Testing must be done on all software and hardware constructed or used for the solution. Creating automatic and manual test suites can involve many techniques. Here are a few of the most common.
8.1.1 Solution Regression Testing
Regression testing consists of using an established set of tests to ensure that the solution behaves as designed throughout any changes. Obtaining the same results, without introducing errors, verifies that the solution continues to perform correctly and consistently despite ongoing changes to the code base, database, and hardware throughout the construction process. Regression testing is usually performed on a regular basis, typically after each new application build is generated or new hardware/firmware is installed.
Regression testing is used with many of the other techniques listed below.
8.1.2 Software Test Harnesses
Test harnesses automate the testing process. They consist of an execution engine and a set of test scripts that can be run to test the entire solution or a specific part of the solution. They can also consist of custom code that the testing team runs to exercise the solution in particular ways.
The results from the tests are collected and compared to expected results. Test harnesses provide the following benefits over manual testing:
- Increased productivity of staff
- Insurance that regression testing can occur on a regular basis, even overnight
- Accuracy and exact repeatability of tests
- Ability to set up and test uncommon conditions
8.1.3 Software Unit Testing
Unit tests run through small units of code to make sure that they work as designed. A unit can be as small as a single function, or it can consist of a set of functions or modules, maybe even an entire library. In most cases, unit tests are run automatically; however, in some cases, the tests must be run manually using a script that tells a person how to perform the test.
Unit testing has a couple of advantages:
- Issues/bugs are easier to find and fix when the tests are confined to small amounts of code.
- A developer can test their code thoroughly before integrating it with the rest of the solution. The result is usually a faster and smoother integration.
Unit testing is often a part of the regression testing suite.
8.1.4 Software and Product Integration Testing
Software integration testing occurs continually, as new code or changes to old code are added to the builds. Product integration testing adds a couple of the solution components together, tests, and then adds a few more pieces. Eventually, all hardware, software, and communications should be tested together. This process is typically known as integration testing (or integration and testing) even though software integration testing has been occurring all along. Product integration testing allows the testing team to:
- Test the interactions between components
- Test for unanticipated performance issues
There are several methods used with both types of integration testing:
- Bottom-up testing integrates the lowest-level components first and when considered stable, tests high-level components. This technique is good when the lowest-level components are done first and at about the same time. It is excellent as bugs are quite easily found.
- Top-down testing starts with the top integrated modules and tests branches of the modules step by step until the end of the related module is found. This technique allows the team to find missing branches.
- Sandwich testing is an approach that combines bottom-up and top-down testing.
- Risky module testing is an integration test that starts with the riskiest or hardest software module first.
- End-to-end testing tests the flow of an application from start to finish, even if the functionality in the flow isn't all complete. The benefit of this kind of testing is that it identifies system dependencies and tests to see if the right information is passed between the different components of the solution. It can be performed at a very early stage of the development and can save huge amounts of time when issues are found early in the construction process.
- Big bang, usage model, or production testing (used in both hardware and software testing) runs user-like workloads in integrated environments that mimic the eventual environment (often called staging environments). This type of testing not only tests the software, but also tests the environment. The downside of this type of testing is that it optimistically assumes that each of the integrated units are going to behave as planned. So although it is more efficient, if there are issues, they might be tougher to find and fix.
- Parallel testing is often included in production testing when replacing critical systems, such as payroll or ERP systems. In this type of testing, the new system is run in parallel with the existing system to make sure that the new system performs as expected, with no less functionality and no greater errors. It is not expected that all results will be the same, since the new system is expected to have more/better functionality than the old one.
- Production testing can uncover the need for datacenter upgrades or enhancements before the solution goes live, which for obvious reasons is preferred. It can also uncover the need for workstation configuration changes or workstations application incompatibilities.
8.1.5 Alpha and Beta Tests
Alpha and beta tests take integration one step further—they get the users involved. In some situations, alpha testing begins when the solution is turned over to an independent group for testing (as is typical in software product companies). In EIT, alpha tests are used to find issues with the solution at an early stage when the solution is nearly fully usable—at least there should be significant functionality to test, and the user should be able to complete significant activities. For alpha tests, the user might be an engineer or someone from the testing group. In the best case, there should be one or two users from the eventual user community involved with this testing. Future users will often find errors or problems with workflow that a developer or engineer won't. Alpha tests can last for months, as functionality is completed and refined.
Beta tests are used to ensure readiness for the solution release. They should occur when the team is pretty sure that the solution is close to ready for transition to the production environment (see the http://eitbokwiki.org/Transition_into_Operation Transition Into Operation chapter]]). The beta test often only lasts for a few weeks. Beta tests not only test the integration of the system in a user environment doing user-like activities, they also test that the system works well for the users. Beta tests help identify:
- Hard-to-find bugs
- Mismatches with the user's workflow
- User interface issues
- Performance issues
- Ambiguity or lack of clarity with instructions or the interface in general
8.1.6 Security Testing—Vulnerability Scans and Remediation
Twenty years ago, security testing consisted of making sure that the user authentication scheme was working as intended. Now, security testing, especially for web-based applications, requires careful designing and planning. Companies often have outside organizations attempt to "break in" to the applications to ensure their security design. In any case, this part of the testing process is now critically important and a significant part of the testing. It also can't be left to the very end. For more information, see Security.
8.2 Verification
The solution verification process runs parallel to the testing process. It doesn't test for minor bugs in the engineering; instead it checks to make sure that the solution correctly reflects the technical specification and that it follows coding or other implementation standards. In essence, is the construction team building the solution correctly?
Verification includes activities such as requirements/code reviews, code inspections, and code walkthroughs. All these activities are systematic reviews of computer source code that is intended to find mistakes made early in the coding phase to improve the overall quality of software.
8.3 Validation
Equally important to testing and verification, the solution needs to be validated. These reviews make sure that the construction team is building the right thing. The validation team needs to make sure that the solution correctly reflects the logical design and meets all business requirements. Most important, the validation needs to make sure that it meets customers' needs.
Alpha and beta tests are usually good ways to make sure that the solution is meeting the customers' needs. Just verifying that that the solution "does what it is supposed to do" is usually not good enough. As too many developers know, the logical design doesn't always get it right. When the users see the solution in their environment, they realize that it needs to behave differently than they thought. You can't find these things out without testing with users.
In most organizations, the validation process ends with a signoff from the user community that indicates that they accept the solution, as constructed.
9 Handing off the Solution
After the construction team has completed their testing, verification, and validation procedures they can hand the project off to the transition team; if there is no separate transition team, they can start the transition activities (see Transition Into Operation). In EIT software development, best practice today is evolving toward a DevOps approach, in which developers work with the operations and support staff to ensure a smooth transition into production.
Connecting with those responsible for the transition to standard operations is critical. The transition team needs to understand what has been constructed, and must be extremely familiar with the technical design. They need to check that the documentation is complete enough that they can execute the transition without constantly coming back to ask questions. Technical training should also be in place for the transition team.
The quality of the solution must also meet the standards of the transition team. If they believe that the solution will not work in day-to-day operations because of quality issues, likely the construction team will need to continue to make fixes to the solution until they are satisfied.
In addition, in most environments, a robust configuration management process must be in place before the handoff. The transition team will need those processes as they prepare the solution for the transition.
10 Summary
Today's EIT systems are complex with many components that must come together in a harmonious way. It takes a knowledgeable EIT team with diverse knowledge of hardware, infrastructure or middleware, databases, storage devices, network computing, and application development to ensure proper construction techniques are used to deliver right-sized infrastructure and a performant application.
Integrating a new solution with existing enterprise solutions is often challenging. It definitely adds to the complexity of the construction effort and requires not only expertise with technology, but also with the existing EIT applications.
11 Key Maturity Frameworks
Capability maturity for EIT refers to its ability to reliably perform. Maturity is measured by an organization's readiness and capability expressed through its people, processes, data, technologies, and the consistent measurement practices that are in place. See Appendix F for additional information about maturity frameworks.
Many specialized frameworks have been developed since the original Capability Maturity Model (CMM) that was developed by the Software Engineering Institute in the late 1980s. This section describes how some of those apply to the activities described in this chapter.
11.1 IT-Capability Maturity Framework (IT-CMF)
The IT-CMF was developed by the Innovation Value Institute in Ireland. This framework helps organizations to measure, develop, and monitor their EIT capability maturity progression. It consists of 35 EIT management capabilities that are organized into four macro capabilities:
- Managing EIT like a business
- Managing the EIT budget
- Managing the EIT capability
- Managing EIT for business value
The two most relevant critical capabilities are solutions delivery (SD) and research, development and engineering (RDE).
11.1.1 Solutions Delivery Maturity
The following statements provide a high-level overview of the solutions delivery (SD) capability at successive levels of maturity.
Level 1 | There is ad hoc use of solutions delivery methodologies. EIT solutions are typically delivered with wide variations in quality, schedule, and cost expectations. |
Level 2 | Basic solutions delivery methodologies are defined and applied to a limited number of EIT solution projects, which are beginning to meet expectations, but variations in quality, schedule, and cost still occur. |
Level 3 | Standardized solutions delivery methodologies are applied to most EIT solution projects, enabling many of them to regularly meet expectations for quality, schedule, and cost. |
Level 4 | Comprehensive and flexible project delivery methodologies are applied to all projects, enabling most projects to meet expectations for quality, schedule, and cost. |
Level 5 | Solutions delivery methodologies are continually analyzed and refreshed. Solutions delivery expectations for quality, schedule, and cost are nearly always met. |
11.1.2 Research, Development, and Engineering Maturity
The following statements provide a high-level overview of the research, development, and engineering (RDE) capability at successive levels of maturity.
Level 1 | The value of research into new technologies is not recognized by the organization. |
Level 2 | EIT management begins to recognize the value of research into new technologies. However, research outcomes are primarily focused on internal goals of the EIT function (as opposed to other business units' goals). |
Level 3 | The EIT function and some other business units jointly adjudicate on specific research projects, which are increasingly focused on identifying new technologies with the potential to address defined business objectives. |
Level 4 | Across the organization, regular business-driven reviews assess new technology research projects and how well they could potentially meet business objectives. |
Level 5 | Business strategy is actively informed by new technology research. |
12 Key Competence Frameworks
While many large companies have defined their own sets of skills for purposes of talent management (to recruit, retain, and further develop the highest quality staff members that they can find, afford and hire), the advancement of EIT professionalism will require common definitions of EIT skills that can be used not just across enterprises, but also across countries. We have selected three major sources of skill definitions. While none of them is used universally, they provide a good cross-section of options.
Creating mappings between these frameworks and our chapters is challenging, because they come from different perspectives and have different goals. There is rarely a 100 percent correspondence between the frameworks and our chapters, and, despite careful consideration some subjectivity was used to create the mappings. Please take that in consideration as you review them.
12.1 Skills Framework for the Information Age
The Skills Framework for the Information Age (SFIA) has defined nearly 100 skills. SFIA describes seven levels of competency that can be applied to each skill. However, not all skills cover all seven levels. Some reach only partially up the seven-step ladder. Others are based on mastering foundational skills, and start at the fourth or fifth level of competency. SFIA is used in nearly 200 countries, from Britain to South Africa, South America, to the Pacific Rim, to the United States. (http://www.sfia-online.org)
Skill | Skill Description | Competency Levels |
---|---|---|
Animation development | The architecture, design, and development of animated and interactive systems such as games and simulations. | 3-6 |
Database design | The specification, design, and maintenance of mechanisms for storage and access to both structured and unstructured information, in support of business information needs. | 2-6 |
Hardware design | The specification and design of computing and communications equipment (such as semiconductor processors, HPC architectures, and DSP and graphics processor chips), typically for integration into, or connection to, an EIT infrastructure or network. The identification of concepts and their translation into implementable design. The selection and integration, or design and prototyping of components. The adherence to industry standards including compatibility, security, and sustainability. | 4-6 |
Information content authoring | The management and application of the principles and practices of the design, creation, and presentation of textual information, supported where necessary by graphical content for interactive and digital uses. The adoption of workflow principles and definition of user roles and engagement and training of content providers. | 1-6 |
Network design | The production of network designs and design policies, strategies, architectures, and documentation, covering voice, data, text, email, facsimile, and image, to support strategy and business requirements for connectivity, capacity, interfacing, security, resilience, recovery, access, and remote access. This may incorporate all aspects of the communications infrastructure, internal and external, mobile, public and private, Internet, intranet, and call centers. | 5-6 |
Porting/software configuration | The configuration of software products into new or existing software environments/platforms. | 3-6 |
Programming/software development | The design, creation, testing, and documenting of new and amended software components from supplied specifications in accordance with agreed development and security standards and processes. | 2-5 |
Systems design | The specification and design of information systems to meet defined business needs in any public or private context, including commercial, industrial, scientific, gaming, and entertainment. The identification of concepts and their translation into implementable design. The design or selection of components. The retention of compatibility with enterprise and solution architectures, and the adherence to corporate standards within constraints of cost, security, and sustainability. | 2-6 |
Systems development management | The management of resources in order to plan, estimate, and carry out programs of solution development work to time, budget, and quality targets and in accordance with appropriate standards, methods, and procedures (including secure software development).The facilitation of improvements by changing approaches and working practices, typically using recognized models, best practices, standards, and methodologies. The provision of advice, assistance, and leadership in improving the quality of software development, by focusing on process definition, management, repeatability, and measurement. | 5-7 |
Systems installation/decommissioning | The installation, testing, implementation, or decommissioning and removal of cabling, wiring, equipment, hardware, and associated software, following plans and instructions and in accordance with agreed standards. The testing of hardware and software components, resolution of malfunctions, and recording of results. The reporting of details of hardware and software installed so that configuration management records can be updated. | 1-5 |
Systems integration | The incremental and logical integration and testing of components/subsystems and their interfaces in order to create operational services. | 2-6 |
Testing | The planning, design, management, execution, and reporting of tests, using appropriate testing tools and techniques and conforming to agreed process standards and industry-specific regulations. The purpose of testing is to ensure that new and amended systems, configurations, packages, or services, together with any interfaces, perform as specified (including security requirements), and that the risks associated with deployment are adequately understood and documented. Testing includes the process of engineering, using and maintaining testware (test cases, test scripts, test reports, test plans, etc.) to measure and improve the quality of the software being tested. | 1-6 |
User experience design | The iterative development of user tasks, interaction, and interfaces to meet user requirements, considering the whole user experience. Refinement of design solutions in response to user-centered evaluation and feedback and communication of the design to those responsible for implementation. | 2-6 |
12.2 European Competency Framework
The European Union's European e-Competence Framework (e-CF) has 40 competences and is used by a large number of companies, qualification providers, and others in public and private sectors across the EU. It uses five levels of competence proficiency (e-1 to e-5). No competence is subject to all five levels.
The e-CF is published and legally owned by CEN, the European Committee for Standardization, and its National Member Bodies (www.cen.eu). Its creation and maintenance has been co-financed and politically supported by the European Commission, in particular, DG (Directorate General) Enterprise and Industry, with contributions from the EU ICT multi-stakeholder community, to support competitiveness, innovation, and job creation in European industry. The Commission works on a number of initiatives to boost ICT skills in the workforce. Version 1.0 to 3.0 were published as CEN Workshop Agreements (CWA). The e-CF 3.0 CWA 16234-1 was published as an official European Norm (EN), EN 16234-1. For complete information, see http://www.ecompetences.eu.
e-CF Dimension 2 | e-CF Dimension 3 |
---|---|
A.5. Architectural Design (PLAN) Specifies, refines, updates, and makes available a formal approach to implement solutions necessary to develop and operate the IS architecture. Identifies change requirements and the components involved: hardware, software, applications, processes, information, and technology platform. Takes into account interoperability, scalability, usability, and security. Maintains alignment between business evolution and technology developments. | Level 3-5 |
A.6. Application Design (PLAN) Analyzes, specifies, updates, and makes available a model to implement applications in accordance with IS policy and user/customer needs. Selects appropriate technical options for application design, optimizing the balance between cost and quality. Designs data structures and builds system structure models according to analysis results through modeling languages. Ensures that all aspects take account of interoperability, usability and security. Identifies a common reference framework to validate the models with representative users, based upon development models (e.g., iterative approach). | Level 1-3 |
B.1. Application Development (BUILD) Interprets the application design to develop a suitable application in accordance with customer needs. Adapts existing solutions, for example, by porting an application to another operating system. Codes, debugs, tests, documents, and communicates product development stages. Selects appropriate technical options for development such as reusing, improving, or reconfiguring existing components. Optimizes efficiency, cost, and quality. Validates results with user representatives, integrates and commissions the overall solution. | Level 1-3 |
B.2. Component Integration (BUILD) Integrates hardware, software, or subsystem components into an existing or new system. Complies with established processes and procedures, such as configuration management and package maintenance. Takes into account the compatibility of existing and new modules to ensure system integrity, system interoperability, and information security. Verifies and tests system capacity and performance and documentation of successful integration. | Level 2-4 |
B.3. Testing (BUILD) Constructs and executes systematic test procedures for ICT systems or customer usability requirements to establish compliance with design specifications. Ensures that new or revised components or systems perform to expectation. Ensures meeting of internal, external, national, and international standards; including health and safety, usability, performance, reliability, or compatibility. Produces documents and reports to evidence certification requirements. | Level 1-4 |
B.5. Documentation Production (BUILD) Produces documents describing products, services, components, or applications to establish compliance with relevant documentation requirements. Selects appropriate style and media for presentation materials. Creates templates for document-management systems. Ensures that functions and features are documented in an appropriate way. Ensures that existing documents are valid and up to date. | Level 1-3 |
B.6. Systems Engineering (BUILD) Engineers software and hardware components to meet solution requirements such as specifications, costs, quality, time, energy efficiency, information security, and data protection. Follows a systematic methodology to analyze and build the required components and interfaces. Builds system structure models and conducts system behavior simulation. Performs unit and system tests to ensure requirements are met. | Level 3-4 |
12.3 i Competency Dictionary
The Information Technology Promotion Agency (IPA) of Japan has developed the i Competency Dictionary (iCD) and translated it into English, and describes it at https://www.ipa.go.jp/english/humandev/icd.html. The iCD is an extensive skills and tasks database, used in Japan and southeast Asian countries. It establishes a taxonomy of tasks and the skills required to perform the tasks. The IPA is also responsible for the Information Technology Engineers Examination (ITEE), which has grown into one of the largest scale national examinations in Japan, with approximately 600,000 applicants each year.
The iCD consists of a Task Dictionary and a Skill Dictionary. Skills for a specific task are identified via a "Task x Skill" table. (See Appendix A for the task layer and skill layer structures.) EITBOK activities in each chapter require several tasks in the Task Dictionary.
The table below shows a sample task from iCD Task Dictionary Layer 2 (with Layer 1 in parentheses) that corresponds to activities in this chapter. It also shows the Layer 2 (Skill Classification), Layer 3 (Skill Item), and Layer 4 (knowledge item from the IPA Body of Knowledge) prerequisite skills associated with the sample task, as identified by the Task x Skill Table of the iCD Skill Dictionary. The complete iCD Task Dictionary (Layer 1-4) and Skill Dictionary (Layer 1-4) can be obtained by returning the request form provided at http://www.ipa.go.jp/english/humandev/icd.html.
Task Dictionary | Skill Dictionary | ||
---|---|---|---|
Task Layer 1 (Task Layer 2) | Skill Classification | Skill Item | Associated Knowledge Items |
Software engineering methods (application systems development) |
Software engineering methods | Software creation methods |
|
13 Key Roles
- Application Developer
- Business Analysts
- Business Application Owner
- Business Process Owner
- Configuration Management Engineer
- Database Administrator
- Datacenter Lead
- EIT Development/Maintenance Unit Lead
- Project Manager
- Technical Lead
- Web Developer
Other key roles are:
- Data Architect
- Product Manager
- Product Owner
- Project Manager
- Security Manager
- Test Team
- User Experience Team
14 Standards
- ISO/IEC/IEEE 24765:2010 Systems and Software Engineering—Vocabulary
- ISO/IEC/IEEE 15288:2015 Systems and software engineering—System lifecycle Processes
- IEEE 802.1QCD-2015—IEEE Standard for local and metropolitan area networks—Bridges and bridged networks—Amendment 23: Application virtual local area network (VLAN) type, length, value (TLV)
- IEEE Std 828-2012—IEEE Standard for Configuration Management in Systems and Software Engineering
- ISO/IEC 24764:2010 Information technology—Generic cabling systems for data centers
- ANSI/ISA 71.04-2013—Environmental Conditions for Process Measurement and Control Systems: Airborne Contaminants
- IEEE Std 1012™:2016, IEEE Standard for System and Software Verification and Validation
- ISO/IEC/IEEE 12207:2016, Systems and software engineering—Software lifecycle processes (in preparation)
- ISO/IEC/IEEE 29119, Systems and software engineering—Software testing (in 4 parts)
15 References
[1] Deming, W. Edwards (1993). "The New Economics for Industry, Government, and Education" Boston, Ma: MIT Press. p. 132. ISBN 0262541165.
[2] Project Management Institute, "A Guide to the Project Management Body of Knowledge (PMBOK Guide)—Fifth Edition", PMI Inc., 2013; https://www.pmi.org/pmbok-guide-standards
[3] The Data Management Association, "The DAMA Guide to The Data Management Body of Knowledge (DAMA DMBOK Guide)", First Edition, Technics Publications, LLC, 2009, Section 5.2.4.1.1, p. 103
[4] Marc L. Songini, "QuickStudy: ETL", Computer World, Feb 2, 2004; http://www.computerworld.com/article/2575153/business-intelligence/quickstudy---etl.html
[5] Anne Stuart, "TechTarget Business Term Glossary", Feb. 2012; http://whatis.techtarget.com/definition/business-process-modeling
[6] International Organization for Standards, "ISO/IEC 24764:2010", http://www.iso.org/iso/catalogue_detail.htm?csnumber=43520
[7] Data Center Knowledge, "SAS 70, SSAE 16, SOC and Data Center Standards" Industry Perspectives, March 2011; http://www.datacenterknowledge.com/archives/2011/03/03/sas-70-ssae-16-soc-and-data-center-standards/
[8] IEEE Computer Society Products and Services, Guide to the Software Engineering Body of Knowledge, Version 3.0, IEEE-CS, Chapter 3 Software Construction.
15.1 Outstanding Sources
McConnell, Steve. (2004) Code Complete (Second ed.). Microsoft Press. ISBN 0-7356-1967-0.
Meek, Brian; Heath, Patricia (1980), Guide to Good Programming Practice, Ellis Horwood, Wiley.
International Institute of Business Analysis, "A Guide to the Business Analysis Body of Knowledge® Version 2.0", IIBA, 2009, p. 4.